Home / Financial Firm (Unknown - Insurer) / Determination 441194

Determination 441194

Storm damage claim declined under exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$9,943
Non-financial loss$500
Amount claimed$15,943
SourceAFCA PDF

Summary

The applicant claimed storm damage to a fence and retaining wall, which the FSP declined as caused by excluded factors. AFCA found the storm was a prima facie cause and the FSP could not rely on the exclusions, ordering repair costs, interest, engineer fees and non-financial loss compensation.

The insurer bears the onus to prove an exclusion applies, and the competing engineering evidence did not establish that excluded factors were a proximate cause of the loss.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 441194 Determination Page 1 of 7 Case number: 441194 30 May 2017 1 Overview 1.1 Dispute The applicant lodged a claim under her home insurance policy with the financial services provider (FSP) following the collapse of a timber fence and retaining wall at her property in September 2014. The applicant says the collapse was caused by strong winds experienced during a storm. The FSP denied the applicant’s claim on the basis that the damage was not caused by the storm but by factors which are excluded under the policy (namely, faulty workmanship, rot and/or gradual deterioration). The applicant disputes the FSP’s denial of her claim and seeks cover for the cost of repairing the damage. She is also dissatisfied with the manner in which the FSP managed her claim. 1.2 Issues and key findings Is the FSP liable for the claimed damage? The applicant has established a prima facie claim for accidental damage (due to storm) under the policy. The available information does not establish that, on the balance of probabilities, the excluded factors identified by the FSP were a proximate cause of the loss. Accordingly, the FSP is liable for the applicant’s claim. Is the applicant entitled to any other amounts? The applicant is entitled to reimbursement of the fees incurred in obtaining her engineer’s report. She is also entitled to compensation for non -financial loss due to the FSP’s handling of her claim. 1.3 Determination This determination is in favour of the applicant. The FSP is to pay the applicant the amount of $8,622.84 in full and final settlement of her claim, plus interest as set out in section 2.1 below. In addition, the FSP is to pay the applicant the amount of $1,720 (comprising $1,320 as reimbursement her engineer’s fees and $500 as compensation for non -financial loss. Case No: 441194 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP liable for the claimed damage? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie (or valid) claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant’s policy provides cover for accidental damage to her property, subject to the conditions and exclusions set out in the policy. The cover for accidental damage specifically includes cover for damage caused by storm, rainwater or wind. Applicant has established a prima facie claim The available information confirms that a section of the timber paling fence and timber sleeper retaining wall along the eastern boundary of the applicant’s property collapsed in or around September 2014. The applicant says the collapse was caused by strong winds experienced during a storm on 9 September 2014. She says the winds knocked over the paling fence, impacting the retaining wall and causing it to collapse. When the applicant lodged her claim in December 2014, she described the damage as ‘strong winds and storm’ damage. The applicant has subsequently provided copies of media reports which confirm that the surrounding area was affected by storm conditions on 9 September 2014. She has also provided evidence that emergency services received several call-outs to her suburb (presumably as a result of the storm). The applicant ’s engineer has provided a report which states that the retaining wall at her property appears to have failed due to the force of the wind experienced during the storm. The FSP disputes that the winds experienced during the storm were sufficient to cause the claimed damage, based on a report provided by its engineer (FM). However, the meteorological data relied on by FM in his report was sourced from a weather station in a suburb (VB) which is approximately 6.5 kilometres from the applicant’s property. The information provided by the applicant indicates that, unlike her suburb, there were no emergency service call-outs to VB. This suggests that the storm conditions affecting the applicant’s suburb were likely to have been more severe. Based on the above, I am satisfied that the applicant has established a prima facie claim for accidental damage (caused by a storm). Case No: 441194 Determination Page 3 of 7 Accordingly, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny the applicant’s claim. FSP says damage was caused by excluded factors During the course of the claim, the FSP paid the applicant an amount of $3,500, which represented the cost of replacing the timber paling fence. The claim notes reflect that the FSP paid this amount because its contractors had removed the collapsed fence, thereby preventing the applicant from reusing the materials. However, the FSP continues to deny liability for the damage to the fence as well as the damage to the retaining wall. The FSP says it is not liable for the claimed damage because it was not caused by the winds experienced during the storm in September 2014, but by factors which are excluded under the policy (such as faulty workmanship, rot and gradual deterioration). In order to be entitled to deny the applicant’s claim, the FSP must show that the proximate cause of the damage (that is, the real, effective or dominant cause) was one or more of the excluded factors referred to above. In their submissions, both parties have referred to the Wayne Tank principle. This is an established principle of insurance law which provides that, where damage is caused by two or more concurrent proximate causes (one of which is excluded and the others are not), then the insurer may rely on the excluded cause to deny the claim. In the present case, the FSP is required to show that one or more of the excluded factors was (at least) a proximate cause of the claimed damage. Consultants have provided conflicting opinions During the course of this dispute, the parties have appointed several consultants (including three engineers) to determine the cause of the damage. The first engineer (FM) appointed by the FSP reported that the damage had been caused by the inadequate design and construction of the retaining wall (and the lack of adequate drainage), which meant that the wall was unable to resist the lateral loading imposed by the retained soil behind it. However, the second engineer (MC) engaged by the FSP an d the applicant’s engineer (IC) have advised that the failure of the retaining wall was not caused by pressure from the soil behind it (as evidenced by the fact that the banked up soil remained largely intact). MC and IC also confirmed that the drainage provisions were adequate. As outlined above, FM’s conclusions about the likely impact of the winds experienced during the storm were based on meteorological data which the applicant has shown was not necessarily indicative of the weather conditions at her property. Case No: 441194 Determination Page 4 of 7 As outlined above, the applicant’s engineer (IC) considered that the fence and retaining wall had collapsed due to the