Water damage claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-01-04
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner of a strata unit claimed for water damage under the body corporate's residential strata policies held by two insurers. AFCA found the damage developed gradually, so FSP1's sudden-event cover did not respond, but FSP2's accidental-damage cover applied and it must pay 50% of repair costs plus 50% of any loss of rent.

The damage developed gradually across two policy periods, so FSP1's sudden-event cover did not respond, while FSP2 failed to establish that its exclusion for failure to take reasonable care applied.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 418706 & 442357 Determination Page 1 of 7 Case numbers: 418706 & 442357 21 December 2016 1 Overview 1.1 Dispute The applicant is the owner of a unit which was part of a Residential Strata Property. On 16 November 2014, she lodged a claim through her broker on the Residential Strata Policy held by the body corporate for damage sustained to her unit. The financial service provider (FSP1) insured the body corporate under a Residential Strata package from 13 June 2013. The financial service provider (FSP2) insured the body corporate from 30 June 2011 to 30 June 2013 under its Strata Insurance Policy. There is no dispute the applicant‟s unit has sustained water damage affecting both the kitchen and laundry. FSP1 formed the view following investigation of the claim that most likely the damage had first occurred prior to it coming on risk on 30 June 2013. The applicant lodged a claim with FSP2 on 20 July 2015 for the damage. FSP2 declined the claim on the ground that the applicant had not established a claim under the terms of the policy and relies upon the exclusions contained within the policy. 1.2 Issues and key findings What is the cause of the damage? The Panel is satisfied having considered the various reports provided that the cause of the damage to the applicant‟s unit was a combination of factors. The Panel accepts the findings from the latest building report from SH tha t the cause of the damage was most likely a combination of water escaping the dishwasher waste inlet, water leaking from a washing machine tap and/or appliance water flowing internally through the top of the cavity sliding door during extreme rain events a nd water flowing from unit 6. When did the damage occur? The Panel is satisfied that the damage occurred progressively over time and most likely during the period of cover under the policies held with FSP1 and with FSP2. Does the applicant have a claim as against FSP1? The Panel accepts that the policy provides cover for loss or damage occurring during the period of cover (from 30 June 2013) caused by an Event. An “Event” is an occurrence or accident resulting in sudden and unforeseen physical loss or destruction. Case No: 418706 & 442357 Determination Page 2 of 7 The Panel accepts that as the damage most likely occurred gradually and was not sudden and unforeseen physical loss, it is not covered under the policy with FSP1. Has the applicant established a claim against FSP2? The Panel is satisfied that the applicant‟s property suffered damage during cover provided by FSP2 from 30 June 2011. The Panel is satisfied that the damage was accidental loss or damage within the terms of the policy and therefore covered under the terms of the policy. The Panel acknowledges that not all of the damage can be attributed to the period of cover during which FSP2 was on risk and in the circumstances believe it is fair and reasonable that FSP2 pay 50% of the cost to rectify the damage to the applicant‟s property. Should the property become uninhabitable or access prevented during any repair, the FSP should pay 50% loss of rent received during the repair period. 1.3 Determination This determination is partially in favour of the applicant. The Panel determines that it is fair in the circumstances that FSP2 pay 50% of the assessed cost of repair of the applicant‟s property, plus 50% of the loss of rent if any suffered during the repair period. Otherwise FSP1 and FSP2 are entitled to refuse payment of the balance of the applicant‟s claim. Case No: 418706 & 442357 Determination Page 3 of 7 2 Reasons for determination As the damage to the applicant‟s property occurred over the period that FSP1 and FSP2 were on risk, it was considered appropriate that FSP2 be joined to this dispute in accordance with paragraph 7.4 of the Terms of Refere nce. There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise in this dispute. In view of the complexities involved in this dispute, it has been referred to a Panel for determination. The Panel has had the opportunity of reviewing all information exchanged and has based this determination on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including relevant codes of practice and prior determinations where applicable. 