Home / Financial Firm (Unknown - Insurer) / Determination 441650
Determination 441650
Claim declined for cracking damage caused by tree roots
Summary
The applicant's building claim for cracking damage was declined after the FSP withdrew a $7,035 settlement offer. AFCA found tree root damage excluded and the settlement not concluded, but ordered $1,000 for delay, return of the $500 excess and statutory interest.
Once the insured shows a covered loss, the insurer must prove an exclusion applies, and damage caused by tree roots to pipes is excluded from cover.
Issues
- Claim denial primary · not upheld“The material establishes the damage was caused by tree roots. As tree root damage is excluded from cover, the FSP is entitled to deny the claim.”
- Poor claim handling secondary · not upheld“The applicant rejected the settlement offer on 16 December 2015, so the FSP is not liable to pay the claim for this reason.”
- Delay secondary · upheld“A claim was made on 10 April 2015 and yet a final decision was not made until around a year later.”
Subjects and remedies
home or building damagepay interestpay non financial lossrefund fees or charges
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 441650 Determination Page 1 of 9
Case number: 441650 10 May 2017
1 Overview
1.1 Dispute
The applicant says the escape of liquid caused damage to his property. He lodged a
claim with the Financial Services Provider (FSP).
The FSP declined the claim. It says it can establish and rely on policy exclusions to
decline the claim.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP.
The FSP accepted the recommendation but it was not accepted by the applicant. In
the circumstances, the dispute has been referred to me for determination.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim as the material provided establishes on the
balance of probabilities the damage to the insured property was caused by tree roots.
As tree root damage is excluded from cover, the FSP is entitled to deny the claim.
Is the claim to be paid because the claim was settled?
The material provided does not establish on the balance of probabilities the claim
was settled and so the FSP is not obliged to pay the claim for this reason.
Is the applicant entitled to compensation?
The FSP is to pay the applicant $1,000 as the material establishes there has been an
unusual amount of time taken to resolve the situation and interference with the
applicant’s expectation of enjoyment or peace of mind.
1.3 Determination
This determination is substantially in favour of the FSP.
Should the applicant accept this determination, then within seven days of
acceptance, the FSP is to pay to the applicant $1,000 compensation.
If the FSP has not refunded the policy excess, then the FSP is to refund $500 to the
applicant and pay statutory interest on $500 from 26 April 2016 until settlement.
Case No: 441650 Determination Page 2 of 9
Otherwise, the FSP is not required to take any further action in relation to the claim or
the dispute.
Case No: 441650 Determination Page 3 of 9
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
FSP provided claim file notes after recommendation
After the recommendation was rejected, the applicant made further submissions
including citation of legal cases. He requested notes, tapes, transcripts of
conversations between himself and the FSP. He provided no new material but
essentially reiterated his position. He says the case was settled and recited a series
of events. He says the settlement should stand and the work should be completed.
The FSP reviewed the applicant’s further submission. It mai ntained its previous
position on the claim. In response to the applicant’s request it provided screen shot
copies of all telephone conversations and a USB stick drive containing most media
files of the calls.
The applicant made no further submissions afte r provision of the material from the
FSP.
2.1 Is the FSP entitled to deny the claim?
The applicant must establish damage caused by escape of liquid
The applicant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
While the FSP’s policy provides cover for accidental damage to the buildings, if
damage is caused by any other insured event, then the FSP’s policy clearly states
the applicant must claim under that section of the policy.
The FSP’s policy also covers the building against damage caused by a number of
events if they occur during the period of insurance.
One of the events is escape of liquid. The applicant is covered if damage is caused
by the accidental escape of liquid from any fixed pipe.
FSP must establish damage caused by a cause which is excluded from cover
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the loss.
In this dispute, relying on reports from a builder, an engineer and material from the
applicant’s plumber, the FSP says it is not obliged to pay the claim as the policy
excludes cover for any damage which is caused by or arises from defects in design
or construction, wear and tear, earth or soil movement, and damage caused by tree
roots.
Case No: 441650 Determination Page 4 of 9
The FSP’s submits its expert reports establish the cracking damage to the insured
property was not solely the result of escape of liquid as claimed but rather as a result
of inadequate site drainage, localised earth movement and tree roots. It says as
these causes are excluded under the policy it is entitled to deny the claim.
It relies on a legal principle which it says entitles it to deny the claim if loss has two or
more concurrent causes one of which is excluded from cover.
