Adequacy of repairs after vehicle impact and compensation claimed for claim handling
Text of the determination
Determination
Case No: 439795 Determination Page 1 of 8
Case number: 439795 7 March 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under their landlord insurance policy with the financial
services provider (FSP) after a vehicle accidentally drove into the front of their
property in October 2015. The FSP accepted the claim and appointed its contractors
to carry out the necessary repairs.
The applicants are dissatisfied with the quality of the repairs and say the FSP has
failed to repair all of the damage to the property caused by the vehicle impact. The y
also seek compensation for various losses suffered as a result of the manner in
which the FSP handled their claim.
1.2 Issues and key findings
Is the FSP required to take any further action?
The available information establishes that the FSP has settled the applicants’ claim
for loss or damage caused by the impact of the vehicle, in accordance with the terms
of the policy. Accordingly, the FSP is not required to take any further action.
Are the applicants entitled to compensation?
The circumstances of the claim do not justify the award of compensation.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to take any further action in relation to the applicants ’ claim.
The applicants are not entitled to compensation.
Case No: 439795 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the FSP required to take any further action?
Applicants say property has not been properly repaired
The applicant’s policy provides cover for loss or damage caused by the impact of a
vehicle, subject to the conditions and exclusions set out in the policy.
The FSP accepts that the applicant’s home was damaged by the accidental impact of
a vehicle on 6 October 2015. The vehicle careened down the sloping front yard of the
applicants’ property after the elderly driver lost control , impacting the building at the
north east corner of the ground floor.
The FSP appointed its contractors to repair the damage caused by the impact of the
vehicle impact.
However, the applicant is dissatisfied with the works carried out by the FSP’s
contractors. Among other things, the applicant says that not all of the damage
caused by the vehicle impact has been repaired and some aspects of the repairs are
inadequate.
The FSP considers the claim-related damage has now been fully repaired. It says the
additional items of damage identified by the applicant were not caused by the impact
of the vehicle, but were pre-existing and/or caused by factors which are excluded
under the policy.
The parties have provided extensive information in relation to the various disputed
items. The panel has carefully reviewed all of the information provided for the
purpose of determining the extent of the FSP’s liability for further repairs.
Repair process was lengthy and complex
The impact of the vehicle caused significant damage to the timber framework and
brick veneer walls of the ground floor of the applicants’ property. The FSP’s builder
(AB) carried out extensive make safe works to prevent further collapse and preserve
various aspect of the structure.
Once the make safe works had been completed, the FSP appointed its engineer
(MC) and building consultant (SB) to inspect the property and prepare a detailed
scope of works for the necessary repairs.
The applicants were living overseas, so they authorised their son (AS) to manage the
repair process. AS was living at the property at the time the accident occurred.
AS raised concerns that the scope of works prepared by the FSP’s contractors did
not address all of the damage to the property caused by the impact of the vehicle.
When the FSP failed to respond to his concerns, the applicants appointed their own
building consultant (BM) and engineer (ND) to advise on the repairs required.
After reviewing the reports provided by the applicants’ consultants, the FSP arranged
for its engineer (SB) to carry out a further inspection of the property.
Case No: 439795 Determination Page 3 of 8
SB confirmed that the scope of works should be expanded to include certain
additional damage which had become apparent since the accident (including
cracking along the eastern side of the building).
However, SB advised that certain other items of damage identified by the applicants
were unrelated to the vehicle impact.
The applicants initially lodged their dispute with FOS in May 2016 due to concerns
about, among other things, delays and poor quality of service experienced during the
claim process.
In June 2016, the FSP arranged a site meeting which was attended by AS and the
applicants’ building consultant (BM). Following the site meeting, the parties agreed
that the repairs would commence and would be undertaken by the FSP’s builder
(MK).
The FOS dispute was closed in July 2016, on the basis that the matter had been
resolved. However, in October 2016, the applicants sought to have the matter
reopened on the basis they were dissatisfied with the repairs which had been carried
out.
The FSP’s builder and engineer carried out a final inspection of the property on
9 November 2015, following which the FSP advised that the repairs had been
completed, other than the following items:
minor adjustments, alignments and grouting to area of the kitchen
adjustment of a cavity door in the en suite bathroom.
