Determination 439612

Cash settlement offer for 2016 water damage to flooring

FirmFinancial Firm (Unknown - Insurer)
Decided2017-03-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$22,218
SourceAFCA PDF

Summary

The applicant claimed for 2016 water damage to his downstairs floor, having already been cash settled for a 2012 claim on the same repairs. AFCA found the FSP's offer of $1,220.24 was reasonable and that nothing further was payable.

Under the indemnity principle the applicant has already received enough to fund the full repair of the same area, so a second full quotation would over-compensate him.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 439612 Determination Page 1 of 8 Case number: 439612 9 March 2017 1 Overview 1.1 Dispute In January 2016, the applicant lodged a claim with the financial services provider (FSP) for damaged flooring arising from the escape of liquid. The FSP appointed an assessor (J) to attend the property and report on the extent and cause of the damage. It also appointed a contractor (T) to provide a scope of works to repair the damage. The quote to repair the damage was $22,218.24. The FSP noted the area and the scope of work provided by T was similar to a water damage claim lodged in 2012. The FSP cash settled the 2012 claim, as requested by the applicant for $19,498 (including GST and net of policy excess). However, the applicant did not repair the flooring prior to the second event occurring. The FSP therefore offered $1,220.24 (including GST and after deduction of the $1,000 policy excess), being the difference between the cash settlement accepted by the applicant in 2012, and the quote provided by T in 2016. The applicant disputes the cash settlement because he says there are two separate claims and the FSP should pay him in full for each occurrence. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicant. In the circumstances, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the cash settlement offer reasonable in the circumstances? The cash settlement is reasonable in the circumstances because the material provided establishes:  the scope of works for the 2016 claim covers the same repairs as the scope of works for the 2012 claim  the applicant does not dispute he did not complete repairs after the 2012 claim  the amount paid in 2012 together with additional amount offered in the 2016 is sufficient to place the applicant back in the same position he was in prior to both incidents, that is, with a fully restored floor. Case No: 439612 Determination Page 2 of 8 1.3 Determination This determination is in favour of the FSP. The FSP ’s settlement offer is reasonable and the FSP is not required to pay the applicant anything further for repairs as a result of the 2016 incident. Case No: 439612 Determination Page 3 of 8 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. No new material provided after recommendation After the recommendation was rejected, the applicant made a further submission in which he essentially reiterated his position. He provided no new material. 2.1 Is the cash settlement offer reasonable in the circumstances? The Applicant must prove an insured event caused the loss and the extent of loss The applicant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds . The applicant also has the onus to establish the extent of the loss caused by the 2016 event. It is not in dispute the FSP’s policy with the applicant responded to claims he made in 2012 and 2016. The dispute relates to the amount offered to settle the 2016 dispute. The applicant makes a number of contentions about the FSP’s offer including:  these are two separate incidents some four years apart  the FSP should have recovered from the wrongdoer in the 2012 claim so the excess could be returned to him  when he accepted a cash settlement in 2012, he was not advised that any future water damage claim will not be honored. The Applicant has not provided any independent expert material, photographs or plans of the areas of damage The applicant maintains the 2016 incident is totally separate to the 2012 incident. He says the 2012 damage occurred in front of a cupboard in the kitchen. The applicant’s broker explained in an email this incident resulted in pipes spilling water over an area a couple of feet in front of the refrigerator. In 2016, the applicant says the extent of the damage was more than in the 2012 claim. He says water spilled on the kitchen floor right in front of the refrigerator into the dining room, lounge room and the entrance hallway. He says this area is close to but not the same area as the original damage. He says he has an open plan house and the areas affected by the 2016 incident are quite separate and well to the right of the 2012 damage. The applicant has the onus to establish the extent of the damage caused by the 2016 claim. The applicant has not provided any independent expert material, photographs, Case No: 439612 Determination Page 4 of 8 or a plan of the areas of damage caused to the home in 2016 as compared with a plan of the areas of damage caused to the home in 2012. The FSP has provided material from its contractors in 2012 and 2016 The FSP has provided material from its contractors. In March 2012, C builders inspected and photographed the damage. The photographs are of the kitchen floor, sunken floor, open floor area and hallway. Further, C prepared a scope of works and a quotation. C’s quotation shows C allowed to re-sand and polish not only the water damaged timber kitchen floor but also the “flow through” livi ng area in an area of 265 m². In addition, skirting boards in the open living area were to be prepared and painted. Other allowances were made for removal and storage of furniture, supervision and site management, and a professional clean up on completion. The total was $19,998. The material also shows in March 2012, the applicant was cash settled $19,498. Therefore, the policy excess at the time of the 2012 claim must have been $500. On 15 January 2016, the FSP’s adjuster J attended to inspect water dama ge which had occurred a few days earlier. The damage (as described in J’s report) was to the flooring adjacent to the fridge within the open plan kitchen, living, dining area. J observed boards within the vicinity of the fridge had begun to raise slightly. J also noted the 2012 claim related to a tap which was situated within the kitchen cupboard next to the fridge. J reported damage was sustained to 230 m² of the oak flooring and it would be necessary to paint the skirting boards throughout the property following the floor works. J estimated repair works would take about 14 days during which time alternative accommodation would be required On 21 January 2016 T builders provided a quotation which included the cost of relocating furniture from all of the gr ound floor areas. Relevantly, T’s quote says: “ Floor panels 