The FSP points out the applicant has not provided any expert evidence upon which
to base his opinions whereas the FSP has relied upon reports and opinions from a
qualified building consultant and engineer.
The applicant has not provided any expert opinion. He criticises the thoroughness of
the reports. He says the tree roots do not contact the wall. He says the drainage on
the property is such that water drains to the re ar of the property and the neighbour’s
property does not drain into his property.
Material establishes damage caused by tree roots
I have carefully considered the material provided by the parties together with all
photographs. It is not in dispute there is cracking damage to the applicant’s property.
The material provided establishes that near to the cracking damage were storm
water and sewerage pipes running under the external pavement.
It is not in dispute these pipes were blocked and cracked. The applicant cleared the
pipe blockages. The FSP’s builder reviewed photographs provided by the applicant
taken by the applicant’s plumber’s CCTV inside the stormwater pipe. It was noted
tree roots were growing inside the stormwater pipe.
Both experts note tree roots were visible perpendicular to the side boundary adjacent
to the surface drain extending to the wall. Photographs show large trees growing in
the neighbour’s garden next to the dividing fence and near to the cracking damage.
Having considered the material I am satisfied it establishes on the balance of
probabilities the tree roots caused the pipes to crack which in turn caused an escape
of liquid. The soil in this area became saturated and the house settled causing the
cracking damage to the house. The algae and moss built up on the southern side
external wall indicates the moisture saturation was long-term.
Having considered the material I am satisfied the effective or dominant cause of the
cracking damage to the insured property was tree roots from th e neighbour’s
property. It is irrelevant whether the tree reached the wall of the insured property or
not. The relevant damage by the tree roots was done to the pipes.
As damage caused by tree roots is excluded from cover, the FSP is entitled to deny
the claim.
Case No: 441650 Determination Page 5 of 9
2.2 Is the claim to be paid as the claim was settled?
Material does not establish the claim was settled
The applicant also says his claim should be paid as the claim was settled and the
FSP cannot retract the settlement offer. In the circumstances, he says he expects the
FSP to fix the damaged wall and foundations.
He says he was asked to pay a policy excess which he did. He says the payment of
the excess settled the claim. He said work commenced on the wall by a bricklayer
from the FSP’s builder on 6 June 2015.
The FSP says although a settlement offer was made by its claims department, the
offer was incorrect and was rejected by the applicant. It says the offer was formally
revoked when the matter was reviewed through its internal dispute resolution
procedure.
I have considered the material provided by the parties. The material shows the FSP
appointed builders to carry out repairs and the works would be completed once the
excess was paid. The excess was paid.
The material indicates although a bricklayer attended the property it does not
establish the bricklayer did any work. Rather, as he was concerned about the impact
work would have on the foundations, he asked for an engineer to advise.
On 30 November 2015, the FSP reviewed material from its builder, the engineer and
the applicant’s plumber and decided it would partially accept the claim and cover the
resultant damage from the cracked stormwater pipe only. Having obtained further
material from the builder about the damage caused and the cost of those repairs, by
letter dated 5 December 2015, the FSP sent a cheque to the applicant in the sum of
$7,035.
The FSP’s file notes show on 16 December 2015 the FSP and the applicant spoke. It
is not in dispute in that conversation the applicant disputed the settlement amount
and requested the cheque be cancelled.
The FSP reviewed the dispute and on 26 April 2016 decided was not liable to pay the
claim at all.
Having considered the material provided, I am satisfied although an offer was made
by the FSP, and pursuant to the offer, the applicant paid the policy excess, the
applicant rejected the offer on 16 December 2015 when he disputed the settlement
amount and requested the FSP cancel the cheque.
In any event, even if it was established the offer was not rejected, the FSP is not
estopped from withdrawing the offer on 26 April 2016. This is because the
information provided does not show the applicant acted on the FSP’s incorrect
acceptance of the claim, or that he suffered any detriment during this time.
The material provided does not show the FSP’s bricklayer worked on the property in
June 2015. Rather, the material provided shows the bricklayer was concerned to wait
to obtain advice from an engineer about the property’s foundation.
Case No: 441650 Determination Page 6 of 9
On the information provided, I am satisfied the claim was not settled but the applicant
rejected the settlement offer. In the circumstances, the FSP is not liable to pay the
claim for this reason.
After the recommendation, the applicant cited a number of legal cases in support of
his position. However, he did not make formal submissions on the legal cases and
their application to the claim or the dispute.