The FSP subsequently cash settled the applicants for a total of $1,332 for the
estimated cost of these repairs, based on a quotation provided by its builder (MK).
The FSP also cash settled the applicants a total of $4,262 for the estimated cost of
replacing damaged floor and window coverings, together with an additional amount
of $75 for a mirror that had not been replaced.
FSP has addressed all claim-related damage
Having carefully reviewed the available information, the panel is satisfied that all of
the damage to the applicants’ property caused by the impact of the vehicle has been
adequately addressed by the repairs carried out by the FSP’s contractors (together
with the cash settlement payments made).
In their submissions, the applicants have raised concerns about additional items of
damage to various parts of the property, including the first floor study, the kitchen, the
laundry, the ground floor bathroom, the garage and the rear wall at the south eastern
corner of the building.
The FSP’s engineer (MC) inspected the property following completion of the repairs
in November 2016 and confirmed that there was no outstanding, unrepaired damage
which had been caused by the vehicle impact.
In his report, MC considered each of the additional items of damage which had been
raised by the applicants at the time. However, MC concluded this damage had not
been caused by the impact of the vehicle in October 2015, but by factors which are
Case No: 439795 Determination Page 4 of 8
excluded from cover under the policy (such as general building movement and the
absence of flexible sealant).
In particular, the panel considers that the nature and location of the additional
cracking and movement damage identified by the applicants is not consistent with it
having been caused by the impact of the vehicle to the north eastern corner of the
building.
The FSP’s builder (MK) has provided a number of close u p, colour photographs
showing the completed repairs.
MK has also provided further information addressing a number of the additional
issues raised by the applicants. Among other things, MK has explained that several
of these issues have arisen over time due to the manner in which the first floor
extension of the property was constructed.
The panel considers that the reports provided by MC and MK provide a logical and
rational explanation of how the additional damage occurred, which is consistent with
the observed facts (as reflected in the photographs included in these reports).
In particular, the photographs support the conclusions reached by the FSP’s
contractors that damage such as the cracking to the bathroom tiles and the sagging
of the kitchen and garage ceilings has occurred over an extended period of time,
rather than as a result of the accident.
The applicants have provided a report from their building consultant (BM) which
concludes that the FSP’s contractors have not repaired all of the damag e caused by
the vehicle impact.
In his report, BM states that the impact of the vehicle would have resulted in a
considerable amount of energy being transferred into the timber framework of the
first floor.
On that basis, BM concludes that there are ‘still considerations’ with the solid or non -
flexible components of the building (including tiles, cornices and plasterboard), which
are not designed to withstand considerable impact stresses. In particular, BM
concludes that the kitchen needs to be replaced in its entirety.
However, the panel is not satisfied that BM’s report provides sufficient detail about
the additional damage and the mechanism by which it occurred to establish a causal
connection with the impact of the vehicle.
Among other matters, the panel notes that much of the additional damage has
occurred in areas which are relatively remote from the location of the impact (and/or
where there is no damage to the intervening rooms).
For the reasons outlined above, the panel is not satisfied that the additional items of
damage identified by the applicants were caused by the vehicle impact. Accordingly,
the FSP is not responsible for repairing these items.
FSP is not required to take any further action
The applicants say the repairs carried out by the FS P’ s contractors are inadequate in
a number of respects. Among other things, the applicants have raised concerns
Case No: 439795 Determination Page 5 of 8
about the quality of the paintwork, the installation of the vanity and conduct of the
electrical works.
As outlined above, the FSP has provided a number of photographs showing the
completed works, together with information from its builder (MK) responding to each
of the issues raised by the applicants.
Having carefully reviewed the information provided by the parties, the panel is not
satisfied that the applicants have established that the repairs carried out by the FSP
are inadequate.
As outlined above, the FSP cash settled the applicants for those aspects of the
repairs which remained outstanding as at November 2016. The panel considers that
a cash settlement was appropriate in the circumstances, given the relationship
between the FSP and the applicants’ son had broken down by that stage.
The applicants have not disputed the amount of the cash settlement, which was
based on quotations provided by MK and other third party suppliers.