8. Sand fill and seal entire downstairs timber floor area (approximately 230 m²) (my emphasis) Painting 9. Prepare, seal and paint skirting to downstairs area ” T’s quote (including GST) is in the amount of $22,218.24. Material provided does not establish the 2016 damage is different from the 2012 damage Although the applicant contends the 2016 damage is close to but not the same area as the 2012 damage and the areas affected by the 2016 incident are quite separate and well to the right of the 2012 damage, the material provided does not establish this contention. Although I accept the water flowed in the 2012 incident from a cupboard next to the refrigerator and the water flowed from the refrigerator itself in Case No: 439612 Determination Page 5 of 8 the 2016 incident, nonetheless, the FSP’s quotation to repair the damage in 2016 is for the entire downstairs timber floor and all the skirtings in the downstairs area. I am satisfied from the material provided although the water flowed from slightly different (although proximate) areas in the kitchen in 2012 and 2016, the material establishes on both occasions the FSP was prepared to pay to repair the entire downstairs timber floor and paint all the skirtings. The material provided does not e stablish the applicant’s contention the 2016 damage is quite separate to the 2012 damage as the FSP is prepared to repair all the downstairs floor and all the skirtings. FSP’s cash settlement offer is reasonable The FSP’s policy provides when there is dam age to the insured property the FSP will pay the reconstruction cost. The policy defines reconstruction costs to mean: “ the amount required at the time of loss to repair or rebuild the house, whichever is less, at the same location with the same quality of materials and workmanship which existed before the loss .” The amount required at the time of the 2016 incident to repair the water damage with the same quality materials and workmanship which existed before the loss is $22,218.24. When the 2016 incident occurred, the water damage from the 2012 incident remained. Although the applicant had been cash settled $19,498, the 2012 damage had not been repaired. The principles of indemnity pursuant to an insurance contract mean an insured is to be placed back into the position the insured would have been in prior to the insured event. Prior to the 2016 event, the applicant had already received $19,498 to repair all the downstairs floor and all of the skirting. I accept there have been two separate incidents some fo ur years apart, but I also accept on the material provided the FSP’s offers made in 2012 and 2016 together fairly compensate the applicant to repair the floor at the time of the loss in 2016. The FSP’s offer is calculated as follows: $22,218.24 cost to repair downstairs floor and skirting in 2016 - $19,998 cost to repair the downstairs floor and skirtings in 2012 = $2,220.25 - $1,000 policy excess 2016 = $1,220.24 amount offered by FSP in 2016. Although there were two separate water leaks, the material provided establishes the damage requires the same repair work to be done to the same area. The applicant has the 2012 settlement which together with the further amount offered (less policy excesses) represent the cost to repair the damage caused in the 2016 event. I agree with the FSP’s contention a full repair can still be done now and will bring the house back to the condition it was in both prior to the 2012 damage and the 2016 damage. Both the policy terms and the principles of compensation for damages do not result in payment of two separate quotations for repair work if the repair work is to the same area and is to be performed only once. Case No: 439612 Determination Page 6 of 8 In all the circumstances, I am satisfied the FSP’s off er to the applicant is reasonable as it represents the increased cost of repairs in 2016 due to the time which elapsed since 2012. I am satisfied from the material provided the extent of necessary repairs has not increased just the cost of the necessary repairs. And that cost can be met by this payment and the payment already made in 2012. To offer anything more would be to over compensate the applicant by around $20,000. Further, the FSP is also prepared to pay temporary accommodation expenses incurred by the applicant if the applicant moves out of the house while repair work is now carried out. Additional matters addressed The applicant complains when he accepted a cash settlement in 2012, he was not advised any future water damage claim will not be honoured. However, the material establishes the applicant is being fairly compensated for the 2016 claim. I am satisfied the 2016 water damage claim has been honoured pursuant to the policy terms and pursuant to general principles of calculation of damages. The applicant also says the FSP should have recovered from the wrongdoer in the 2012 claim so the $500 excess could be returned to him. The FSP says its subrogation department considered recovery from the refrigerator contractor but decided it would not be a viable option to pursue. In any event, the FSP is not obliged to pursue recovery rights either at law or pursuant to the policy conditions. Case No: 439612 Determination Page 7 of 8 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Policy extracts The relevant extracts from the policy are set out in the FSP’s notice of response dated 7 July 2016. Both the notice and the policy wording has been exchanged with the applicant. “Reconstruct ion cost Means the amount required at the time of loss to repair or rebuild the house, whichever is less, at the same location with the same quality of materials and workmanship which existed before the loss ….” “Conditional replacement cost If the payment basis is conditional replacement cost, We will pay the lesser of the reconstruction cost.” 3.3 Other material considered and reviewed  Parties’ submissions and all attachments to submissions.  Correspondence between the parties.  Scopes of work. Record Key points FSP’s builder (C) Report, photographs, and Scope of works 02 - 03 - 2012  Due to refrigerator internal wat er system leaking water has egressed ont o the timber floor causing water damage.  Floor now requires to be sand and polished, but due to the kitchen floor flowing into the open living area, the area to be repaired to match is 265m ² . Case No: 439612 Determination Page 8 of 8  Prepare and paint skirting boards 87lm .  Remove and store all furniture and re - instate on completion.  Al lowance for supervision and site management.  Professional final clean on completion.  Total $19,998. FSP’s builder (T) Scope of works 21 - 01 - 2016  Sand, fill and seal entire downstairs timber floor area.  Prepare and paint skirting boards.  Remove and store all furniture.  Remove all rubbish, leaving site clean and tidy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.