Home / Financial Firm (Unknown - Insurer) / Determination 441753
Determination 441753
Storm and burst water main damage claim denied for pre-existing damage
Summary
The applicant claimed storm and burst water main damage to her home, which the FSP denied as pre-existing and not caused by an insured event. AFCA found an insured event caused the loss and ordered a cash settlement of $18,400 plus Insurance Contracts Act interest.
The applicant established a prima facie storm and escape of liquid claim, and the FSP did not establish that an exclusion applied to the flood damage.
Issues
- Claim denial primary · upheld
“I am satisfied the applicant has established a claim under the terms of the policy and that the FSP is liable to meet the loss suffered.”
- Claim amount dispute secondary · not upheld
“The claim for increasing the existing water drainage and additional plumbing costs are not items of damage under the terms of the policy.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 441753 Determination Page 1 of 5
Case number: 441753 27 June 2017
1 Overview
1.1 Dispute
On 1 March 2016 the applicant lodged a claim with the financial services provider
(FSP), for damage following the flooding of her property during a storm on
31 January 2016 and on 7 February 2016 after an outside water main had burst.
The FSP denied the applicant’s claim on the grounds the damage sustained was not
a direct result of an insured event and that the applicant had repaired the property
prior to allowing the FSP the opportunity to inspect any damage.
The applicant rejects the FSP’s position and maintains she was not aware of any pre -
existing damage prior to lodgement of the claim.
1.2 Issues and key findings
Has the applicant established a prima facie claim?
I am satisfied the applicant has established a prima facie claim under the terms of the
policy for damage caused by storm and the escape of liquid.
Has the FSP established the application of an exclusion?
I am not satisfied the FSP has established the application of an exclusion. I am
satisfied that damage resulting from ground movement was due to heave and not
subsidence. Insofar as the damage may have been due to a defect, structural fault or
design fault, I am satisfied that the applicant was not aware of such fault and could
not reasonably have been aware of such fault.
Has the FSP been prejudiced in its ability to assess the applicant’s claim?
I am satisfied that the information p rovided by the applicant’s repairer EL is sufficient
for the FSP to make an assessment as to the extent of damage and cost of repairs
and it has not been prejudiced.
1.3 Determination
This determination is in favour of the applicant.
The FSP is to cash settle the applicant’s claim in accordance with the terms of the
policy for the sum of $19,400 less the applicable excess of $1,000 as per the
quotations provided by EL.
The FSP is to pay interest on the cash settlement in accordance with Section 57 of
the Insurance Contracts Act 1984 (the Act) from 30 May 2016 to date of payment of
the claim.
Case No: 441753 Determination Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Has the applicant established a prima facie claim?
The applicant has the onus to establish on the balance of probabilities a claim that
falls within the terms of the policy. This is commonly called a prima facie claim. Only
once an applicant has established a prima facie claim does the onus shift to the FSP
to establish the application of any exclusion.
The applicant’s policy is an insured events policy covering her home and contents for
a number of events specified under the terms of the policy. Cover is provided for loss
or damage to a building caused by a storm and loss or damage as a result of escape
of liquid from amongst other things a water main, fire hydrant or water supply pipe,
again subject to a number of exclusions.
The onus is therefore on the applicant to establish a claim for loss or damage arising
from storm as defined in the policy and/or loss or damage arising from the escape of
liquid as defined in the policy.
The applicant has established a prima facie claim
Based on the available information, I am satisfied that the applicant has established a
prima facie claim for loss or damage sustained to the property as a result of an
insured event of storm on 31 January 2016 and the subsequent insured event of
escape of liquid on 7 February 2016.
It is not disputed that substructure of the applicant’s property was inundated by water
on or about 31 January 2016 during a storm event and on 7 February 2016 when a
water main burst. In report dated 8 February 2016, EL confirmed that water had been
accessing the substructure of the property over time and considered most likely this
was from the street.
EL had been contracted by the applicant to investigate the source of water damage
and subsequent smell at the property and had been in attendance at the property on
or about 31 January 2016.
The FSP had the property inspected by AI on 8 March 2016. AI noted that water had
flooded from B Road to the applicant’s property during heavy rains and had
subsequently flooded the property following a burst water main. AI confirmed that the
subfloor inspected through flooring which had been lifted by EL was damp and moist
and there was a musty smell present.
Case No: 441753 Determination Page 3 of 5
An engineer MCS inspected the property on 21 March 2016. MCS observed that
stormwater runoff had been entering the subfloor of the applicant’s property due to
absence of adequate stormwater drainage and also the flooding events of January
and February 2016 have exacerbated any pre-existing damage to the subfloor.
I am satisfied the information considered as a whole establishes a prima facie claim
within the terms of the policy.
2.2 Has the FSP established the application of an exclusion?
The FSP claims that as there was damage evident prior to the events in January and
February 2016 and that the stormwater had been entering the subfloor area over
time. The FSP maintains the damage was not a direct result of an insured event.