FOS’s Terms of Reference sets out the dispute resolution criteria. FOS will make its
decision having regard to what is fair in all the circumstances taking into account
each of the following: legal principles, good industry practice, codes of practice and
previous FOS decisions.
In making the determination in this case, I have taken into account the legal
principles which govern offer and acceptance. In the circumstances of this matter,
and on the material provided, I am satisfied the FSP’s offer was rejected by the
applicant.
$500 excess and interest to be returned to the applicant
On 1 June 2015, the applicant paid $500 excess to the FSP. If the excess has not
been returned to the applicant, then the FSP must return $500 to the applicant
immediately. In addition, as the FSP should have returned the excess at the time of
its IDR decision, it is to pay statutory interest on $500 from 26 April 2016 to the date
of settlement.
2.3 Is the applicant entitled to compensation
Fair in all the circumstances $1,000 compensation is paid
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant’s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
In the circumstances of this dispute, I consider the FSP’s conduct has interfered with
the applicant’s expectation of enjoyment or peace of mind. The material establishes
an unusual amount of time was taken to resolve the situation. A claim was made on
10 April 2015 and yet a final decision was not made until around a year later. Further,
the material from the FSP’s builder and from the applicant’s plumber was readily
available to the FSP to make the correct claims decision earlier than April 2016.
I am also satisfied it is fair in all the circumstances the FSP pay to the applicant
$1,000 compensation.
Case No: 441650 Determination Page 7 of 9
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material i nformation relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated
24 June 2016. Both the policy document and the Notice have been exchanged with
the applicant.
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause
of the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.4 Key records
Record Key points
FSP’s builder (MK)
Report
22.04.2015
Builder inspected and photographed property with applicant on 14
April 2015.
Applicant advised expert he noticed signific ant cracking to the
external rendered brick wall to the sout hern elevation.
Applicant’s preferred plumbing cont ractor found blocked and
Case No: 441650 Determination Page 8 of 9
cracked stormwater and sewerage pipes. These pipes run parallel
to the dwel ling under the external pavement.
As a result of these blockages the soil has become saturated and
the house has slightly settled causing the sout hern wall to rotate
and crack at the window of the lounge room.
Applicant had all the blockages to the pipes cleared.
Builder described scope of works and appoint ed a builder to carry
out scope as applicant did not have preferred builder.
FSP’s engineer (RE)
Report
14.07.2015
Engineer ins pected and photographed the property 14 July 2015
Engineer made site obs ervations including cracking
Tree roots were visible perpendicular to the side boundary
adjacent to the surface drain extending to the external brick veneer
wall where the cracks are formed
Identified the tree roots from neighbour’s trees.
Noted decorative landscaping pebbles which extend through the
boundary fence adjoining the ins ured property adjacent to the
crack, and algae and moss built up along the southern side
external wall.
Combination of rain wat er percolating through the neighbour's
porous decor ative landscape pebbles, the medium sized trees and
shrubbery, together with the blocked/broken storm water pipe
adjacent to the walls of the building affect the structural
performance of the foundations. This ultimately results in the
saturation of the un derlying clay foundation material. During
extended periods of fine weather, drying of the clay and the
resultant shrinkage movement would be accentuated by the
excessive range in moisture content of the clay.
Algae and moss build up to the sout hern side ex ternal wall is the
result of long term moisture saturation for an extended period of
time.
It is likely that these wall cracks situated in the middle of the
residence have resulted from water percolating under the external
edge beam and foundations. Theref ore it is considered that the
wall cracks are due to differential movements in the foundation
material resulting from shrink/swell movements on the clay
produced by seasonal moisture changes.
FSP’s supplementary
report from builder (MK)
Report
12.10.2015
Builder was now in receipt of engineer’s report and photographs
provided by the applicant which were taken by their plumber’s
CCTV inside the stormwater pipe to the southern elevation of the
building
Reviewed photographs from the applicant’s plumber and n oted
tree roots growing inside the stormwater pipe
Confirms tree roots were visible. Tree roots are from medium - size
trees at neighbour’s house
Other causes included rainwater which percolated from the
neighbour’s land and movement of clay soil
Noted moss shows long term moisture saturation
FSP’s case notes (various
dates)
Records telephone conversations between the applicant and the
FSP on various dates.
Case No: 441650 Determination Page 9 of 9
3.5 Other relevant material considered and relied on
Parties’ submissions, emails, photographs, reports and all attachments to