Neighbour construction damage claim declined
Summary
Homeowners claimed damage caused by neighbouring excavation and sheet piling under their home policy. AFCA declined the claim as not malicious or vandalism and subject to the ground movement exclusion, but ordered the FSP to pay 50% of the applicants' engineer costs.
Malicious acts and vandalism require intention, and the ground movement general exclusion applies in any case; professional costs were shared because both parties relied on the engineer's report.
Subjects and remedies
home or building damagepay compensation
Text of the determination
Determination
Case No: 440748 Determination Page 1 of 5
Case number: 440748 11 May 2017
1 Overview
1.1 Dispute
The applicants made a claim under their home insurance policy with the financial
services provider (FSP) for property damage caused by their neighbour’s
construction works.
The FSP declined the claim because it did not consider an insured event had caused
the damage. It also says that the cause of the damage was ‘ground movement’ which
is excluded under the policy. The applicants disagree. They believe the event can be
classified as a malicious act or vandalism, and so should be covered.
The case manager recommended that the FSP was not required to pay the claim.
1.2 Issues and key findings
Is the FSP liable for the claim?
The FSP is not liable for the claim because the applicants have not established, on
balance, that an insured event caused the damage. That is because the evidence
does not support the conclusion that the claimed damage was malicious in nature,
nor can it reasonably be characterised as vandalism.
In any case, the general exclusion for damage from ‘ground movement’ applies.
Should the FSP contribute to the applicants’ professional costs?
The FSP is not required to pay the applicants’ legal costs. However, it is fair and
reasonable, under the circumstances, for the applicants to be partially reimbursed for
the work of their engineer, since the FSP also relied on those reports.
Are the applicants entitled to compensation?
The applicants are not entitled to compensation for non-financial loss, as the
evidence does not indicate there was any unreasonable delay or inconvenience
caused by the FSP.
1.3 Determination
This determination is substantially in favour of the FSP. The FSP is not required to
pay the claim. However, it must pay 50% of the costs of the applicant’s engineer , as
invoiced on 31 March and 30 April 2016.
Case No: 440748 Determination Page 2 of 5
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
I broadly agree with the case manager’s recommendation and the reasons for it.
2.1 The FSP is not liable for the claim
Policy provides cover for insured events, subject to exclusions
The applicants are required to show, on the balance of probabilities, they suffered a
loss caused by a risk insured against under the policy. In seeking to decline the
claim, it is then for the FSP to show that a policy exclusion applies, or that it is
otherwise entitled to do so.
The policy provides cover for damage to the a pplicants’ property caused by the
events listed in the policy, subject to certain exclusions and conditions. The list
includes the insured event of ‘ malicious acts and vandalism ’ .
Neighbouring construction works led to the damage
The applicants’ engineer is of the opinion that the neighbour’s installation of the sheet
piling and subsequent excavation works caused vibration and ground movement.
This in turn caused damage to the applicants’ property.
The applicants’ engineer noted a difference between the approved development
plans, and the actual work undertaken by the neighbour. The applicants say this
shows the neighbour’s construction work does not comply with the relevant approved
development plans.
The FSP does not challenge any of the engineering evidence provided by the
applicants.
Damage was not from ‘ malicious acts and vandalism ’
The policy does not provide definitions of ‘ malicious ’ or ‘ vandalism ’ . So, in
interpreting them, we apply their natural and ordinary meanings, considered in the
context of the policy as a whole.
The Macquarie Dictionary (online version) defines:
‘ malicious ’ as ‘ full of, characterised by, or showing malice; malevolent ’
‘ malice ’ as ‘ desire to inflict injury or suffering on another ’
‘ vandalism ’ as ‘ wanton or malicious destruction or damage of property ’ .
Case No: 440748 Determination Page 3 of 5
The courts have previously defined ‘ malicious ’ as ‘ the intentional doing of a wrong act
without just excuse ’’.
In rejecting the case manager’s r ecommendation, the applicants made detailed
submissions about the interpretation and meaning of the ‘malicious acts and
vandalism’ exclusion . They believe that because their neighbour knew the
construction work caused damage to their property, and that it did not comply with
the relevant approved development plans, then that means it constitutes vandalism
under the policy.
However, I consider that the element of ‘intention’ is also reasonably required. In this
case, it has not been suggested or shown that the neighbour carried out the
construction work with the intention of damaging the applicant’s prop erty. Even if the
neighbour undertook the work without caring about the possible impact on the
applicants’ property, I do not consider that lack of regard reflects the normal and
commonly understood meaning of ‘malicious acts and vandalism’, nor the intent ion of
the policy.
For that reason, the FSP is entitled to deny the claim.