Proximate cause of the loss
In order to determine the dispute it is necessary to determine the proximate cause of
the loss. It is well established that the proximate cause of a loss or damage is the
dominant or effective or operative cause of the loss whether or not that be the last in
time or the sole cause. Where there are a number of causes operating
contemporaneously, each must be examined for qualities of reality, predominance
and efficiency as the active efficient cause that sets the relevant chain of events in
action.
The applicant had noticed a mould smell coming from the floor over a period of up to
12 months prior to the loss. She had contracted EL to investigate the cause of this.
There is no information to establish that other than some dampness caused partially
as a result of the lack of ventilation that this had caused any other damage. There is
no information that the dampness had caused movement to the property.
The FSP’s engineer admits that he is unable to determine the extent to which
damage occurred as a result of the pre-existing condition of the property as against
the flooding.
There is reference to heaving and shrinkage at the property consistent with the
significant inundation of the subfloor during the insured events in January and
February 2016. I am satisfied a proximate cause of the damage claim was the
insured events of January and February 2016.
Exclusion of ground movement does not apply
The FSP has referred to the general exclusion contained in the policy relating to
ground movement.
In my view the damage to the property was not caused by ground movement as such
but was caused as a result of the inundation of the soil causing movement of the
stumps. The damage was most likely caused as a result of heave following the
inundation of the property.
Case No: 441753 Determination Page 4 of 5
Wear, tear and gradual deterioration does not apply
The FSP has also referred to the exclusion of wear, tear and gradual deterioration. I
am not satisfied the information exchanged has established that there was wear, tear
or gradual deterioration as contemplated under the terms of the policy.
Whilst I accept that was pre-existing dampness, in my view that was most likely due
to a design fault affecting the ventilation under the property.
The exclusion relating to structural or design fault or defects applies in circumstances
where loss or damage arises from a defect, struc tural fault or design fault that you
knew about or should reasonably have known about and did not fix before the loss or
damage occurred.
There is no information to suggest that the applicant knew about any structural or
design fault. The applicant had contracted EL after noticing the mouldy smell, but
there is otherwise no evidence that the applicant was aware that the soil had become
saturated or what was causing the mouldy smell.
2.3 Has the FSP been prejudiced?
The FSP maintains it has been prejudiced in a ssessing the applicant’s claim as the
damaged area of the property had been repaired before the FSP had the opportunity
to inspect the damage and determine the cause.
AI who examined the property for the FSP on 8 March 2016 noted a number of
repairs had already been completed. The engineer MCS whilst finding that there was
both pre-existing damage and damage caused by the flooding considered he could
not determine the extent of such further damage due to the repairs having been
prematurely completed.
EL however has provided a number of comments to the FSP with respect to the
rectification works conducted. On 8 February 2016 he set out a summary of what he
believed the damage analysis found after his inspection. He confirmed on 28 April
2016 that he believed his previous report and quotations supplied outlined the
damage and repairs due to the two flooding events.
Whilst I acknowledge that the completion of some of the works has caused some
problems for the FSP in assessing the extent of damage, no evidence has been
provided to suggest that the damage identified by EL and referred to in the reports of
8 February 2016 and 28 April 2016 is not reasonably consistent with damage
occurring in the flooding events.
Whilst I accept that the FSP is not liable for the additional costs of plumbing or for
improvement of the water drainage channels around the property, in my view, the
extent of prejudice suffered by the FSP would not justify the FSP denying the
applicant’s claim.
In the circumstances, I am satisfied that the applicant has established a claim under
the terms of the policy and that the FSP is liable to meet the loss suffered.
Case No: 441753 Determination Page 5 of 5
FSP to settle the claim based on quotes from EL
EL has provided a quote dated 9 February 2016 for the cost of repairs of $13,600
excluding painting, patching and repairs to walls, ceiling and roof.
On 28 April 2016, EL provided an additional quote for cost of repainting four
bedrooms and hallway ($4,000), replacement of the damaged skirting boards ($980),
replacement of the western wall plaster ($1,800), increasing the existing water
drainage channels ($700) and additional plumbing costs.
I am satisfied the FSP is only liable to meet the costs of repainting the four rooms
and hallways and replacement of the western wall plaster. The replacement of
damaged skirting boards is covered in the first quote whilst the claim for increasing
the existing water drainage and additional plumbing costs are not items of damage
under the terms of the policy.
Based on EL’s quotation, I calculate the loss as follows:
Quote 9/12/2016 $13,600
Quote 28/04/2016 $ 4,000
Quote 28/04/2016 $ 1,800
Total $19,400
Less Excess $ 1,000
Total $18,400
The FSP is to pay the applicant $18,400 plus interest pursuant to Section 57 of the
Act from 30 May 2016 to date of payment of the claim.