Home / Financial Firm (Unknown - Insurer) / Determination 442275

Determination 442275

Roof replacement claim declined as gradual deterioration

FirmFinancial Firm (Unknown - Insurer)
Decided2017-06-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for roof replacement after a February 2015 cyclone, after the FSP accepted gutter and internal water damage but declined the roof. AFCA found on the balance of probabilities that the roof damage was caused by gradual deterioration, which is excluded, and ordered nothing.

The FSP discharged its onus under the gradual deterioration exclusion given the poor roof condition, the contractor's inspection, and the lack of contemporaneous evidence of cyclone damage.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 442275 Determination Page 1 of 5 Case number: 442275 5 June 2017 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP), following a cyclone in February 2015. The applicants’ initial claim was limited to the costs of food which spoiled due to a power outage during the cyclone. The FSP accepted the claim and cash settled the applicants for $250. In August 2015, the applicants notified the FSP that their roof had been damaged during the cyclone. In December 2015, they advised that the property had also suffered internal water damage. The FSP accepted the applicants’ claim for damage to the roof gutter and internal water damage to the property. However, the FSP denied cover for damage to the roof, on the basis this damage had not been caused by the cyclone but was due to gradual deterioration. The applicants dispute the FSP’s denial and seek cover for the cost of replacing the roof. 1.2 Issues and key findings Is the FSP liable for the cost of replacing the roof? The available information establishes that, on the balance of probabilities, the damage to the applicants’ roof (other than the gutters) was caused by gradual deterioration and not by the cyclone in February 2015 . Accordingly, the FSP is not liable for the cost of replacing the roof. 1.3 Determination This determination is in favour of the FSP. The FSP is not liable for the cost of replacing the applicants’ roof . Case No: 442275 Determination Page 2 of 5 2 Reasons for determination 2.1 Is the FSP liable for the cost of replacing the roof? Applicants have established a prima facie claim The applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie (or valid) claim. If the applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicants’ p olicy provides cover for damage caused by the events listed in the policy (including the insured event of storm), subject to the conditions and exclusions set out in the policy. The FSP does not dispute that the applicant’s property was affected by strong winds during the cyclone in February 2015. The FSP has accepted liability for the cost of replacing approximately 13 linear metres of roof guttering blown off during the storm. On this basis, I am satisfied that the applicants have established a prima facie claim for storm damage. However, the current dispute concerns the extent of the damage to their property caused by the storm. FSP’s liability depends on cause of damage to roof The applicants say the strong winds experienced during the cyclone in February 2015 caused the iron roof sheets to lift and blew away the heads of the nails used to fasten the roof sheets. The applicants say this has resulted in leaks and ongoing water entry. The FSP says the damage caused by the cyclone was limited to the roof gutters. The FSP says any other damage to the roof has occurred as a result of gradual deterioration, which is excluded from cover under the policy. As the FSP is seeking to rely on a policy exclusion, it bears the onus of establishing that, on the balance of probabilities, the damage to the roof was caused by gradual deterioration and not by the cyclone in February 2015. Contractors have provided conflicting opinions As outlined above, the applicants lodged a claim for spoiled food immediately after the cyclone. However, they did not notify the FSP that there was any damage to the roof (or water damage to the interior of the property) until approximately six months later. It is not clear why the applicants delayed lodging their claim for property damage, given this was by far the more significant aspect of the claim. Case No: 442275 Determination Page 3 of 5 After the applicants notified the FSP of the damage to the roof, the FSP appointed a builder (CQ) to attend the property and inspect the damage. CQ engaged a roofing plumber (RP) to carry out an inspection of the roof. RP confirmed that the strong winds experienced during the cyclone had stripped the gutters and brackets from the fascia. He noted that the older style construction methods used would have contributed to this damage. In his report, RP advised that the remainder of the issues with the roof were due to ‘natural disrepair’. In particular, he noted that a lot of the roofing sheets were rusted due to age and showed signs of previous patching, which had caused leaks to the interior of the property. RP noted that all of the fasteners used to attach the roof sheets were