Home / Financial Firm (Unknown - Insurer) / Determination 438594

Determination 438594

Cash settlement amount for cyclone damage and claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$19,870
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

After cyclone damage to their home, the applicants disputed the FSP's cash settlement offer and its claim handling. AFCA ordered a cash settlement of $19,869.86 with interest, plus $1,000 non-financial loss compensation.

Having regard to the claim history and the failed repair process, a cash settlement was fair, with an uplift to cover residual risks and the lost lifetime guarantee.

Issues

Subjects and remedies

elderly or capacityhome or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 438594 Determination Page 1 of 11 Case number: 438594 24 April 2017 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP) after their property was damaged by Cyclone Marcia in February 2015. The FSP accepted the applicants’ claim and sought to arrange for the repair of their property. However, after the parties were unable to agree on a mutually acceptable scope of works, the applicants lodged a dispute with FOS raising a number of issues concerning the conduct of the FSP and its contractors. The earlier FOS dispute (413446) was resolved after the parties agreed to adopt the approach proposed by the FOS Case Manager, which required the FSP to arrange a further inspection of the property by an alternate contractor. The FSP subsequently sought to cash settle the applicants’ claim for the estimated cost of repairing the damage, in accordance with a quotation provided by the FSP’s builder (CQ) based on a scope of works prepared by the FSP’s consultant engineer (JH). The applicants are dissatisfied with the settlement offered and say the FSP should be required to repair their property. In addition, the applicants have raised a number of concerns about the manner in which the FSP has handled their claim since it was first lodged in February 2015. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim? Given the background to this dispute, any proposed resolution which requires further interaction between the parties is highly likely to lead to further delays. Accordingly, it is in the interests of both parties that the dispute be resolved in a manner which provides finality. For these reasons, it is fair in all the circumstances that the applicants’ claim be resolved by way of a cash settlement. Is the cash settlement offered by the FSP fair and reasonable? The scope of works and the quotation on which the FSP’s cash settlement offer is based are generally fair and reasonable. However, the cash settlement amount should be increased by $3,311.64 to reflect certain additional risks to which the applicants may be exposed, as a result of the claim being cash settled. Case No: 438594 Determination Page 2 of 11 Are the applicants entitled to compensation? The applicants are entitled to compensation of $1,000 for non-financial loss due to the manner in which the FSP handled their claim. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is required to pay the applicants the amount of $19,869.86 in full and final settlement of their claim, plus interest on this amount as set out in section 2.2 below. The FSP is required to pay the applicants an additional amount of $1,000 as compensation for non-financial losses suffered in connection with the claim process. Case No: 438594 Determination Page 3 of 11 2 Reasons for determination 2.1 Is the FSP entitled to cash settle the claim? FSP has accepted liability for storm damage The a pplicants’ policy provides cover for damage to their property caused by the events listed in the policy (including the insured event of storm), subject to the conditions and exclusions set out in the policy. The FSP has accepted that the a pplicants’ property was damaged by Cyclone Marcia in February 2015 and has offered them a cash settlement based on the estimated cost of repairing the damage, in accordance with a quotation provided by the FSP’s builder (CQ). The FSP’s most recent cash settlement o ffer for the damage to the property is $16,231.22, based on an updated quotation provided by CQ in March 2017. The FSP says this amount is sufficient to enable the applicants to carry out the necessary repairs (thereby fully indemnifying them for the damage caused by the cyclone). However, the applicants say the FSP originally agreed to repair their property and therefore should not be permitted to cash settle their claim instead. Insurer is generally bound by election to repair Under the terms of the app licants’ policy (as set out in the Product Disclosure Statement), the FSP may settle a claim for damage to the insured property by:  paying for the reasonable cost of repairing the damaged part of the building (and arranging to have the repairs carried out by its contractors); or  paying the applicants the reasonable cost of repairing the damaged part of the building. It is clear from the terms of the policy that the FSP has the discretion to decide which settlement method to adopt. Once an insurer makes an election to repair the insured property (rather than to cash settle the policyholder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, particular circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the insurer to seek to settle the claim by way of a cash settlement, provided that the cash settlement amount is sufficient to allow the policyholder to engage a builder directly to complete the necessary repairs. Parties were unable to agree on a mutually acceptable scope of works In the present case, the FSP initially elected to repair the damage to the applicants ’ property caused by the cyclone. Case No: 438594 Determination Page 4 of 11 Accordingly, the FSP arranged for its contractors to attend the property, prepare a scope of works and provide a quotation to carry out the repairs set out in the scope of works. After reviewing the scope of works, the applicants expressed concern that some aspects of the works were inadequate. They