effects of the strong winds experienced during the storm. In his report, IC advised that:  the maximum wind speeds recorded at the weather station in VB did not preclude the fence having been affected by wind gusts from different directions;  the effects of wind suction could have resulted in the ends and corners of the fence being subject to more extreme pressure;  the reported wind speeds during the storm reached (or exceeded) the required wind design load for the retaining wall; and  the fact that the damage was more severe at the end where the fence was not shielded by the house was consistent with his view that the damage had bee n caused by the suction effects of the wind, which would have been greatest in this area. The second engineer (MC) appointed by the FSP concluded that the damage to the fence and retaining wall had occurred as a result of the failure of the timber uprights due to rot. MC advised that the bottom of the timber uprights had rotted because they were embedded directly in the soil to a depth of 300 millimetres and were only encased in concrete below that point. MC stated that, as a result, the bottom of the posts had deteriorated over time. MC also advised that the applicant’s retaining wall was not compliant with applicable building requirements. However, it appears that the Australian Standard and building regulations to which MC referred were not introduced until after the retaining wall was constructed. FSP is unable to rely on exclusion As outlined above, each of the three engineers appointed to determine the cause of the damage has identified a different proximate cause – namely, faulty design and construction (FM), strong winds (IC) and gradual deterioration due to rot (MC). As outlined above, FM’s conclusions about the inadequate construction of the retaining wall have been subsequently disputed by both IC and MC. While the photographs provided confirm the existence of rot at the base of some of the fence posts, it is not clear to what extent rot was present along the length of the 20 metre section which collapsed. Further, I am not satisfied that the presence of rot is of itself sufficient to establish that this was the proximate cause of the collapse. Other than referring to wind as ‘the straw that broke the camel’s back’, MC’s report does not consider the strength of the winds experienced during the storm in September 2014, or the likely effect of such winds on the stability of the fence (regardless of any deterioration already present). Case No: 441194 Determination Page 5 of 7 In the absence of any substantive consideration by MC of the relative effects of the wind (as identified by the applicant’s engineer (IC)), I am not satisfied that the FSP has established that the deteriorated condition of the fence posts was (at least) a concurrent proximate cause. I note that the FSP had previously accepted a claim by the applicant for damage to a separate section of the fence and retaining wall, following a storm which occurred in late 2011. The FSP says the prior claim establishes that the fence was already in a deteriorated state at this time. However, the FSP’s decision in respect of the prior claim could equally be considered as indicative of the likely effects of wind on the fence and retaining wall. FSP is liable for costs of repairs to retaining wall For the reasons outlined above, the FSP is unable to rely on the relevant policy exclusions to deny the applicant’s claim. Accordingly, the F SP is liable for the damage to the fence and retaining wall. As noted above, the FSP has paid the applicant the amount of $3,500 for the cost of replacing the timber paling fence. The applicant has acknowledged this amount is fair and reasonable. The applicant seeks payment of the remaining amount of $9,122.84 quoted by her builder (RG) for the necessary repairs. RG’s quotation was the lowest of three quotations obtained by the applicant. In these circumstances, I consider the FSP is required to pay the applicant the amount of $9,122.84 (less the applicable policy excess of $500) in full and final settlement of her claim. The policy excess had previously been refunded when the claim was declined. The FSP is required to pay interest on the settlement amount of $8,622.84 at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 22 March 2016 until the payment date. 2.2 Is the applicant entitled to any other amounts? FOS may reimburse costs and award compensation Under paragraph 9.4 of the Terms of Reference, FOS may require a financial services provider to contribute to legal or other professional costs incurred in the course of their dispute. However, FOS will not require a financial services provider to contribute more than $3,000 to such costs, unless exceptional circumstances apply. Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Case No: 441194 Determination Page 6 of 7 FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicant is entitled to reimbursement of engineer’s fees The applicant seeks reimbursement for fees of $1,320 paid to her engineer (IC) and fees of $5,500 paid to her claims preparer. The report provided by the applicant’s engineer (IC) was directly relevant to the outcome of her claim. It was reasonable for the applicant to engage her own engineer to dispute the findings of the FSP’s first engineer (FM), which were later shown to be incorrect. On this basis, I consider the FSP should be required to reimburse the applicant for the fees of $1,320 paid to her engineer. However, the FSP is not required to reimburse the applicant for fees paid to her claims preparer. The FOS process is designed to be accessible to applicants without the need for professional advice. Accordingly, the reimbursement of professional fees is only appropriate in limited circumstances (for example, where a dispute raises complex legal or technical issues). In the present case, the dispute ultimately turned on the cause of damage to the applicant’s fence and retaining wall. The applicant was being assisted by her son, who works in the insurance industry. In these circumstances, I am not satisfied it was necessary for the applicant to seek the assistance of a claims preparer. While it was open to her to do so, the FSP is not required to reimburse her for these costs. Applicant is entitled to compensation for non-financial loss It has clearly taken an extended period of time to resolve the applicant’s claim. The FSP was not responsible for the initial delays in the lodgement and assessment of the claim, which occurred due to the applicant’s ne ed to seek assistance from a family member and obtain quotations from her repairers. However, the need to obtain additional engineering reports (after the initial advice proved incorrect) has contributed to the time taken to resolve the claim and the appli cant’s ability to repair her property. Having regard to the above, I consider it is fair in all the circumstances that the FSP be required to pay the applicant an amount of $500 as compensation for non- financial loss. Case No: 441194 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 9 November 2016. The recommendation was rejected by the applicant. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). During the course of this dispute, the applicant has been represented by her son, who has been assisted by a claims preparer. For the purposes of this determination, submissions made by the applicant’s son and the claims preparer have been treated as if they had been made by the applicant herself.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.