Home / Financial Firm (Unknown - Insurer) / Determination 442271

Determination 442271

Extent of storm damage and cash settlement amount; handling of repeated inspections

FirmFinancial Firm (Unknown - Insurer)
Decided2017-12-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$350
Amount claimed$41,575
SourceAFCA PDF

Summary

The applicants claimed storm damage to their home and disputed the FSP's narrower scope and cash settlement after several inspections. AFCA ordered repair or cash settlement based on an updated JLG costing with statutory interest, $350 for inconvenience, and reimbursement of their plumber's report.

The storm was the proximate cause of the damage, the FSP did not establish any exclusion, and the JLG scope was more reliable than subsequent assessments.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 442271 Determination Page 1 of 4 Case number: 442271 1 7 November 2017 1 Overview 1.1 Dispute The applicants hold a home insurance policy with the financial services provider (FSP). The applicants lodged a claim with the FSP for damage to their home after a storm in April 2015. The FSP initially accepted there had been storm damage, but did not agree with the applicants on the extent of the storm damage. The applicants wanted the FSP to authorise repairs in accordance with a scope of works prepared in May 2015 by „JLG‟, the first assessor to inspect the property. The FSP was prepared to cash settle the claim based on a lesser scope prepared by „IC‟, the fourth assessor who inspected; but it also wanted to arrange a further inspection, specifically to investigate the possibility of a leaking pipe in the bathroom. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the applicants. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided since then have been considered. Do the further submissions change the outcome? New evidence from the applicants indicates there has been no water leak from the bathroom. There have been at least 5 inspections of the property already. It is over 2 years since the JLG scope of works/costing was prepared in May 2015, so it is reasonable to amend the cash settlement calculation to reflect current repair costs. 1.3 Determination This determination is in favour of the applicants. The FSP must promptly authorise repair work in accordance with the scope of works prepared by JLG (plus additional repair work to which the FSP has agreed), or make a cash settlement based on an updated costing to be obtained from JLG of their scope of works (and the additional agreed repair work). Any cash settlement must also take reasonable account of the issues set out in section 2.2 of this Determination. The FSP is also required to pay $350 compensation for the concern and inconvenience caused to the applicants by its handling of the claim; as well as reimbursing the cost of their plumber‟s report . Case No: 442271 Determination Page 2 of 4 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. I agree with the case manager‟s reasons for the recommendation, and the basis for the recommended outcome. However, given the time that has passed since the original JLG quote for repair works, it is appropriate to reconsider the assessment of any cash settlement. It is also fair to consider an award of compensation for the time taken, and concern and inconvenience experienced by the applicants in the course of the FSP‟s handling of the claim. 2.2 Do the further submissions change the outcome? Cause of the damage was, on balance, storm Over the course of the claim and dispute, the FSP appears to have changed its position regarding the nature and cause of the damage. Having initially acknowledged an insured event had caused damage, after the recommendation it said this was not the case. The FSP made the point that the policy does not cover loss or damage “ caused by wind, rain, hail or snow which entered an ordinarily fully enclosed part of your building through an opening not created by the storm ” . That provision goes on to say that such an “ opening ” includes “ an open window or door; and any opening made for the purpose of any renovation, repair or maintenance work, including where tarpaulins or other fixings have been set up ” . I do not consider that this provision is reasonably intended to exclude cover for situations where storm water entered, for example, through the back of a gutter when the downpipes could not cope with the amount of water flow from the storm (as one of the FSP‟s experts reports) . There is no suggestion in this case that the entry by storm water was other than through an “ ordinarily fully enclosed ” part of the building, and I do not consider it fair or reasonable to rely on the fact that there was no specific storm-created opening to decline the claim. The FSP has also referred to multiple causes of the damage which it said are excluded under the policy, including cracked grouting, poor drainage , and rising damp. Although grouting and drainage issues were identified by the FSP, the reports indicate water entry had not been an ongoing issue or a chronic problem, which Case No: 442271 Determination Page 3 of 4 might be expected in the case of poor maintenance, or defects/structural faults in a house of its age. The applicants‟ pre -purchase building report (prepared only about 15 months before the claim arose) does not identify any such defects or issues: it concludes the overall condition of the building is “ above average ” . While that report does note a damp course proofing material was not visible, that in itself does not establish that was the problem. That uncertainty is reflected in one of the FSP‟s reports, where the possibility of rising damp is mentioned (but not confirmed) specifically in relation to bedroom 2. However, rising damp is not suggested or identified elsewhere, and I consider it unlikely that it would have arisen in isolation if it had been the problem. I have considered all the FSP‟s experts‟ reports, as well as noting the pre -inspection building report provided by the applicants. I am satisfied, on the evidence, that the proximate cause of the damage (that is, the dominant, effective or operative cause) is, on balance, storm water. Applicants ’ plumber conducted pressure test and found no leaks The applicants have provided a report from a plumber who conducted pressure testing for leaks in the property. The report reasonably indicates that there were no leaks which might have impacted on the damage identified in the property. The report also specifically notes that there was no visible sign of water leaking from the first floor bathrooms to the bedroom ceiling below. I am not satisfied on the available evidence that the FSP has shown that any of the identified damage is the result of an exclusion relating to the escape of water inside the house, as it has suggested. I also consider it f air that the FSP pay the cost, if any, of the applicants‟ plumber‟s report (subject to provision of evidence of the expense incurred). Any cash settlement should be based on updated JLG quote The FSP has the option of undertaking the repairs itself, or cash settling the claim. After the recommendation was issued, the applicants submitted a quote dated 4 November 2016 from their builder ( „ RC ‟ ). That appears to broadly cover the same scope of works as identified in the JLG scope and quote, although the estimated cost is considerably higher, at $72,864, as compared to JLG‟s of $41,574. Even allowing for the fact that the RC quote was prepared 18 months later than JLG‟s (and that price increases might be expected to have occurred in that period), I am not persuaded the difference is reasonably justifiable. In the circumstances, I consider it fair and reasonable that JLG provide an updated quote for repairs, based on their original scope of works (which includes work to the main bedroom ceiling). That scope, however, should also include the repairs agreed to by the FSP in its email to the applicants on 9 November 2015: the preparation and painting of the front entrance areas, at a cost, at the time, of $2,481.60. Case No: 442271 Determination Page 4 of 4 The updated JLG quote should be based on the costs that might reasonably be expected to be incurred by the applicants themselves in having the repair work completed by an appropriately qualified builder. That quote should form the basis of any cash settlement. However, the final settlement amount should take proper account of all relevant considerations, including the fact that when a cash settlement is made, the risk associated with the repairs is effectively transferred from the FSP to the applicants . The settlement amount should also include an allowance for contingencies and variations, such as the possibility of other unforeseen circumstances or damage, not visible at the time of inspection, being revealed in the course of repair work . However, it is important to note that the FSP is not responsible for damage which may be discovered and which is not related to the insured event and the damage arising from it. (The applicants should also be aware that, in order for the claim- related damage to be properly repaired, they may need to attend to other no n-claim- related issues or damage to the property, at their own cost.) The cash settlement must also address associated benefits to which the applicants may be entitled under the policy, such as temporary accommodation. I note the applicants have suggested consideration be given to including repair of cracks around the windows and balconies. However, the evidence does not establish that damage was caused by the storm, and so those repairs are not the responsibility of the FSP in this claim. Compensation for non-financial loss Under 9.3 of our Terms of Reference (TOR), FOS may award compensation for non- financial loss in situations where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with an applicant‟s expectation of enjoyment or peace of mind. The applicants are unhappy about the way the FSP has handled the claim. They say there have been i nconsistent messages given about what was being done, and the reasons for the FSP‟s actions ; and they feel there are inaccuracies in its reports, including as to what the applicants themselves are reported to have said. I accept that this will have caused them upset and concern, over and above what might be expected in the normal course of dealing with an insurance claim. I am also satisfied that the series of inspections, over a protracted period, has caused them avoidable inconvenience and uncertainty, in