also sought clarification in relation to certain other issues. Among other things, the applicants were concerned that:  the proposed roof repairs did not take into account the applicable wind loading requirements, given their home was located in a cyclone rated area; and  the procedure set out in the scope of works for the repair of the damage to their roof was inadequate and might adversely affect their existing roof warranty. The applicants considered that, as elderly senior citizens, they were being improperly pressured by the FSP to sign a building contract based on a manifestly inadequate scope of works. After the appli cants lodged a complaint with the FSP’s Internal Dispute Resolution (IDR) department, the FSP arranged for the builder (SB) to provide an updated scope of works, which included provision for variations to be approved in the event that additional damage to the property was discovered during the course of the repairs. The FSP also confirmed that it would arrange for a certifier to attend the premises following the repairs to determine whether they had been carried out correctly and in accordance with the relevant standards. However, the applicants remained concerned that the repairs set out in the scope of works were inadequate to restore their property to its condition prior to the cyclone. In particular, the applicants remained concerned about the measures to be taken to repair the roof. Accordingly, the applicants lodged their initial dispute with FOS (dispute 413446) in relation to the adequacy of the scope of works and the conduct of the FSP and its contractors. Previous resolution attempts have been unsuccessful As outlined above, the initial FOS dispute (413446) was resolved after the parties agreed to adopt the approach proposed by the FOS Case Manager. This approach required the FSP to appoint contractors who had not been involved in the claim to date to attend the property and provide a quotation for the cost of repairing the damage caused by the cyclone . The letter prepared by the FOS Case Manager dated 13 November 2015 which outlined the proposed approach stated that:  if the applicants accepted the new quotation, then the claim would proceed; and  if the applicants did not accept the new quotation, then the FSP could cash settle the claim. Case No: 438594 Determination Page 5 of 11 In accordance with the agreed approach, the FSP arranged for an engineer (JH) to attend the property and inspect the storm-related damage. JH prepared a report dated 24 November 2015 which detailed the damage observed and included a scope of works for the necessary repairs. Following receipt of JH’s report, the FSP obtained q uotations from two builders for the repairs set out in the scope of works prepared by JH. The first builder (CP) quoted an amount of $7,889.20, while the second builder (CQ) quoted an amount of $15,322.95 (which was subsequently increased to $15,436.80). However, further issues arose in the course of implementing the agreed resolution process, resulting in extensive email correspondence between the parties over a period of approximately four months. This process culminated in the FSP offering to cash settle the applicants’ claim f or the higher of the two quotations, rather than undertaking the necessary repairs. Claim should be cash settled The applicants say the FSP should be required to authorise its builder to complete the repairs to the property. They say the FSP has previously committed to undertaking the repairs, both when the claim was initially assessed in March 2015 and in accordance with the agreed resolution of the initial FOS dispute in November 2015. However, having carefully reviewed the extensive claim history, I do not consider that requiring the FSP to arrange for the repair of the property would represent an effective method of settling the current dispute. While this approach may have been appropriate in the past, the nature of the correspondence between the parties following resolution of the previous FOS dispute (and their inability to finalise the claim) establishes that such a solution is no longer feasible. This correspondence indicates that disagreement and discord has arisen repeatedly, in relation to what might reasonably be considered to be relatively minor issues in the context of an insurance claim of this nature. At various stages during the course of this dispute, the applicants have described the conduct of the FSP and its employees as biased, scheming, deceitful, duplicitous, devious, manipulative and corrupt. They have stated that they have lost all faith and trust in the FSP. Further, even the personal involvement of the FSP’s CEO ( reiterating the FSP’s desire to achieve resolution) was ineffective to overcome the impasse between the parties and absolve the applicants’ concerns. It was in this context that the applicants lodged their current FOS dispute. In these circumstances, I consider that any proposed resolution to the dispute which requires further interaction between the parties is highly likely to lead to further delays. Case No: 438594 Determination Page 6 of 11 It is in the interests of both parties that the current dispute be resolved in a manner which provides finality, so that the applicants’ property can be repaired as soon as possible. For these reasons, I consider that it is fair in all the circumstances that the applicants’ claim be resolved by way of a cash settlement. This approach will avoid the necessity for any further interaction between the applicants and the FSP and will allow the applicants to directly engage a builder of their own choice to complete the repairs to the property. The applicants say it is unreasonable to expect them to supervise the repairs to the property, given their personal circumstances. However, having regard to the nature and extent of the necessary repairs, I do not consider that extensive supervision would be required. In light of the detailed scope of works provided by the FSP’s engineer (JH), I am satisfied that the applicants’ role would be limited to engaging the relevant contractors to complete the repairs. Further, I consider the applicants’ understandable concerns that the repairs be completed in a satisfactory manner can be adequately addressed through the determination of an appropriate cash settlement amount. An increase in the cash settlement amount would enable the applicants to engage an independent contractor to review the repairs (following completion by their builder) and confirm they have been completed to an appropriate standard. 