Home / Financial Firm (Unknown - Insurer) / Determination 438035

Determination 438035

Extent of liability for additional water damage and termite damage after faulty repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2017-05-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$149,032
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant sought cash settlement of additional water, roof and termite damage after the FSP's repairs. AFCA found the FSP liable for the additional bathroom, lobby, termite and roof damage and ordered cash settlement, with roof costs reduced to 50 per cent, plus temporary accommodation and $3,000 non-financial loss.

Faulty repairs by the FSP's repairer interfered with termite baiting and caused additional damage, but causation for roof and fence damage was uncertain and only partly attributed to the FSP.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 438035 Determination Page 1 of 8 Case number: 438035 5 May 2017 1 Overview 1.1 Dispute The applicant’s claim is an insured events Home Policy held with the financial services provider (FSP), for water damage sustained to the property on or about 16 February 2016. Dispute arose as to liability and the extent of damage. This was subject to a Determination and Supplementary Determination 376006. Copies of the Determinations are attached. The supplementary determination acknowled ges that the FSP’s engineer had identified the potential for further issues to arise and for new damage to be identified. For this reason the determination required that the engineer PP re-attend the property once the applicant had started repairs and if further damage was discovered then liability could reconsidered. In February 2016, the applicant started to remove the bathroom floor following which pipework and other areas were exposed. Further damage was identified by PP. The parties are now in dispute as to the extent of the additional damage identified. 1.2 Issues and key findings Is the FSP liable to meet the costs of the additional damage identified? The FSP is liable to meet the cost of the additional damage identified as damage related to the initial claim from February 2013 and damage sustained as a result of the inadequate repairs/faulty workmanship of the FSP’s initial repairer. What is the extent of the FSP’s liability ? The FSP’s liability for the additional damage and the extent of the additional damage is set out in paragraph 2.2 of this determination. Is the FSP entitled to cash settle the balance of the applicant’s claim? The FSP is entitled to cash settle the balance of the applicant’s claim as the applicant has clearly expressed a desire to ha ve the matter cash settled. 1.3 Determination This determination is in favour of the applicant. The FSP is to cash settle the applicant the sum of $152,032 in final settlement of the FSP liability. In addition the FSP is to meet the costs of temporary accommodation for a period of up to 12 weeks as per section 2.2 of this determination. Case No: 438035 Determination Page 2 of 8 2 Reasons for determination There has been a full exchange of material in addition to the information already provided in Determination 376006 and the supplementary determination. Each party has had the opportunity of addressing the issues that arise from the information exchanged. In addition, I had the opportunity of conducting a site inspection of the insured property on 11 April 2017. Both parties were present as was the applicant’s representative JM and the FSP’s engineer PP. Discussions were held during the course of the site inspection as to the possible costs of repairs with a quotation from CRA used as the basis of these discussions. The applicant had not provided a separate quotation for the additional damage. This determination follows consideration of all of the information provided and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP entitled to meet the costs of the additional repairs? I am satisfied based on the available information that the FSP is liable to meet the cost of additional repairs relating to the damage from February 2013 event and the faulty workmanship/repairs completed by the FSP. FSP is liable for the additional damage As required under the supplementary determination, the applicant commenced demolition of the bathroom in or about February 2016. Once the area was exposed PP attended and made the following observations:  work performed in 2013 did not comply with the relevant requirements for wet area construction  damaged flanges in the shower and main floor water pipe did not sit into the drainage riser, meaning water collecting on the water proofing membrane could not drain  water proofing membrane could not operate as intended  jack hammering created damage to the lead riser causing holes and fragments to fall into the trap  the soil around the main bathroom floor trap was moist (I note this is approximately three years after the claim was first reported)  water would back up in the bath and overflow on to the shower and bath waste gates. PP concluded that most likely water was leaking for over two years and that the applicant could not reasonably have been aware that the bathroom floor waste riser had been damaged. Case No: 438035 Determination Page 3 of 8 PP also identified other issues as follows:  roof sagging – unrelated to either the repair or ongoing leakage issues in the bathroom. The applicant disputes this.  exterior cracking – consistent with either settlement movement with reactive clay soil due to seasonal/environmental damage not influenced by the leakage. The applicant disputes this.  some internal cracking consistent with slight upward heave around the bathroom area that could be attributed to the leakage  slate tile flooring in lobby between kitchen and laundry and immediately outside the bathroom. Most likely due to ground movement possibly due to leakage  damp affected wall from the bathroom side of the laundry door close to the leaking bathroom. Termite damage contributed to by FSP repair process The applicant ’ s representative and builder JM commented on 4 April 2016 that in addition to the damage identified, there was damage caused by the termite path to the bait station being blocked by the activities of the FSP’s repairer and the moist conditions allowing the termites to thrive. A pest services specialist CPS reported that it would have been advantageous prior to starting work in the bathroom in 2013 to have allowed the baiting program to be completed. He confirmed that if the waste pipe was leaking , this would have increased the termite activity after termite treatment had been done. In an earlier report from FMG in October 2013 identified that the termite damage was limited to front dining floor frame. Termite damage was observed during the site inspection in April 2017 as affecting all areas throughout the house including dining room, lounge room and what was a third bedroom. I accept when the termite damage was first noticed, the FSP should have allowed for the baiting programme to be completed before seeking to complete repairs. I am satisfied the faulty repairs have interfered with the baiting program and directly led to an increase in termite activity. Whilst I accept that some termite activity had occurred prior to and unrelated to the repairs, I am satisfied that the FSP is liable to rectify the damage caused by the increased termite activity. I am satisfied based on the information provided that the FSP is liable to meet the cost of the additional repairs required as a result of the initial damage and faulty repairs. 2.2 What is the extent of the FSP’s liability? The FSP arranged for PP to provide a detailed scope of works on 11 August 2016. The scope of works have been provided to both parties. As it is detailed, I do not propose repeating it in the body of this determination. This quotation was used as part of the discussions held with the parties on 11 April 2017. I propose for the purpose of this determination I to look at each area quoted to determine the extent of the FSP is liability. Case No: 438035 Determination Page 4 of 8 Bathroom PP identified a total of 10 items. The parties agreed that the items were appropriate. JM advised that there was a further $1,400 involved in the provision of tiles and to do the relevant tiling work. Additional damage was identified to the roof of the bathroom which was most likely related to footing movement or at least contributed to by the footing movement and associated with the saturation of the soil due to leaking pipes. It was estimated that the likely cost to repair this damage including tying the bricks into the wall and the ceiling being reinstated would be $4,500. Allowing for the items as quoted by CRA plus an allowance of $5 ,400 for the items identified at the site inspection I assess the cost of repairs at $19,000 plus GST. I am satisfied that the FSP is liable to pay the applicant the sum of $20,900 inclusive of GST with respect to the additional damage to the bathroom. Entrance/Passage area Inspection of the area revealed there is a separation of the architrave and the wall from the original repairs but no new cracking. I accept it is likely that the original repairs were poorly completed. The quotation also does not allow for the fact that the entrance cupboard and hallway cupboards may not be salvageable. It was agreed between the parties that the cupboards will not be salvageable. In the circumstances, based on the quotation an additional $3,000 should be allowed for this. The scope of works allowed $1,100 plus GST to repair and paint all the wall surfaces in the entrance and passage area. I am satisfied it is fair in the circumstances that the FSP pay the applicant $5,000 inclusive of GST for the cost of repairing the passage/entrance including the cost of supplying and installing new entrance and hallway cupboards. Lobby/extension slate flooring It was apparent from viewing the slate flooring that the concrete slab has lifted at the expansion or movement joint in the concrete slab. PP advised that this can occur with differential movement and was adamant that he could not guarantee repairs to the slab would fix the problem. JM suggested a number of options to repair this area. The possible methods of repair were discussed. JM suggested that the estimated cost to replace the tiles and repair the slab either by putting in a step at the expansion joint or some other method was approximately $10,000. It was agreed that $10,000 would apply to the existing quote of $3,350 as provided by CRA. I am satisfied in the circumstances that the FSP should pay the applicant the sum of $15,000 inclusi ve of GST to cover the cost of repairs to the lobby/extension flooring including repairs to the concrete slabs and the slate tiling. Case No: 438035 Determination Page 5 of 8 Termite damage As indicated, I am satisfied