Home / Financial Firm (Unknown - Insurer) / Determination 442696
Determination 442696
Cash settlement offer for cyclone building damage held inadequate; scope of works, windows and doors, accommodation and additional costs disputed
Summary
The applicant's cyclone building claim was disputed over scope of works, window and door replacement, contingencies, temporary accommodation and additional costs. AFCA ordered further building, window, accommodation and additional benefit payments, plus $1,000 non-financial loss, and rejected the invoiced historic rent and the full dog care amount; ongoing rent from 1 June 2017 at $280 per week is also payable.
The cyclone contributed to deterioration of the windows and doors, so the FSP should contribute 50% of replacement costs and a 10% contingency, consistent with utmost good faith when cash settling.
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case No: 442696 Determination Page 1 of 8
Case number: 442696 20 September 2017
1 Overview
1.1 Dispute
The applicant lodged a claim on his Home and Contents Policy held with the financial
services provider (FSP) following damage to the property during Cyclone Marcia in
February 2015.
The FSP accepted liability but a dispute arose as to the scope of works. Before this
dispute was resolved the property suffered further damage from Cyclone Debbie in
March 2017.
Whilst the FSP has accepted liability with respect to further damage sustained, the
parties remain in dispute as to the full scope of works.
The applicant also seeks payment for alternative accommodation and compensation
for stress and inconvenience.
1.2 Issues and key findings
Is the FSP’s offer for building damage fair in all the circumstances?
The FSP’s scope of works and offer does not cover the replacement of the window
and door seals or adequately account for the contingencies that are likely during the
repair process.
I am satisfied there was further damage to the windows and door seals during
Cyclone Marcia and that it is fair that the FSP contribute $8,482.56 being 50% of the
cost of replacement and installation of the windows and doors. I am also satisfied
that the FSP should pay an additional $9,212.50 being 10% of the scope of works to
cover the potential contingencies that may arise during the repair process.
Is the applicant entitled to any additional benefits under the policy?
The applicant has required alternative accommodation during the course of the claim
and also incurred additional costs. I consider it fair in the circumstances the FSP pay
the applicant the amounts set out in section 2.
Is the applicant entitled to compensation?
The applicant is entitled to compensation for non-financial loss for the stress and
inconvenience during the course of the claim of $1,000.
Case No: 442696 Determination Page 2 of 8
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is to settle the applicant’s claim in acc ordance with the directions outlined in
section 2 of this determination as follows:
$101, 337.50 …building costs
$8 ,482.56…… contribution to repair/replacement of doors and windows
$2, 800 …………loss of rent
$1,000 …………accommodation for pets
$12 ,226.70……. additional benefits
$1, 000………….non -financial loss
In addition the FSP is to pay the applicants rent from 1 June 2017 to date of payment
of this determination at the rate of $280 per week.
No interest is payable on this determination.
.
Case No: 442696 Determination Page 3 of 8
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Is the FSP’s offer for building damage fair in all the circumstances ?
Applicant has established valid claim
There is no dispute the applicant had a valid claim under the terms of the policy.
There is no dispute the insured property sustained damage during the Cyclone
Marcia on 20 February 2015, which was during the period of insurance. An assessor
(EA) inspected the property and identified damage from cyclonic winds and
subsequent rain water entry to the property.
Subsequent to the dispute coming to our Service, the property sustained further
damage following Cyclone Debbie in March 2017. There is no dispute this storm
caused further damage to the property during the period of insurance.
Initial scope of works inadequate
Following the damage caused by Cyclone Marcia, the FSP obtained a scope of
works from RPF and offered to cash settle the applicant’s claim for $27,317.44.
In September 2015 the applicant submitted his own quotation for building damage
from PBA for $70,359 plus an additional $3,503.50 for the repair of a shed fence.
The FSP subsequently offered to cash settle the applicant’s claim for $30,820.94.
The initial scope of works did not adequately cover the damage claimed.
The property remained unrepaired and the FSP was notified that further damage had
occurred. Delays occurred in obtaining a new scope of works.
The new scope of works was eventually obtained from NC and an offer was made on
29 November 2016 to settle the claim for $77,609 for the building works plus four
weeks for the accommodation.
The issues had not been resolved when the property sustained further damage
during Cyclone Debbie in March 2017.
Following this the FSP obtained a further quote from NC and offered to cash settle
the claim as follows:
$92,125 for the building works
$1,000 for the care/accommodation for his dogs
$1,000 for the replacement of damaged plants
Six weeks temporary accommodation.