2.2 Is the cash settlement offered by the FSP fair and reasonable? Revised scope of works for building repairs is appropriate As outlined above, the FSP has offered to cash settle the applicants for $16,231.22, being the amount quoted by its builder (CQ) for the cost of the completing the repairs . CQ’s quotation was based on a revised scope of works prepared by the FSP’s engineer (JH) in March 2017. As outlined above, JH had previously reported on the cyclone damage to the property (and the repairs required) in November 2015. However, JH was engaged to reinspect the property in March 2017 after the applicants expressed concern that further damage had occurred during the dispute process despite (or possibly because of) the temporary make safe repairs performed by the FSP’s contractors. In particular, the applicants expressed concerns about:  water penetration into the roof eaves and soffits around the damaged roof tiles;  potential damage to the gutters and gutter clips due to the manner in which the temporary tarpaulin had been attached; and.  damage to additional roof tiles due to foot traff ic on the roof by the FSP’s contractors. Case No: 438594 Determination Page 7 of 11 Having carefully reviewed the reports prepared by JH in November 2015 and March 2017, I am satisfied that these documents provide an accurate assessment of the damage to the property caused by the cyclone in February 2015, together with any additional damage arising out of the actions of the FSP’s contractors. JH’ s reports reflect a through and careful consideration of each aspect of the damage, supported by a series of close-up, colour photographs depicting the damaged areas. Further, I consider that the revised scope of works prepared by JH in March 2017 includes all of the repairs reasonably required to address the damage identified in JH’s reports . Among other matters, I note that JH’s scope of works provides for :  the engagement of a manufacturer-approved roofing contractor to carry out the repairs to the roof tiles; and  the provision of a certificate from the manufacturer (following completion of the repairs) confirming that the roof warranty has not been affected. The applicants have not provided any independent information (for example, a quotation prepared by their own engineer) which indicates that the repairs set out in JH’s updated scope of works are inadequate to address the damage to the property. Cash settlement amount should be increased to $19,869.64 (plus interest) As outlined above, the FSP’s cash settlement offer of $16,231.22 reflects the amount quoted by its builder (CQ) in March 2017 to carry out the repairs set out in JH’s updated scope of works. The applicants have previously questioned CQ’s ability to provide an accurate estimate, given his quotation was prepared on a desktop basis without carrying out his own inspection of the property. The applicants are concerned that, in the absence of an inspection, CQ may not have had enough information to identify the correct repair methods required. However, I am satisfied that sufficient information was provided in JH’s reports and his detailed scope of works (and by the applicants themselves) to allow CQ to identify appropriate methods for completing the repairs. To the extent that the scaffolding proposed by CQ may result in restricted access to the property (as advised by the applicants) the FSP has previously offered to increase the cash settle ment amount by $327, reflecting the cost of two nights’ temporary accommodation. The comparative quotations obtained by the FSP during the course of this dispute suggest that it is unlikely CQ has underquoted the cost of the works required in the present instance. As noted above, CQ had previously provided a quotation based on the first scope of works prepared by JH in November 2015. At that time, the FSP also obtained a quotation from a local builder (CP) who had inspected the property. Case No: 438594 Determination Page 8 of 11 CQ’s earlier qu otation for $15,436.80 (prepared in February 2016) was almost twice the amount of CP’s quotation for $7,889.20, which was prepared at a similar time and based on the same scope of works. In part, the difference between the two quotations reflected the fact that CQ had allowed for tradespeople from Brisbane to complete the works (which necessitated a significant allowance for travel and accommodation costs), while CP had quoted on the basis that local contractors would be used. In these circumstances, while the FSP has not obtained a comparative quotation from another builder based on JH’s updated scope of works, I am nevertheless satisfied that CQ’s quotation of $16,231.22 (plus the temporary accommodation allowance of $327) generally reflects the reasonable cost of undertaking the works set out therein. The applicants have not provided any independent information (for example, a quotation prepared by their own builder) which shows that the necessary repairs cannot be completed for the amount quoted by CQ. Nevertheless, I consider it is appropriate in the circumstances that the proposed cash settlement amount be increased to allow for the following:  the engagement of an independent contractor to confirm that the repairs have been completed to an adequate st andard (noting that CQ’s quotation already includes the inspection of the roof repairs by the manufacturer’s representative);  any volume discounts or rebates reflected in CQ’s quotation which are available to the FSP but are not available to the applicants; and  the additional risk to which the applicants are exposed as a result of them not obtaining the benefit of the life time guarantee provided under the policy (as would have been the case, had the FSP authorised the repairs). Given the comprehensive inspection undertaken by JH in March 2017, I do not consider that any additional provision for further unforeseen damage is required. On this basis, I consider it is fair in all the circumstances that the cash settlement amount be increased by an additional 20% (being $3,311.64) to allow for the issues identified above. The FSP is required to pay interest on the settlement amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 31 July 2015 (being the date of the original IDR decision) until the payment date. The FSP has previously agreed to waive the applicable policy excess. 