terms of how efficiently and appropriately the claim and damage was being assessed, and what their reasonable expectations might have been. Under the particular circumstances, I consider it fair that the FSP pays $350 compensation. Recommendation Case No: 442271 Recommendation Page 1 of 11 Case number: 442271 28 November 2016 3 Overview 3.1 Dispute The applicants hold a home insurance policy with the financial services provider (FSP). The policy includes accidental damage cover. The applicants lodged a claim with the FSP for damage to their home following a storm in April 2015. The FSP accepts that the applicants‟ property incurred storm damage, but the FSP and the applicants do not agree on the extent of the damage. The applicants want the FSP to authorise repairs in accordance with a scope of works prepared by „JLG‟, the first assessor to inspect the property. The FSP wants to cash settle the claim in accordance with a scope of works prepared by „IC‟, the fourth assessor to inspect the property. The FSP also wants to arrange further inspections, as it suspects that some of the damage to the applicants‟ property may be caused by a leaking pipe in the vicinity of the shower. 3.2 Issues and key findings Have the applicants established an entitlement to cover? The policy provides cover for storm damage. The applicants‟ property has incurred storm damage. Therefore, the applicants have established a prima facie claim. Are the applicants required to allow further inspections? The applicants‟ property has been insp ected at least six times by five different assessors, all instructed by the FSP. In the circumstances, it would be unreasonable to require the applicants to make their property available for further inspections. What is the extent of the damage to the appl icants’ property ? The damage to the applicants‟ property includes the damage described in the JLG report of 19 May 2015. There may be additional unseen damage. Can the FSP deny the claim on the basis of a policy exclusion? The evidence provided does not establish any fact that would entitle the FSP to deny the claim, or part of the claim, on the basis of a policy exclusion. What must the FSP do to fulfil its obligations under the policy? The FSP must settle the claim by authorising repair work in accordance with the scope of works prepared by JLG, or by paying the applicants a cash settlement based on JLG‟s costing of their scope of works. Case No: 442271 Recommendation Page 2 of 11 3.3 Recommendation This recommendation is in favour of the applicants. The FSP must authorise repair work in accordance with the scope of works prepared by JLG, or pay the applicants a cash settlement based on JLG‟s costing of their scope of works. Case No: 442271 Recommendation Page 3 of 11 4 Reasons for recommendation 4.1 Have the applicants established an entitlement to cover? Onus on applicants to establish entitlement to claim The applicants have the onus of establishing a prima facie claim (see section 3.2 of this recommendation). This means that the applicants must establish, on the balance of probabilities, that their property was damaged by an event for which the policy provides cover. Only after this onus is discharged is the FSP required to show why it should not cover the cost of repairing the damage. Applicants have established a prima facie claim The product disclosure statement (PDS) says that the policy provides cover for damage caused by “escape of liquid” and “storm”, plus the option to obtain cover for accidental damage (for details, see section 3.3 of this recommendation). The FSP has provided a copy of the applicants‟ Certificate of Insurance for the per iod of 14 March 2015 to 14 March 2016, which includes the time of the storm. The Certificate states that the policy includes optional cover for accidental damage. The FSP‟s assessors‟ reports establish that applicants‟ property incurred storm damage. Therefore, the applicants have a prima facie claim. 4.2 Are the applicants required to allow further inspections? Applicants’ property inspected by five FSP assessors The applicants‟ property has been inspected at least six times, by five different assessors, all instructed by the FSP. Inspection by JLG (builders) The FSP has provided a report dated 19 May 2015 from „JLG‟, builders. JLG attended the applicant‟s property on 18 May 2015 “ to ascertain the damages sustained to the property for the claimed storm ”. JLG o bserved the following damage: ENTRY/HALLWAY - Entry doors affected, wall paint stained and flaking above doors and 2lm of skirting water affected. MAIN BED - All parquetry flooring and skirting affected. water stain to ceiling. MAIN BED ROBE - All parquetry flooring and skirting affected. UPSTAIRS HALLWAY AND OPEN PLAN SITTING ROOM - All parquetry flooring and skirting affected. BEDROOM 2 - 4lm skirting affected. JLG‟s report states as follows: High moisture reading were found throughout the second storey parquetry flooring areas highlighted in the resultant damages. Case No: 442271 Recommendation Page 4 of 11 Please be advised that the water stain to the ceiling of the main bedroom was unable to be determined as access to the second storey roof was unable to be gained. JLG prepared a scope of works for the repair of the abovementioned