Case No: 442696 Determination Page 4 of 8
Scope of works should include an allowance for the damage to the window and
door seals
The scope of works provided by the FSP does not take into account replacing the
damaged windows and door seals which allow water and wind ingress into the
property.
The applicant has provided three reports in relation to the windows and says:
the scope of works only allows for caulking, which is a temporary fix
it does not return them to be fit for purpose
it does not meet current building regulations.
The FSP maintains that the rubber seals around the windows had perished due to
long term exposure and that the condition was present prior to Cyclone Marcia.
The FSP’s builder MC acknowledges that the correct repair procedure would be to
replace the window rubber seals, but as these were not damaged by the Cyclone has
included the cost of caulking the windows as a temporary fix. MC also considered the
door seals had deteriorated over time due to long term exposure and says they
would leak in wind driven rain as the seals deteriorated to the point of being
ineffective.
A certifier PCG notes that the windows require appropriate seals being installed and
that given the existing age of the windows they may not comply with relevant glazing
thickness, frame structure or required fixings to the framework. PCG considered the
only way to repair the damage was to replace the window unit as there is no other
way to comply with current legislative requirements.
A building surveyor RBA noted that as the roof will be replaced, this will change the
performance of the building envelope. He considered that the windows and doors will
need to be upgraded to meet the current standards for C3 wind load.
The applicant also provided an email from a manager of building services (TM), who
commented on the use of silicone for the repair of cyclone damaged window gaskets
within aluminium window joinery. TM says Australian Standard 2047 does not cover
the use of silicone in an attempt to repair existing window joinery.
I accept the window and door seals showed evidence of wear and tear and
deterioration. However the available information indicates that the Cyclone did impact
on the windows and doors leading to further deterioration.
Fair in the circumstances FSP contribute towards windows and doors
The policy wording states the FSP will pay the insured:
‘ what it would cost us to rebuild, replace or repair your home so that it is returned, as far as
possible, to its original condition or, if it has been renovated, to its condition when last
renovated. ’
The policy is also clear that the FSP will not pay to upgrade any aspect of the
property:
‘ We will not upgrade your home if you have over insured it, nor will we improve or pay any
amount to improve your home to a better standard, specification or quality to its original or
renovated condition. ’
Case No: 442696 Determination Page 5 of 8
The building surveyor RBA acknowledges the windo ws and doors had deteriorated
from age as well as the cyclone. The report does not indicate that the seals were not
functional prior to the cyclone.
The FSP’s expert PCG confirms the windows and doors must be upgraded to comply
with current Australian standards
The applicant provided the following quotations for new windows and their
installation:
$8,916.46 for windows
$1,153.93 for windows and doors
$6,894.72 to remove and replace windows and doors.
The FSP has not commented on the reasonableness of these quotations.
I am satisfied given the terms of the policy and the nature of the information provided
that the Cyclone has contributed to the deterioration of the seals and need for the
windows and doors to be replaced.
It is fair in the circumstances that the FSP contribute 50% to the costs associated
with the replacement of the windows and doors.
Based on the quotations provided by the applicant, the FSP should pay a further
$8,482.56 being 50% of the quoted costs to replace the windows and doors.
FSP’s ca sh settlement offer for building damage should be increased to allow
for contingencies
The applicant seeks an additional $9,000 for contingency for any potential
undiscovered damage when repairs commence.
Whilst the FSP’s policy provides the FSP with an o ption whether to cash settle or
repair or replace the damaged property, when exercising the discretion to cash settle
the claim, the FSP should do so reasonably and consistent with the principles of
utmost good faith.
By cash settling the applicant’s clai m, the FSP transfers the risk of such
undiscovered damage being found to the applicant. The FSP’s policy also provides
the applicant with a lifetime guarantee on repairs completed by the FSP. Again, by
cash settling the claim, the FSP is able to avoid the lifetime guarantee.
The applicant has correctly identified that there is potential for undiscovered damage
to be found during the repair process however he is also an experienced builder
which is likely to limit any contingencies.
Taking into account the a pplicant’s quotations for additional costs, the potential
unidentified damage and the transfer of the risk to the applicant, in my view, it is fair
in the circumstances that the FSP provide a further allowance of 10% of MC’s scope
of works. As MC assessed the cost to repair the building damage at $92,125, the
FSP should increase the cash settlement offer for the building works by $9,212.50
Case No: 442696 Determination Page 6 of 8
2.2 Is the applicant entitled to any additional benefits under the policy ?
Applicant says temporary accommodation required
Throughout the course of the dispute the applicant maintained the property was
unliveable, requiring him to live in a shed on another property. The FSP has not
provided any information to show it offered temporary accommodation to the
applicant during the claim.