2.1 Has the applicant established the cause of the damage? The applicant has the onus to establish on the balance of probabilities a claim that falls within the terms of cover. This is commonly known as a prima facie claim. Once established, the onus then shifts to the FSP to establish on the balance of probabilities the application of any particular exclusion. Circumstances of the loss According to the information exchanged, the applicant ‟s tenant who had resided at the property for 15 years, first noticed water pooling on the tile floor of the laundry in September 2014. A claim was subsequently lodged by the applicant through her broker with FSP1 on 16 November 2014. In support of the claim, the applicant provided a report from a plumber SBP who said he undertook testing of the area and in particular the sky light above the laundry. He removed the bottom plate in the section of plaster board wall which revealed the timber had rotted to the point of disintegration. SBP considered that the damage was caused as a result of rainwater leaking in through the sky light. The FSP appointed CL, a loss adjustor to inspect the property. In the initial report, it was noted that there was a common timber wall between the applicant‟s unit (unit 7) and a neighbouring unit (unit 6). There was an issue with a leak in unit 6 and CL noted that any leak/escape of water in unit 6 is likely to track beneath the common timber wall and affect both units. CL appointed SBC who considered it necessary for a leak detection test to be conducted. The leak detection test did not reveal any evidence that the water supply pipes or waste pipes were the source of any water leak. It did concede that water could have leaked from a waste connection pipe that had not been properly sealed. A plumber found evidence of a leak from a hose connected to the washing machine and gaps between the tiled floor and skirting could have allowed water to escape into the wall cavity over time. Case No: 418706 & 442357 Determination Page 4 of 7 SBC considered that water had flowed into the wall cavity at the rear of the laundry causing damage to the timber framing and it also tracked through the wall cavity resulting in damage to the kitchen cabinets in both units 6 and 7. According to CL, water usage in unit 6 from November 2012 until December 2014 was excessive. SBC dismissed the likelihood of damage being caused through the leaking skylight. A claim was brought against FSP2 on 20 July 2015. FSP2 appointed its own assessor after the claim was rejected by FSP1. According to the FSP2‟s assessor, the applicant‟s tenant A had reported noticing the water on the tiled floor of the laundry and damage to the laundry and kitchen cabinetry in September 2014 following severe rain. The Panel accepts that the severe rain may not have occurred in September 2014 but likely occurred in August 2014. FSP2‟s assessor confirmed that the damage to each unit was consistent with water damage which he considered was possibly due to two events, one from storm and one from a burst pipe which had been unidentified. FSP2 appointed a building group JLB who provided a report on 15 April 2016. JLB formed a view after reading all relevant reports that most likely the damage to the dividing wall between units 6 and 7 as well as all damage to the kitchen cabinets, walls and laundry were a long term effect of a water leak which logically could be isolated to the braided lines to the kitchen sink connection of unit 6. As the actual cause of the damage and timing of the damage could not be resolved, it was agreed by all parties that a further engineering report be obtained. That report has been provided by SH and is dated 23 September 2016. SH had the opportunity of reviewing all reports provided and also attending the property, meeti ng with the tenant at unit 7 and the representative for unit 6. The report is detailed and noted the following: „ Unit 7  Kitchen – duct tape over dish-washer waste intake  Laundry – water damage to timber frame  Laundry inspection hole where plumber made initial investigation Unit 6  Laundry – water collecting on floor from leak in washing machine tap  Laundry – calcium staining on hot water hose to washing machine  Water dripping from cold water tap to dish washer  Roof inspection – maintenance issues or defects  Broken roof tiles have been siliconed together  Sarking installed under roof batons  Timber to gable dressing rotten Unit 7  Water has escaped from the S trap where the dish-washer would have been attached causing damage to the kitchen cupboards – this would have occurred before September 2014 Case No: 418706 & 442357 Determination Page 5 of 7  Slow leak to the washing machine taps and/or combination and/or appliance happening over an extended period causing wall framing to decay – this was maintenance prior to September 2014  In extreme rain events, water escaping over the back of the eave gutter and flowing internally through the top of the cavity sliding door. The Panel has considered all of the various reports and is persuaded by the findings reached by SH. The Panel is satisfied that the water damage occurred over an extended period of time due to a number of events including water escaping from the S trap where the dish-washer had been attached, water escaping from the washing machine attachments and storm water entering the property. The Panel is satisfied that this caused the damage to the kitchen cupboards, skirtings in the meal rooms, damage to the laundry and cavity wall as well as additional damage to the floor tiles. 2.2 When did the damage occur? The information provided in particular the information provided by SBG and SH establishes that most likely the damage to the applicant‟s property occurred over time and during the period of cover with FSP2 from 30 June 2011 until 30 June 2013 and with FSP1 from 30 June 2013. Insofar as the cause of the damage arising from the leaking dishwasher water inlet under the sink is concerned, the Panel accepts that this damage would be gradual and not sudden or from a single event. Insofar as the damage is attributed to leaking washing machine taps or a combination from both unit 7 and unit 6, the Panel accepts that this occurred over an extended period of time. Insofar as there was damage to the cavity wall and additional damage to the tile adhesion, the Panel accepts that this most likely occurred over time as a result of a combination of the above events together with water escaping and flowing internally into the area during heavy storms. 