damage, which they costed at $41,574.86. Inspection by CM (roofing specialists) The FSP has provided a report from „CM‟, roofing specialists, who attended the applicants‟ property on 18 May 2015. JLG‟s report stated that they could not inspect the water stain to the main bedroom because they could not access the roof. CM inspected the water stain and confirmed that it was storm-related damage. The water stain appears to be accounted for in JLG‟s scope of works, which incl udes the following item under the heading “Main bedroom”: “ Prepare seal and paint … all walls and ceiling …” Inspection by GC (FSP internal assessor) The FSP has provided a report from „GC‟, FSP internal assessor, who attended the applicants‟ property on 22 July 2015. GC‟s report includes a scope of works which allows for work to the main bedroom and the front entry and says “ My Buildings Estimate = $19022.00 ”. Of the other areas listed as damaged in the JLG report, GC‟s report says: “[they] are parquetry flo oring but I couldn‟t see resultant damage to these areas”. The report says “ there may be areas of unsighted damage ”. Inspections by IC (building consultants) The FSP has provided a report from „IC‟, building consultants, who attended the applicants‟ property on 24 July 2015. IC‟s report of 29 July 2015 includes a scope of works which allows only for work to the main bedroom. The FSP has provided a repair quote from „SHG‟, totalling $28,019.60, based on this scope of works. After the applicants noted that IC‟s report did not mention any damage outside the main bedroom, IC reattended the applicants‟ property on 14 September 2015. IC‟s second report, dated 14 September 2015, states:  There was no visible damage to the flooring outside the main bedroom.  The bedroom next to the main bedroom “has possibly sustained moisture damage” , but IC cannot be sure because furniture in the room prevented a more thorough inspection.  IC measured the floor level throughout the upper floor and fou nd “ slight variances in level [which] are not suggestive of water tracking any considerable distance beneath the parquetry”.  There are elevated moisture readings in the vicinity of the shower. There is “ no visible damage” in this area, other than “ some swelling to the MDF architrave ”.  Except for the area near the shower, the flooring outside the main bedroom “ does not currently have any elevated moisture reading, and nor is there any cupping or disturbance of note”. Case No: 442271 Recommendation Page 5 of 11 Inspection by SBC (building consultants) The parties discussed the matter with a FOS conciliator. During the conciliation, the applicants agreed to make their home available for another inspection. This inspection was to focus on whether there was a leak near the shower, and whether this had caused any damage. The applicants subsequently told me that the IC assessor misrepresented what he saw and what the applicants told him. The applicants said that they wanted the inspection done by a different IC employee, or someone from a different company. I advised the FSP of this, and the FSP engaged a different building consultant company, „SBC‟. SBC attended the applicants‟ property on 20 October 2016. SBC‟s report of 11 November 2016 says that there are high moisture levels near the shower and “ these elevated readings diminished as I moved away from the main bathroom ”. The report concludes as follows: I am of the opinion that the elevated moisture reading recorded [near the shower] is not related to the damage sustained in the main bedroom. It would be my considered opinion that the cause of the elevated moisture levels… is due to a failure of the plumbing system within the wall cavity of the bathroom. However this could not be confirmed due to the non-undertaking of a Plumbing Test / Report. In my opinion, the swelling to the MDF timber skirting and bubbling to the paintwork of the southern masonry wall of bedroom 2 is a result of rising damp due to excessive moisture within the cavity and or a failure of the plumbing system within the wall cavity of the bathroom. However this could not be confirmed due to the non-undertaking of a Plumbing Test / Report. FSP wants to arrange further inspections SBC‟s report says that the FSP wants to arrange further inspections: “ Plumber to be engaged to carry out „thorough‟ leak detection tests…” Such tests would be in addition to the test already performed by SBC: “ I completed a water holding membrane test of the shower hob area and I did not observe any escape of liquid nor did the water level change within the tested area. ” The proposed attendance by a plumber would be the seventh attendance by an assessor at the applicants‟ property to assess this claim. SBC‟s report says: “ If leaks are identified then the plumber/[SBC] is to determine if the leak is the cause of increased moisture to the hallway …” This may require an eighth attendance. Applicants refuse to give permission for further inspections SBC‟s report says that the applicants “ did not give permission for a Plumbing Test to be undertaken when contacted". The applicants say that SBC told them that they (SBC) would perform a leak detection test, and if a leak was detected, a “more involved” test would be performed to determine the cause of the leak. The