2.3 Are the applicants entitled to compensation? FOS may award compensation for non-financial losses Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Case No: 438594 Determination Page 9 of 11 However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicants are dissatisfied with the FSP’s claims handling The applicants are dissatisfied with the manner in which the FSP has managed their claim. Among other things, the applicants say that:  they were pressured to agree to the initial scope of works prepared by the FSP’s contractors, which they consider was deliberately and manifestly inadequate;  the FSP has repeatedly failed to respond to their concerns, queries and requests for clarification and/or has provided only limited, impolite and shoddy responses ;  the FSP and its representatives have fabricated information and have behaved in a threatening, devious, fraudulent and unconscionable manner; and  the FSP has taken advantage of their personal circumstances in an attempt to prevent them receiving their full entitlement under the policy. The applicants advise they have suffered considerable stress and inconvenience as a result of the FSP’s claim management. The male applicant says he has been left bordering on a major breakdown, while the female applicant has suffered serious health issues. Applicants are entitled to compensation for non-financial loss Having carefully reviewed the claim history, I consider that the original scope of works prepared by the FSP’s builder (SB) did not provide sufficient information concerning the proposed repairs. Among other matters, the scope of works did not state that the roof repairs would be carried out by a contractor approved by the roof tile manufacturer or allow for the manufacturer’s representative to certify the repairs once they had been c ompleted. These matters were not addressed until after the applicants lodged their initial dispute with FOS, as a result of which JH was engaged to prepare a revised scope of works. I accept that the delay in obtaining a comprehensive scope of works has caused the applicants additional stress and inconvenience. However, based on the available information, I am not satisfied that the FSP deliberately arranged for the provision of an inadequate scope of works or colluded with the builder (SB) to disadvantage the applicants (as they have alleged). These allegations (and others made by the applicants) raise issues of serious misconduct on the part of the FSP and its contractors. It is not appropriate to make a finding on such matters without a substantial weight of proof confirming the events alleged by the applicants occurred in the manner claimed. Having carefully reviewed the claim history and the correspondence between the parties, I am not satisfied that the available information establishes any misconduct (of the kind asserted by the applicants) on the part of the FSP or its contractors. Case No: 438594 Determination Page 10 of 11 I acknowledge there were occasions during the claim process when the FSP did not respond to the applicants’ correspondence as promptly or fulsomely as they required and did not conduct the claim process in accordance with the applicants’ expectations (for example, by failing to arrange a written introduction from its builders before they attended the property). However, I also consider that the FSP has demonstrated good faith in attempting to resolve the claim and arrange for the repair of the applicants’ property, particularly since the initial dispute was lodged. For example, the FSP was willing to cash settle the claim based on the quotation provided by CQ in February 2016 (even though this was almost twice the amount of the comparative quotation provided by CP). Further, I accept that the personal involvement of the FSP’s CEO was intended as a conciliatory measure to facilitate the resolution of the dispute, even though it was not interpreted in this manner by the applicants. Having regard to the various factors outlined above, I consider that an award of compensation for non-financial loss in the amount of $1,000 is appropriate. Case No: 438594 Determination Page 11 of 11 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a Financial Ombudsman Service (FOS) recommendation. Due to the nature of the dispute, it has been referred directly for determination, in line with the Operational Guidelines to the FOS Terms of Reference. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered to be directly relevant to the outcome only. 3.2 Scope of determination Renewal of policy in October 2016 During the course of this dispute, the applicants have raised concerns about the renewal of their policy following its expiry on 26 October 2016. The applicants were initially concerned that the FSP had not provided the renewal documents. However, the FSP subsequently sent the renewal documents and advised that this had been done in accordance with its standard procedures. Under the FOS Terms of Reference, FOS has the ability to consider disputes about policy renewal in limited circumstances only. Based on the available information, I am not satisfied that the applicants have established that the FSP has acted inappropriately in the context of the policy renewal.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.