2.3 Has the applicant established a claim against FSP1? The Panel is not satisfied that the applicant has established a claim against FSP1. Although the Panel accepts the applicant may not have become aware of the damage until September 2014, the Panel is persuaded based on the available information that the damage commenced during the period of cover with FSP2 and prior to the commencement of cover with FSP1 on 30 June 2013. Under the policy with FSP1, cover is provided for physical loss or damage occurring during the period of cover 30 June 2013 and onwards) caused by an Event and not otherwise excluded. An Event is described as an occurrence or accident occurring or resulting in a sudden unforeseen physical loss or destruction of or damage to insured property. Case No: 418706 & 442357 Determination Page 6 of 7 The Panel is satisfied that the damage developed over time and not as a result of an event meaning an occurrence or accident that resulted in a sudden and unforeseen physical loss or destruction of the property. Based on the available information the Panel is not satisfied that the applicant has established on the balance of probabilities a claim against FSP1. 2.4 Has the applicant established a claim against FSP2? The Panel is satisfied that the applicant has established a claim for part of the damage as against FSP2. The Policy with FSP2 provides cover for accidental loss or damage to the building or common contents which occurs during the period of insurance. The policy defines, under the general definition section, an occurrence as meaning an event, including continuous or repeated exposure to substantially the same general conditions, which results in personal injury or property damage, neither expected nor intended to happen. Based on the available information, the Panel is satisfied that at least part of the damage occurred as a result of the continuous leaking of water from the dish-washer connection and from the washing machine connections. The Panel is also satisfied that the damage was contributed to by water leaking through the cavity wall from the adjoining unit. The Panel accepts that this is properly classified as accidental damage as a result of repeated or continuous exposure of the same general conditions within the terms of the policy. FSP2 has not established exclusion applies The onus is therefore on the FSP if it wishes to avoid liability to establish the application of any relevant exclusion. The FSP has suggested that the applicant failed to take reasonable care to maintain the property. The relevant test to determine whether the applicant failed to take reasonable care is a subjective test. It is not an objective test. The FSP is required to establish on the balance of probabilities that the applicant having recognised the issue with the leaking pipes and taps either deliberately or recklessly failed to take any action to prevent the damage occurring. There is no evidence that the applicant recognised the risk associated with the water leaking into the laundry and kitchen areas. There is no evidence that the applicant was aware of this until at least September 2014 when the tenant reports noticing the pooling of water. In fact, the actual cause of the damage was not identified until the FSP‟s experts had inspected the property. The Panel is not satisfied that the FSP has established the application of the exclusion. FSP2 liable for part of the damage The Panel is satisfied that not all of the damage occurred during the period of cover with FSP2. Case No: 418706 & 442357 Determination Page 7 of 7 In this regard, the Panel is unable to determine precisely, from the information exchanged the extent to which the damage can be attributed to the first period of cover. The Panel accepts the water readings referred to by CL suggest the increased moisture is likely to have developed in 2012 or earlier. The Panel also accepts that additional damage due to storms may have occurred after FSP2 went off risk on 30 June 2013. The Panel has considered the various options available and believes in the circumstances, it will be fair if FSP2 met 50% of the applicant‟s claim for the cost to repair the damage sustained to unit 7. In the event that the applicant has not already repaired the property, then FSP2 is entitled to obtain a quotation for the cost to complete the repairs and to settle the applicant‟s claim on the basis of payment of 50% of what it would cost FSP2 to repair the property. The policy also provides for additional benefits in the event that temporary accommodation is required or there is a loss of rent received as a result of the damage. The Panel understands the applicants‟ property is rented. Under the terms of the policy if the property is rendered uninhabitable or access is prevented the FSP will meet the cost of any temporary accommodation or loss of rent received during the period that the property cannot be accessed. Should the property be rendered uninhabitable or inaccessible during the repair period the FSP should pay 50% of the loss of rent which would otherwise have been received during the repair process.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.