Storm-related brick wall collapse claim and loss of rent denied on corrosion exclusion
Text of the determination
Determination
Case No: 441605 Determination Page 1 of 9
Case number: 441605 27 June 2017
1 Overview
1.1 Dispute
The applicant held a landlord insurance policy with the financial services provider
(FSP), which provided cover for his tenanted investment property. The applicant
lodged a claim under the policy after a brick wall at his property collapsed following a
storm in June 2016.
The FSP denied the applicant’s claim on the basis that the collapse was not caused
by the storm but by factors which are excluded from cover under the policy (namely,
the corrosion of the brick wall ties o ver an extended period of time).
The applicant seeks cover for the costs of repairing the wall, together with loss of rent
for the seven month period until the repairs were completed.
1.2 Issues and key findings
Is the FSP liable for the damage to the applicant’s property ?
The available information establishes that the corrosion of the wall ties was a
proximate cause of the collapse, operating interdependently and concurrently with
the strong winds experienced during the storm.
However, the incident cover for storm damage under the policy is not subject to the
exclusion for damage caused by the corrosion. Accordingly, the FSP cannot rely on
this exclusion to deny the ap plicant’s claim.
Is the applicant entitled to payment for loss of rent?
The cover for loss of rent provided by the policy is subject to the exclusion for
damage caused by corrosion, rust or deterioration. Accordingly, the FSP is entitled to
rely on the Wa yne Tank principle to deny the applicant’s claim for loss of rent.
The FSP has previously agreed to pay the applicant loss of rent benefits for the
period from 24 June 2014 to 9 July 2014, in light of advice provided to his broker at
the time.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant the amount of $25,630 in respect of the
damage to his property, plus interest on this amount at the rate calculated in
Case No: 441605 Determination Page 2 of 9
accordance with section 57 of the Insurance Contracts Act 1984 (Cth) (the Act), from
30 November 2014 until the payment date.
In addition, the FSP is required to pay the applicant loss of rent benefits for the
period from 24 June 2014 to 9 July 2014, together with interest at the rate
determined in accordance with section 57 of the Act, from 9 July 2014 until the
payment date.
Case No: 441605 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP liable for the damage to the applicant’s property ?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for accidental damage to the insured property .
In this context, ‘accidental damage’ is defined to mean damage caused by an
unintentional act or an unforeseen and uncontrollable incident.
The policy states that there are also a number of incidents that will be covered under
specific conditions. These incidents (together with the relevant conditions) are listed
separately and include damage which occurs as a result of storm, flood rainwater or
wind.
The FSP says the ‘incident cover’ provided under the policy is a sub -set of the
broader cover for accidental damage. However, I do not agree that this is the case.
Both the manner in which the policy is drafted and the specific wording used indicate
that the incident cover is provided over and above the general accidental damage
cover. In this regard, I note that:
after setting out the accidental damage cover, the policy states that ‘There are
also a number of incidents we will cover under specific conditions ..’ [emphasis
added]; and
the description of the ‘incident cover’ appears under a heading of the same siz e
and format as the preceding heading for ‘accidental damage cover’.
On this basis, I consider the cover for storm damage under the policy is provided
separately and in addition to the cover for accidental damage.
Applicant has established a prima facie claim for storm damage
The reports prepared by the various contractors who inspected the applicant’s
property confirm that the top courses of the outer skin of an external double brick
cavity wall collapsed during a storm on 24 June 2014.
Both the FSP’s engineer (MC) and the applicant’s engineer (WC) confirmed that the
property was affected by high winds during the storm. WC noted that winds of up to
110km/hr were recorded in a nearby suburb.
On this basis, I am satisfied that the applicant has established a prima facie claim for
storm damage under the policy.
Case No: 441605 Determination Page 4 of 9
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on an exclusion under the policy to deny the
applicant’s claim.
In order to do so, the FSP must show that the proximate cause of the damage (that
is, the real, effective or dominant cause) was one of the factors which are excluded
from cover under the relevant section of the policy.
FSP says damage was caused by corroded wall ties
The FSP says it is not liable for the applicant’s claim because the collapse of the wall
was not caused by the strong winds experienced during the storm, but by the
corrosion and gradual deterioration of the wall ties connecting the two skins of the
cavity wall.
Wall ties are used in brick cavity walls (such as that at the applicant’s property) to
transfer forces from the outer wall to the better supported and more stable inner wall ,
to enable the wall to better withstand wind loadings.