However, even if I accepted that the acts of the neighbour were malicious or
constituted vandalism, there is a general policy exclusion which would defeat the
applicants’ claim: that is, ‘ground movement’ . T he engineer’s expert opinion of the
damage was that it arose from footing movement and rotation, caused by ground
settlement. The applicants have not disputed this conclusion.
2.2 The FSP should contribute to the applicants’ profess ional costs
Applicants seeking reimbursement of professional costs incurred
The applicants seek reimbursement of legal and other professional costs incurred in
dealing with this matter, and have provided invoices to substantiate those costs.
FSP not required to reimburse the applicants for their legal costs
The service provided by FOS is free for applicants and it is generally unnecessary for
either party to seek professional representation. If the applicants choose to be
represented, they will usually have to cover their representative’s fees themselves.
From the information available, it is not clear that the applicants’ lawyer was engaged
specifically or solely to deal with this dispute with the FSP in any case. Instead, it
appears the applicants instructed lawyers to assist with other legal proceedings
against the neighbour and the local authority.
Under the circumstances, I do not consider it fair or appropriate that the FSP be
required to reimburse the applicants ’ legal costs.
FSP required to reimburse 50% of the relevant engineer ’s fees
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a FSP to
contribute to professional costs incurred by applicants during the course of a dispute.
Case No: 440748 Determination Page 4 of 5
However, unless exceptional circumstances apply, FOS will not require a FSP to
contribute more than $3,000 to those costs.
The engineer’s report specifically identified the cause of loss. The FSP then relied on
that in its own submission, and did not appoint its own engineer to separately
investigate the damage. However, again, I consider it more likely than not that the
engineer was engaged (and would have been engaged regardless of this dispute) for
the purposes of the legal proceedings.
Given the joint reliance on the report by the applicants and the FSP, I consider it
appropriate in this case for the FSP to contribute to the cost of the engineer ’s work .
The applicants say they incurred costs of $5,123.25 for this. However, some of the
invoices provided suggest the work was at least in part for design and
remediation/reinstatement, rather than specifically for inspection and reporting on the
damage. Under the circumstances, I consider it fair that the FSP contribute 50% of
the engineer’s costs, as set out in the invoices dated 31 Ma rch and 30 April 2016.
2.3 The applicants are not entitled to compensation
No evidence the FSP unduly delayed the claims process
In particular circumstances, FOS is able to award compensation to applicants for
non-financial loss.
FOS takes a conservative approach to compensation for non-financial loss and
expects applicants to be moderately robust and bear the usual degree of
inconvenience when managing an insurance claim.
I accept the applicants spent considerable time and effort preparing submissions and
dealing with the matter generally. I accept this must have been a very difficult time for
them, and caused them significant inconvenience and stress. However, I have seen
nothing to suggest this should reasonably be attributed to the actions of the FSP in
its handling of the claim or dispute. So I am not persuaded it is fair to award
compensation in this case.
Case No: 440748 Determination Page 5 of 5
3 Supporting information
3.1 Key policy wording
Malicious acts and vandalism
We cover loss or damage to the building caused by malicious acts or vandalism e.g. vandals
damaging your letterbox or painting graffiti on the building.
…
What we do not cover – general exclusions
Ground movement
Erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other
earth movement, but we will cover landslide or subsidence that is specifically covered under
the following insured events:
• ‘Storm’;
• ‘Flood’ (but only if you have cover for ins ured event ‘Flood’);
• ‘Earthquak e and Tsunami’;
• ‘Explosion’.’
3.2 Experts’ reports
Record Key points
Applicant’s structural /
civil engineer (I)
Report
30 March 2016
t he location, orientation and type of damage to [applicants’ house]
is indicative of footing movement and rotation
t his resulted from ground settlement due to the installation of the
sheet piling at [neighbour’s property] and the subs equent
excavations
g ro und pressure behind the sheet pile wall will have caused lateral
deflection of the steel sheet piles towards the excavated side
t his movement will have caused some settlement of the ground
behind the sheet piles
f urthermore the vibration ex perienced duri ng the installation of the
sheet piles may have caused settlement of the sand below part of
[applicants’ house] footings.
Applicant’s structural /
civil engineer (I)
Addendum report
24 April 2016
[ a pplicants’ house] is an old building constructed with ful l masonry
load bearing walls
b uildings of this type are more susceptible to damage from
movement and vibration due to the age and brittleness of the
masonry walls
i t is not advis able to use sheet pile walls for temporary retaining
adjacent to such a buil ding, as the sheet piles are vibrated during
installation
t hey are also subject to movement after installation due to lateral
earth pressures on the vertically cantilevered steel sheet piles
b oth of these items can cause movement and/or vibration of any