Home / Financial Firm (Unknown - Insurer) / Determination 438556

Determination 438556

Storm damage cash settlement offers and faulty prior repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$16,506
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants disputed the FSP's cash settlement offers for a 2007 storm claim (faulty repairs) and an October 2015 storm claim. AFCA ordered $3,006 for the first claim and $13,500 plus s57 interest for the second, and rejected the balance of both claims.

Cash settlement must be fair; the FSP must pay for damage it accepted and for faulty prior repairs under the lifetime guarantee, but other damage (termites, movement, stormwater, mould) was excluded or not caused by insured events.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 438556 Determination Page 1 of 5 Case number: 438556 2 May 2017 1 Overview 1.1 Dispute This dispute arises from claims lodged on the applicants ’ home and contents policy held with the financial services provider (FSP) for storm related damage in December 2007 (first claim) and October 2015 (second claim). In November 2015, the applicants claim they noticed damage as a result of faulty repairs performed by the FSP following the claim in December 2007. The FSP made a limited cash settlement offer with respect to this claim that has been rejected by the applicants (first claim). The applicants lodged the second claim in October 2015 following a storm. The FSP accepted liability and offered a cash settlement for the storm related damage. The applicants dispute the settlement on the grounds that it does not cover all of the damage sustained (second claim). 1.2 Issues and key findings Is the FSP’s settlement offer for the first claim fair in all the circumstances? The panel is satisfied that in addition to the offer of $506 to repaint the ceiling the FSP should also pay the sum of $2,500 to cover the reasonable costs of repainting the lounge room and dining room window frame. The FSP is entitled to deny liability for the balance of the damage claimed as a result of the first claim. Is the FSP’s offer to cash settle the second claim fair in all the circumstances? The panel determines that the FSP pay the applicants $13,500 as set out in Section 2.2 of this determination. The FSP is otherwise entitled to deny liability for the balance of the second claim. 1.3 Determination This determination is partially in favour of the applicants. The FSP is to pay the applicants $3,006 with respect to the first claim. The FSP is to pay the applicants $13,500 with respect to the second claim plus interest under Section 57 of the Insurance Contracts Act from 17 May 2016 to date of payment of the claim. The FSP is otherwise entitled to deny liability with respect to the arising balance of the applicants’ claims arising from the first and second claims. Case No: 438556 Determination Page 2 of 5 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexities involved in this dispute it has been referred to a panel for determination. The panel has had access to all of the information exchanged and has based this determination on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP’s offer to cash settle the first claim fair in the circumstances? The panel is of the view that the FSP’s offer to cash settle the first claim of $506 is not fair in the circumstances as it does not cover all of the relevant additional damage. The panel accepts however that the majority of the damage claimed by the applicants as a result from the first incident is not covered under the terms of the policy. Circumstances of loss There is no dispute that the applicants’ property was damaged in 2007. The applicants’ policy at the time provided cov er for a number of insured events subject to general exclusions contained within the policy. The FSP accepted liability for the storm related damage in that time. In November 2015 the applicants advised the FSP that they had noticed mould and damage which they thought to be related to this earlier claim. They had not explained why this had not been raised earlier with the FSP. The FSP determined to offer the applicants $506 settlement for damage to the lounge room ceiling but otherwise declined the balance of the damage. Assessor ’ s report The FSP arranged for the further damage to be assessed by its assessor AC. AC identified ongoing issues with the applicants’ property namely:  lounge room ceiling  window not closing properly  termite damage  movement/cracking  mould Further assessments were arranged with a mould remediation specialist and a plumbing company ALD. Case No: 438556 Determination Page 3 of 5 Damage to stormwater pipes not due to insured event The panel accepts the report from ALD that whilst there was a number of faults identified to the stormwater line which required repair by a plumber, these were not related to an insured event under the policy in 2007 or related to the storm event in December 2007. The applicants have offered no report to dispute the findings contained in the ALD report. Mould damage not due to insured event The panel accepts the finding of the mould remediation specialist EHS to the effect that there was no visible mould growth to the rear living room and the property was still in normal fungal ecology. Again the applicants have provided no further information to dispute these findings. The panel accepts that any mould damage identified was not related to any faulty repairs from the December 2007 incident. Termite damage unrelated to an insured event The applicants admit that they first noticed termites approximately two years prior to the most recent inspections of the property. They had contacted a local pest contractor who notified them that the wall was affected by termites. The panel notes the findings by the FSP’s engineer MCS that the absence of weep holes at the property will result in a moisture and humid environment within the wall cavity for termites. The panel accepts the comments by the FSP. There is no evidence to suggest that any faulty repairs or that the December 2007 storm had either caused or exacerbated the termite activity. In the