After inspecting the wall at the applicant’s property, t he FS P’s engineer (MC)
reported that the wall ties had become significantly corroded over an extended period
of time, due to the age of the wall and its exposure to the coastal environment.
MC concluded that the failure of the corroded wall ties was the proximate cause of
the collapse. He considered that, had the ties not been corroded, the wall would not
have collapsed during the storm.
The applicant’s engineer (WC) acknowledged that the wall ties were corroded and
that this was a significant contributing factor in the collapse. However, WC advised
that the ‘extreme winds’ experienced during the storm were also a major contributing
factor.
Other than referring to the ‘high winds’ experienced during the storm, the report
provided by the FSP’s engineer (MC) does not give detailed consideration to the
strength of the winds or their likely effect on the applicant’s wall.
In the absence of any substantive consideration by MC of the relative effects of the
wind, I am not satisfied that the FSP has established that the corroded wall ties were
the sole proximate cause of the collapse.
However, the FSP says that, at the very least, the corroded brick wall ties were one
of the proximate causes of the collapse, together with the strong winds experienced
during the storm.
The FSP says that, in these circumstances, it is entitled to deny the claim based on
the Wayne Tank principle. This is an established principle of insurance law which
provides that, where damage is caused by two concurrent proximate causes (one of
which is excluded and the other which is not), then the insurer may rely on the
excluded cause to deny the claim.
Based on the information provided (including the reports of the parties’ engineers),
I am satisfied that the corrosion to the wall ties was a proximate cause of the
Case No: 441605 Determination Page 5 of 9
collapse, operating interdependently and concurrently with the strong winds
experienced during the storm.
Corrosion exclusion does not apply to storm damage
The FSP has sought to rely on an exclusion under the policy for damage caused by
rust, corrosion or gradual deterioration (either in isolation or together with the
operation of the Wayne Tank principle).
The policy exclusions are set out in a section of the policy headed ‘Exclusions to your
Cover’ , which lists various exclusions under the following sub-headings:
‘Accidental damage cover, additional cover and optional cover exclusions’
‘Liability cover exclusions’
‘General exclusions’
The exclusion on which the FSP seeks to rely appears under the first of these sub-
headings. Accordingly, this exclusion only applies to the accidental damage cover,
additional cover and optional cover provided under the policy.
For the reasons set out above, I consider the incident cover provided under the policy
(including cover for storm damage) is provided separately and in addition to the
accidental damage cover under the policy, rather than forming part of that cover.
On this basis, the exclusion for rust, corrosion and gradual deterioration does not
apply to the cover for storm damage, as this cover does not form part of the
‘Accidental damage cover’ to which the relevant exclusion applies.
The FSP says the exclusion is intended to apply to incident cover as well as
accidental damage cover. However, I am not satisfied that the drafting of the policy
supports this interpretation, given the context in which the exclusion appears.
Where the wording of the policy is ambiguous, the legal principle of contra
proferentem requires that the policy be interpreted in accordance with the meaning
which is contrary to the interests of the party who drafted it (in this case, the FSP).
The FSP could have clarified the issue by:
listing the relevant exclusion under the description of storm cover (which
includes a number of other exclusions specific to that event);
listing the exclusion under the ‘General exclusions’ heading, which clearly
applies to all forms of cover provided under the policy; or
clearly identifying incident cover as a sub-set of accidental damage cover.
As the exclusion for corrosion does not apply to storm damage, the FSP is unable to
rely on this exclusion (and the operation of the Wayne Tank principle) to deny the
applicant’s claim for property damage.
FSP is required to pay applicant additional amount for repairs
For the reasons outlined above, the FSP is unable to rely on the relevant policy
exclusions to deny the applicant’s claim. Accordingly, the FSP is liable for the
damage to the applicant’s property resulting from the collapse of the wall.
Case No: 441605 Determination Page 6 of 9
The policy states that, where a building claim is cash settled, the FSP will only pay
the applicant the amount which reflects the cost of repairing or rebuilding that part of
the property that suffered loss or damage.
The applicant has provided a quotation for $64,075 from his builder (SC) for the cost
of the repairs. The FSP paid the applicant 50% of the quoted amount ($32,037.50) as
an ex gratia payment in November 2014.
The FSP says it should not be liable for the full amount of SC’s quotation because:
it includes the repair of items which were not damaged as a result of the storm
(such as the brick ties, which were damaged by corrosion); and
the works undertaken (including the installation of new steel columns) will result
in the wall being repaired to a better condition than when it was new.
The reports provided by the parties’ engineers (MC and WC) differ slightly in relation
to the nature of the recommended repairs.