The FSP offered six weeks temporary accommodation in addition to the building
cash settlement. It based its offer on NC ’s scope of works, which estimated a four
week repair period.
The applicant says his family has not lived in the property since Ma rch 2015, and
seeks temporary accommodation from this date, as well as a further 12 weeks
temporary accommodation to complete repairs .
The applicant provided the following in support:
$32,528.56 invoice for rent from 1 May 2015 to 31 May 2017
Tenancy agreement from 1 June 2017 to 31 May 2018.
The policy states:
If you are unable to live in your home after loss or damage that is covered by this policy has
occurred, we will pay up to 20% of the home sum insured, for the additional cost of
reasonable temporary alternative accommodation where the home is your principal place of
residence.
We will also pay the cost of alternative accommodation for your pets, and additional living
expenses up to $1000.
We will reduce the amount we pay you, or stop paying you, if:
- you receive any payment for accommodation from another source, or
- you do not need to pay for alternative accommodation.
The applicant provided an invoice on his own company’s letterhead for rent payable
for the period May 2015 to May 2017. Whilst the applicant provided this invoice, he
says he has not paid this amount and there is little evidence to show the applicant is
required to pay it, given his own company issued the invoice.
The FSP did not comment on this invoice. I note from the applicant’s earlier
submissions he indicated he was living in a shed at his own property. In the absence
of evidence to show the applicant had actually paid the amount claimed on the
invoice for that temporary accommodation, I am not satisfied that the applicant has
established an entitlement to that benefit.
The tenancy agreement from 1 June 2017 states the rent is $3,640. The applicant
says he pays the amount quarterly, representing a payment of $280 a week. I am
satisfied the applicant has entered into a new tenancy agreement effective from 1
June 2017 and has paid rent at the rate of $280 per week from that date.
In my view, it is fair in the circumstances that the FSP pay the applicant:
rent paid at $280 per week from 1 June 2017 to the date of this determination
ten weeks temporary accommodation at $280 per week for the repair period.
Case No: 442696 Determination Page 7 of 8
FSP to settle for additional benefits
The applicant says the storm damaged the garden and he incurred additional costs,
such as the use of tarps, rubbish removal and emergency repairs. The applicant also
sought costs for an electrical check for $1,420, however he did not provide any quote
in support.
The applicant provided the following in support:
$706.72 quotation for hardware
$1,050 invoice for removal of asbestos gutters
$3,750.78 invoice for a container hire from 15 March 2015 to 30 June 2017
$5,195.30 invoice for emergency repair and materials
$1,523.90 quotation for replacement garden (including quote for plants).
The FSP offered $1,000 for the replacement of damaged plants. It says the
maximum cover under the policy is for $500 per plant up to $5,000 in total. It did not
address the other items the applicant requested.
In the absence of any submissions from the FSP to dispute the invoiced amounts, I
am satisfied the FSP must pay the amounts supported by quotes or invoices:
$706.72 for hardware
$1,050 for removal of asbestos gutters
$3,750.78 for a container hire from 15 March 2015 to 30 June 2017
$5,195.30 for emergency repair and materials
$1,523.90 for replacement garden.
FSP offered maximum entitlement for dog care/accommodation
The applicant also sought $6,000 for the care/accommodation for his dogs. He says
he was required to leave his dogs at the property and travel to and from the property
regularly.
The FSP says $1,000 is the limit under the policy for dog care/accommodation.
I consider the policy wording is clear and the FSP is entitled to limit its cash
settlement offer to $1,000 for this aspect of the claim.
2.3 Is the applicant entitled to compensation?
Compensation warranted in the circumstances
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
(capped at $3,000) for non-financial loss where an applicant has suffered an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
The applicant seeks compensation for non-financial loss due to the level of service
and delays.
The claim notes indicate the FSP made regular contact with the applicant during the
course of the claim and made cash settlement offers that were not responded to by
the applicant for some time.
Case No: 442696 Determination Page 8 of 8
However, the applicant was unable to live at home for the last two years, and the
FSP has not addressed whether temporary accommodation was offered during the
course of the claim. Considering the issues with mould at the property, the FSP
should have made an offer for this period of time. In the circumstances, it is clear the
applicant and his family suffered an unusual degree of stress and physical
inconvenience during the claim process.
I consider it fair in all the circumstances the FSP pay the applicant $1,000 in
compensation for the claims experience.