circumstances, the panel accepts the FSP is entitled to rely upon the exclusion contained within the policy for loss or damage caused by insects, vermin, and rodents including termites. Movement of the property not due to an insured event The panel accepts that most likely any ground movement at the applicants’ prop erty was caused not as a result of the December 2007 storm but as a result of ongoing ground movement related to seasonal fluctuation in the ground moisture content over a period of time. The FSP had engineers investigate the drainage and water ingress into the property who formed the view that the damage had not been caused by water ingress. The FSP also engaged engineers MCS in relation to the sinking of the home and damage to the window in the lounge room with the window not functioning properly. MCS identified the external ground surface levels allowed water to flow towards and under the home weakening the underlying soils. MCS also identified deficiencies and leaks within the storm water drainage system. Case No: 438556 Determination Page 4 of 5 MCS did not consider the movement and damage to the home or damage to the window to be associated with the storm event. The panel accepts that the damage is not related to the December 2007 storm event or in fact the most recent event in October 2015. FSP is liable for further damage to the lounge room and dining room The panel does not accept that the FSP has properly settled the applicants ’ claim for the repairs, as it appears that the work performed to the front lounge room and dining room in 2007 may have been either incomplete or faulty. The FSP has provided no comment on whether these works were adequately completed. It has provided no comment as to the quality of the previous repairs. The panel notes these issues were first raised by the applicants in January 2016 and largely relate to the painting of the front lounge room walls and the repainting of the dining room window frames. The panel notes insofar as the applicants believe the repair of the skirting in the dining room which had been painted over required rectification that these repairs are covered in the scope of works for the second claim. In the panel’s view it is fair that a further allowance of $2,500 be paid to the applicants to cover these additional costs. In the circumstances the FSP is entitled to cash settle the applicants ’ claim for the additional 2007 damage for $3,006. 2.2 Is the FSP’s settlement of the second claim fair and reasonable? The FSP accepted liability for the damage sustained as a result of the October 2015 storm, obtained a scope of works and offered settlement of $9,878.20. In the panel ’ s view the offer does not cover all the damage or allow for likely additional cost being incurred. Circumstances of October 2015 claim The applicants say there are cracks and paint bubbling in the house and water trapped within the walls even up to seven months after the incident. Photographs of paint bubbling and cracks and a rotting door frame have been supplied. The panel notes the FSP’s scope of works includes repair of the walls in the lounge room, dining room and kitchen door frame which appear to match the damage see n in the applicants ’ photographs. No further evidence has been provided by the applicants to challenge this or clarify this aspect of the claim. The applicants rely on a report from JPF that there is storm damage which they claim as causing the damage resulting in cracks and water in the walls. The panel notes that the FSP obtained a report from RX who did a moisture survey of the front area of the house and found it seemed to be within the dry standard ranges. Case No: 438556 Determination Page 5 of 5 Two other engineers WPS and MCS, consulted by the FSP also considered cracking and movement damage overall had been caused by differential ground movement over an extended period of time and not by water ingress. Whilst the panel accepts that WPS’s report do es not fully explain why it reaches this conclusion the findings are supported by MCS. MCS considered that due to building issues including the slope of land and the accumulation of water over the years this had caused gradual soil movement. MCS did not co nsider the damage due to a single or two storm events. The panel further notes that in JPF’s last report it noted there was structural cracking and previous termite infestation which would be involved in movement of the property. The panel is satisfied based on the information exchanged that the proximate cause of the ongoing movement was most likely soil movement associated with faulty design/workmanship of the house including the perimeter concrete. Although the applicants have raised concern about the reports, they have not provided any information to substantiate the issues that they dispute. Cash settlement for second claim does not cover all damage T he FSP’s offer of $9,878.20 is limited to the scope of works for the second claim. In the information exchanged there is a quote provided by JPF for $1,960 for the replacement of concrete tiles in the area by the entrance. JPF reported that the amount of water from the storm may have been able to enter via weep holes to the front façade and cause movement. In the absence of any information to dispute this, the panel determines that the FSP add to any cash settlement, damage to the tiles assessed by JPF at $1,960.75. T he FSP’s policy provides a lifetime guarantee for repairs. By cash settling the claim the FSP is able to avoid any ongoing liability or the risks associated with incurring additional costs during the repair process. The panel believes given the nature of the damage that it is fair that a further allowance be made for these risks. The panel considers an allowance of close to 15% is appropriate to cover the risks. Accordingly, the panel determines the FSP pay the applicants $13 ,500 in settlement of the claim for damage arising from the October 2015 event. The panel is otherwise satisfied that the FSP is entitled to deny liability to the balance of the damage claimed by the applicants.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.