The FSP also cash settled the applicants for various contents items which were
damaged or destroyed as a result of the impact event.
The FSP advised AS to contact its storage company to arrange for the return of the
items which had been removed from the front bedroom. It also asked AS to provide a
schedule of loss for any contents which had been disposed of or assessed as non-
restorable.
In these circumstances, the panel is satisfied that the FSP has settled the claim in
accordance with its obligations under the policy. Accordingly, the FSP is not required
to take any further action.
2.2 Are the applicants entitled to compensation?
Applicants are not entitled to cover for loss of rent
The applicants ’ policy provides benefits for loss of rent where the property becomes
unliveable due to an insured event. However, benefits are only payable where the
property is leased at the time the event occurs (and rent payments cease due to the
event).
As outlined above, the applicants ’ home was occupied by their son (AS) at the time
the vehicle impact occurred. The applicants have not provided any information which
indicates there was a lease agreement in place or that AS was paying rent.
Accordingly, the applicants are not entitled to cover for loss of rent under the policy.
During the course of the dispute, AS advised that he had been intending to sub-let
the property when the damage occurred. He sought cover for income foregone
during the period the repairs were carried out.
The information provided by AS does not establish that there was a lease in place
when the damage occurred. Further, as AS is not an insured person under the policy,
he is not entitled to benefits for loss of rent.
Case No: 439795 Determination Page 6 of 8
FOS may award compensation for financial and non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with their
claim.
In addition, FOS may award compensation for non-financial loss (capped at $3,000)
where an applicant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
FOS adopts a conservative approach to the award of compensation for non-financial
loss. FOS expects applicants to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim.
The applicants are dissatisfied with the manner in which the FSP has managed their
claim.
Among other things, the applicants say that the FSP and its contractors have:
unreasonably delayed the settlement of their claim
failed to respond to concerns raised during the claims process
falsified facts and bullied, threatened and intimidated their son
The applicants say their son (AS) has suffered financial and non-financial losses as a
result of the manner in which the FSP has handled the claim. In particular, they say
AS has suffered stress and depression and was unable to work for several months.
Applicants have not established misconduct
As outlined above, the applicants have accused the FSP and its representatives of
deliberate bullying and intimidation. For its part, the FSP and its contractors have
denied that any such behaviour occurred.
The concerns identified by the applicants raise issues of serious misconduct. The
panel considers it inappropriate to make a finding on such matters without a
substantial weight of proof confirming the events alleged by the applicants occurred
in the manner claimed.
Having carefully reviewed the claim history and the correspondence between the
parties, the panel is not satisfied that the available information establishes any
misconduct, as asserted by the applicants on the part of the FSP or its contractors.
Applicants are not entitled to compensation
It is clear that it has taken an extended period of time to resolve the applicants’ claim.
The difficulties experienced during the claim process have been exacerbated by the
breakdown in the relati onship between the FSP, its contractors and the applicant’s
son.
The FSP acknowledges that it delayed the progress of the claim by initially failing to
engage its engineer to reinspect the property, after the applicants raised concerns
that the first scope of works was inadequate. This resulted in the applicants having to
appoint their own building consultant and engineer.
Case No: 439795 Determination Page 7 of 8
The FSP has paid the applicants the amount of $3,000 as compensation for the
delays experienced. The FSP has also reimbursed the applicants for the fees paid to
their consultants (approximately $7,000).
The panel considers these payments were appropriate, given the FSP’s subsequent
reinspection confirmed that additional damage had become apparent that needed to
be added to the scope of works.
However, the panel does not consider that the FSP was solely or primarily
responsible for any further delays once the repairs commenced in mid-2016.
The repair process was necessarily complex, due to the nature of the damage
sustained to the property. However, the FSP sought to engage with the applicants’
representatives to ensure the repairs were carried out appropriately.
Further, the available information indicates that the repairs carried out resulted in
various improvements to the property, thereby exceeding the FSP’s liability under the
policy.
For the reasons outlined above, the panel does not consider that the applicants are
entitled to any additional compensation.
Case No: 439795 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
At various stages during the course of this dispute, the applicants have been
represented by their son. For the purposes of this determination, submissions made
by the applicants ’ son have been treated as if they had been made by the applicants
themselves.