In particular, the FSP’s engineer (MC) considered that the repairs required were
substantially limited to the reinstatement of the outer skin brick wall in its entirety, and
did not consider that the inner skin wall had suffered any significant damage.
However, the applicant’s engineer (WC) considered that the loadings to which the
inner skin wall had been subject during the storm necessitated the insertion of two
steel posts into the outer wall to provide additional support.
On the other hand, WC advised that it was unnecessary to demolish the whole of the
outer skin wall, as the portion which remained standing could be retrofitted with new
brick ties.
While the FSP says the amount of SC’s quotation exceeds its liability under the
policy, the amount quoted is broadly consistent with the estimate of $60,500 provided
by the FSP’s engin eer (MC) based on his scope of works for the repairs (although it
is unclear exactly what SC’s scope of works included) .
In the circumstances, I consider it is fair that the FSP reimburse the applicant an
amount which is equal to 90% of SC’s quotation. Accordingly, the FSP is required to
pay the applicant an additional amount of $25,630.
Accordingly, the FSP is required to pay the applicant the amount of $25,630 for the
remainder of the repair costs. The FSP is required to pay interest on this amount at
the rate calculated in accordance with section 57 of the Act, from 30 November 2014
until the payment date.
2.2 Is the applicant entitled to payment of loss of rent?
FSP is entitled to rely on exclusion to deny cover for loss of rent
The policy schedule confirms that the applicant had selected the optional cover
available under the policy for loss of rent. Such cover is provided where the
applicant’s property suffers loss or damage and i s uninhabitable as a result.
Case No: 441605 Determination Page 7 of 9
As noted above, the optional cover provided under the policy (including cover for loss
of rent) is subject to the exclusion for damage caused by corrosion, rust or
deterioration.
For the reasons outlined above, I am satisfied that the corrosion to the wall ties was a
proximate cause of the wall collapse, operating interdependently and concurrently
with the strong winds experienced during the storm.
On this basis, the FSP is entitled to rely on the Wayne Tank principle to deny the
applicant’s claim for loss of rent.
However, the FSP has acknowledged that it initially advised the applicant’s broker
that the loss of rent claim would be paid. Accordingly, the FSP has agreed to pay the
applicant loss of rent benefits for the period from 24 June 2014 to 9 July 2014 (being
the date the FSP advised the broker the claim would be denied).
I am satisfied it is fair and reasonable that the FSP pay the applicant loss of rent
benefits for this period, together with interest at the rate determined in accordance
with section 57 of the Act, from 9 July 2014 until the payment date.
Case No: 441605 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to the dispute
This dispute has not been the subject of a Financial Ombudsman Service (FOS)
recommendation. Due to the nature of the dispute, it has been referred directly for
determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Accidental
damage cover
Accidental damage cover
We will cover your buildings or contents for any accident al loss or damage.
There are also a number of incidents we will cover under specific conditions –
these are listed on the following pages …
Any cover we provide is subject to exclusions.
For exclusions to this cover , see pages [xx] to [xx]
Incident
cover
Incident cover provided under specific conditions …
Storm, flood, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of storm,
flood, rainwater or wind.
We will not cover loss or damage as a result of ….
Optional
cover
Optional cover you can add to your policy
You can broaden the scope of your cover by adding any of the following options,
You will need to apply for the cover and pay an additional premium. Any options
that we agree to add to your policy will be listed on your current schedule.
Any cover we provide is sub ject to exclusions.
For exclusions to this cover , see pages [xx] to [xx]
Loss of rent
With this option, if your buildings or sections of your buildings suffer loss or
damage and are uninhabitable as a result, we will cover any loss of rent equal to
Case No: 441605 Determination Page 9 of 9
Subject Terms
the wee kly amount as stated on your rental agreement or periodic tenancy
agreement for up to 12 m onths. The most we will pay is up to the sum insured, as
listed on your schedule.
Exclusions Any cover we provide is subject to the following exclusions.
Accidental damage cover, additional cover and optional cover exclusions
We will not cover any loss or damage as a res ult of, or caused by: …
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …
Liability cover exclusions
We will not cover …
General exclusions
We will not cover any loss or damage, or liability as a result of, or arising from: …
Settlement of
claims
How we settle a buildings claim
If your buildings suffer loss or damage, we will decide whether to: …
repair
rebuild, or
pay you the cost to repair or rebuild that part of your buildings that suffered
loss or damage.
If we do, we will: …
only repair, rebuild or pay you for the part or parts of the building that actually
sustained loss or damage ….
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.