old lead head nails, some of which were loose, missing or had rusted off due to age. After the applicants advised they had collected a large number of nail heads following the cyclone, the FSP sought clarification from RP as to whether this damage might have been caused by the strong winds experienced during the cyclone. In response, RP advised that, had the cyclone caused damage to the lead nail heads, he would have expected to see signs of multiple roof sheets having lifted. However, his inspection had not shown any evidence of such damage. The applicants dispute RP’s findings about the extent of the damage to the roof. They have provided a two line statement from their own roofing contractor (LL), who replaced the roof in March 2016. In his statement, LL says he ‘completed an inspection report’ of the roof and noted that the iron roofing sheets (as well as the battens and nails) had lifted in some areas. LL advised that the damage appeared to have been caused by a cyclone or large storm. Damage was caused by gradual deterioration Having carefully reviewed the available information, I am satisfied that, on the balance of probabilities, the damage to the applicants’ roof (other than the gutters) was caused by gradual deterioration and not by the cyclone in February 2015. The first inspection of the roof undertaken following the cyclone was carried out by RP, who did not identify any cyclone related damage to the roof sheeting. RP’s report contains a number of close up, colour photographs of the roof, which suggests he carried out a thorough inspection. The photographs included in RP’s report confirm there were a number of areas of visible rust on the roof sheeting, as well as signs of previous patch repairs. RP described the roof as being in a bad state of disrepair. The applicants have confirmed that roof repairs were carried out in or around July 2014, to address a leak in the kitchen area (although they say the roof was returned to a watertight condition following these repairs). The applicants say the number of detached nail heads indicates that the cyclone caused significant damage to their roof. However, in his initial report, RP noted that Case No: 442275 Determination Page 4 of 5 many of the nail heads were in poor condition (old and rus ty), which could not be attributed to the cyclone. The applicants also note that RP did not undertake his inspection until approximately six months after the cyclone occurred. However, as outlined above, this was because the applicants’ initial claim for cyclone damage did not include their roof. During the claim process, the applicants were provided with the opportunity to obtain a report from their own roofing contractor , in order to dispute RP’s findings. T his might have been helpful, given the roof had not yet been replaced and therefore a detailed report (including photographic evidence) could have been provided. However, the applicants did not obtain a report from their roofing contractor (LL) until November 2016, almost nine months after the roof was replaced. As outlined above, LL’s report is brief and does not include any explanation of the basis for his view that roof sheets, battens and nails had lifted during the storm. Further, neither the applicants nor LL have provided any photographs of the claimed damage which would support their position. The applicants say the fact that the FSP accepted liability for internal water damage to the ceilings and walls at their property establishes that the cyclone also caused damage to the roof. However, the FSP was not notified of the internal water damage until December 2015, almost ten months after the cyclone. While the FSP has accepted liability for this damage, it notes that the leaks which caused it could have occurred at any time during the intervening period. The applicants have also referred to the extent of da mage caused to the roofs of neighbouring properties (although they have not provided any independent information which confirms this). Given the poor condition of the applicant’s roof and the lack of any contemporaneous information identifying cyclone-related damage, I consider that the issues with the roof which gave rise to ongoing water entry are more likely to have been caused by gradual deterioration, than by the cyclone in February 2015. FSP is not liable for roof replacement For the reasons outlined above, I am satisfied that, on the balance of probabilities, the damage to the applicants’ roof was caused by gradual deterioration. Damage caused in this manner is excluded from cover under the policy. Accordingly, the FSP is not liable for the costs of replacing the roof. Case No: 442275 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 24 October 2016. The recommendation was rejected by the applicants. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). During the course of this dispute, the applicants have been represented by a loss adjuster. For the purposes of this determination, submissions made by the applicants’ representative have been treated as if they had been m ade by the applicants themselves.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.