applicants say that SBC performed the test, and did not detect a leak, but the FSP wants to arrange further leak detection tests Case No: 442271 Recommendation Page 6 of 11 anyway. The applicants say that the FSP just wants to “keep doing tests until they get one they like”. Not reasonable to require applicants to allow further inspections The appli cants‟ property has been inspected at least six times, by five different assessors, all instructed by the FSP. The FSP is proposing a seventh inspection to investigate whether there are any leaks near the shower, and possibly an eight inspection to assess the effect of any leaks detected. These are the issues that were supposed to have been resolved by the sixth inspection, which the applicants agreed to at conciliation. In the circumstances, I consider that it would be unreasonable to require the applicant s to make their home available for further inspections by the FSP‟s assessors. 4.3 What is the extent of the damage to the applicants’ property ? JLG report more persuasive than subsequent reports Of the experts engaged by the FSP to assess the applicants‟ property, JLG was the first to attend, and was in the best position to assess the damage. CG and IC both say that there was no visible damage to the flooring outside the main bedroom, but neither performed a sufficiently comprehensive inspection to determi ne whether there was any non-visible damage. Neither CG nor IC claim that a lack of visible damage is sufficient to establish a lack of damage: CG says “ there may be areas of unsighted damage ”, and IC says that the bedroom next to the main bedroom “has possibly sustained moisture damage” . JLG says that the flooring outside the main bedroom was damaged. No subsequent assessment establishes that this flooring wasn‟t damaged. Therefore, I accept JLG‟s view on this point. The FSP‟s letter to the applicants dated 15 January 2016 says: “[JLG] recorded increased moisture to areas outside of the main bedroom, though I note the moisture readings to these areas have now returned to normal. ” The FSP argues that areas with normal moisture readings are free from water damage. I do not accept this argument. If building material is damaged by excessive moisture, it cannot be assumed that the damage will be fully repaired when the material dries out. The effect of soaking and subsequent drying will depend on the material. The FSP has provided no expert evidence to support its claim that parts of the applicants‟ property showing normal moisture readings can be assumed to be undamaged. Damage is at least to the extent described in the JLG report Given the above information, I am satisfied, on the balance of probabilities, that the damage to the applicants‟ property is at least as extensive as described in the JLG report. Case No: 442271 Recommendation Page 7 of 11 Given the nature of the damage (stormwater penetrating the walls and floor), there is a possibility of addi tional unseen damage. None of the assessors‟ reports are sufficiently comprehensive to rule out the possibility of additional unseen damage. 4.4 Can the FSP deny the claim on the basis of a policy exclusion? FSP does not seek to rely on exclusion for defects Page 75 of the PDS contains the following general exclusion: Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; The FSP says that the applicants‟ property had drainage defects which allowed water to enter the property. However, the FSP said that they would not seek to apply this exclusion to the applicants‟ claim because “ the defects which allowed the water to enter may not have been known to [the applicants]. As such, [the FSP has] provided [the applicants] with the benefit of doubt in this instance ”. Policy excludes damage caused by gradual damage The FSP says that some of the damage to the app licants‟ property may be caused by water that is slowly leaking from a pipe or pipes near the shower. Damage caused by a leaking pipe would, prima facie , be covered under the policy, as either an “escape of liquid” or “accidental damage”. However, page 77 of the PDS contains the following general exclusion: We will also not cover: 35. gradual loss or damage of any kind ; If water leaked slowly over a long period of time, and caused damage gradually, that damage could be excluded under the above provision. The FSP has the burden of establishing that it is entitled to apply an exclusion to deny the claim, or part of the claim (see section 3.2 of this recommendation). Evidence does not establish the existence of a leak IC found elevated moisture readings near the sh ower. IC‟s second report says: “This appears to be related to a waterproofing issue, possibly at the waterstop angle, but this would require further investigation to identify the exact source.” SBC also found elevated moisture readings near the shower, and believes that this is due to “ failure of the plumbing system within the wall cavity of the bathroom ”. However, SBC‟s report says that this cannot be confirmed without further investigation by a plumber (and SBC‟s own test on the shower did not detect a le ak). The evidence provided does not establish the existence of a leak, nor does it establish that the damage to the applicant‟s property, or any part of that damage, is caused by a leak causing “gradual loss or damage”. Therefore, the FSP is not entitled to apply the exclusion to deny the claim, or part of the claim. Case No: 442271 Recommendation Page 8 of 11 Other evidence of gradual damage The JLG report states “mould had been treated for under the flooring and it is [JLG‟s] opinion that this damage has been occurring over an extended period of time”. The applicants say they did not apply any anti-mould treatment before or after the storm. The applicants say that JLG applied an anti-mould treatment during makesafe works (this is confirmed by JLG‟s makesafe invoice, which includes “Applied microban treat ment”). If part of the damage to the applicants‟ property was attributable to mould, it could be considered “gradual loss or damage”, which could be excluded from cover. No evidence has been provided to establish whether any of the damage to the applicants ‟ property was caused or exacerbated by a pre -existing mould infestation or mould treatment. 4.5 What must the FSP do to fulfil its obligations under the policy? PDS says FSP can repair property or pay cash settlement Page 82 of the PDS sets out how the FSP can settle a building claim. In part, it states: If we agree to pay your claim, we will decide whether to:  repair or rebuild the lost or damaged part of your building ; …  pay you the amount we determine to be the reasonable cost of repairing or rebuilding the lost or damaged part of your building up to the sum insured stated on your Certificate of Insurance . Under the terms of the PDS, the FSP may settle the claim by engaging contractors to perform repairs in accordance with the scope of works prepared by JLG, or by paying the applicants a cash settlement based on JLG‟s costing of their scope of works , which is $41,574.86. Calculation of cash settlement If the claim is cash settled, section 57 of the Insurance Contracts Act 1984 (Cth) provides that the FSP must pay interest from the time when it was unreasonable for the FSP to have withheld payment. In the circumstances, I consider this time to be 19 June 2015, one month after the date of the JLG report. Therefore, if the FSP chooses to cash settle the claim, the sum of the settlement should be $41,574.86, plus interest at a rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period from 19 June 2015 to the payment date. Discovery of additional damage If the FSP choose s to settle the claim by repairing the applicants‟ property, and additional damage is discovered during the course of repairs, the FSP must assess the damage to determine whether it is covered under the policy. Case No: 442271 Recommendation Page 9 of 11 If the FSP chooses to cash settle the claim, and additional damage is subsequently discovered, the applicants may advise the FSP of the damage. The FSP must then assess the damage to determine whether it is covered under the policy. Case No: 442271 Recommendation Page 10 of 11 5 Supporting information 5.1 FOS approach to this dispute A full exchange of the relevant information has taken place between the parties and each party has had the opportunity of addressing any issue raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions. For the purpose of this determination, commentary is restricted to only those issues considered relevant. 5.2 Relevant law Prima facie claim It is well established in common law that there is an onus on an insured to establish a prima facie claim. This means that the insured must establish, on the balance of probabilities, that they have suffered a loss caused by an event for which their insurance policy provides cover. Should this onus be discharged, the insurer then has the onus of establishing, on the balance of probabilities, the application of any exclusion on which it relies to deny the claim. 5.3 Relevant policy terms Escape of liquid page 41 What is covered Your building and/or contents are covered for loss or damage caused by the sudden and unexpected escape of liquid from any: …  fixed water pipe (but not a garden hose); … What is not covered You are not covered under this Insured Event for:  …  loss or damage resulting from a leaking or faulty shower recess or shower base;  loss or damage caus ed by any gradual escape of liquid;  … Storm page 51 What is covered Your building and/or contents are covered for loss or damage caused by storm . Case No: 442271 Recommendation Page 11 of 11 Accidental damage page 69 What is covered You are covered for loss or damage to your building and/or contents caused by an accident at your insured address . If the cause of the loss or damage falls under an Insured Event in the policy, the loss or damage will be assessed under that Insured Event. General Exclusions page s 75 – 78 (page 75) Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; … (page 7 7 ) We will also not cover: … 35. gradual loss or damage of any kind; … How we settle a claim page s 82 – 84 Building claims (page 82) If we agree to pay your claim, we will decide whether to:  repair or rebuild the lost or damaged part of your building ; …  pay you the amount we det ermine to be the reasonable cost of repairing or rebuilding the lost or damaged part of your building up to the sum insured stated on your Certifi cate of Insurance .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.