that the failure to adequately repair the property resulting in the ongoing saturation of the soils from the bathroom and surrounding areas has most likely caused increased termite activity in the property. I do not accept that all of the termite damage is necessarily related to the damage extending from February 2013. I do not accept that the termite damage claimed to the front fence can be attributed to the internal damage. I accept however that there has been an ongoing termite activity that has caused further significant damage to the applicant’s property for which the FSP is liable. The quotation provided by CRA provided for various repairs to the following rooms:  Kitchen  Bedroom 1  Bedroom 2  Lounge  Entrance/passage. I accept that most of these areas had some degree of pre-existing termite damage but it was not significant. I accept that the termite damage is now significant and requires significant work. CRA quoted $44,800 plus GST to complete the repairs. The quote does not include the dining room which has also suffered damage and would also need to be replaced. It was agreed the additional costs for the dining room will be approximately $4,000. The quote also does not allow for possible damage that might occur in particular in the kitchen area should it be necessary to remove cupboards and benchtops. There is also concern about the risks associated with the damage to the joists that at this stage has not been identified. It was suggested an amount of $10,000 be placed on this damage. This would bring the total cost allowing $4,000 for the dining room and $10,000 for the additional risks up to $58,800 plus GST. In addition, an allowance of $3,800 should be made to cover the costs to prepare and paint the damaged areas. A further allowance should be made for the built in robe in bedroom 1 of $3,000 as per the quotation and an allowance of $2,600 for clean-up. This would bring the total costs associated with the termite repair to $68,200 plus GST. It is fair to deduct from this amount the likely a cost to repair the pre-existing damage. In the absence of any accurate quotation, I consider it fair in the circumstances to reduce the total amount by $10,000 bringing the cost to repair the termite damage plus painting plus replacement of the built in robe and clean-up to $65,020 inclusive of GST. Roofing A major issue between the parties is damage caused by the separation of the roof rafters above the bathroom. PP is of the view that the rafter separation has been caused by movement of the minor ridge section above bedroom 1 which in turn has Case No: 438035 Determination Page 6 of 8 been caused by seasonal or environmental influences on foundation soil moisture beneath the bedroom’s eastern wall. PP did not consider this movement was caused by movement of the bathroom walls. In any event, PP considered that the repairs could be completed by:  removal of the tiles in the scotch valley  replacement of the tile battens as required to properly align the tile coursing  reinstatement of the roof tiles and repointing the ridge capping. JM says that the seasonal movement explanation does not match the house wall/window movement and noted the western footing movement in the bathroom and lobby had already been accepted. JM provided a series of photographs of the property and duri ng the site inspection demonstrated how the window and level of the bottom wall section is plumb. JM says that the separation of the rafters is largely caused by heaving of the soil due to the leaking pipes with the soil subsequently drying out. PP disputes that there is evidence of heaving movement but believes the damage is more likely to be due to construction methods and old fixing material giving way. There are google photographs from 2009 suggesting the roof had already bowed prior to the 2013 event. JM says these are not reliable as there is evidence of finger prints and they have possibly been distorted. It is difficult with the existing information to determine the exact cause of the roof damage. Even if I accept that the damage is due to a combination of soil movement and construction methods, it is likely that the influence of the leaking pipes over a period of at least three years would have contributed in some way to this damage. Pre-existing movement at the property I note from the site inspection that there is an open down pipe draining into a drain at the corner of the front bed room of the house which visually appears to have dropped but by use of a plumbline it appears not to have dropped. There are a number of cracks in the cement render at the front of the house and through the bricks but both parties agree these are cosmetic and unrelated to the issues. There is evidence around the side of the house of more substantial cracking in the render that has required repairs over the years. Whilst the applicant denies completing these repairs, I am satisfied that the house has been moving for some time, most likely due to the reactive nature of the soil in the area. This however does not mean that the issues with the roof have not been caused or substantially contributed to by the saturation of the soil as a result of the leaking pipes. The FSP was asked to obtain a quotation from CRA based on the scope of works proposed by JM to repair the roof and consequential damage. Case No: 438035 Determination Page 7 of 8 Cost of roof repairs including side fencing, side bins, roof tarpaulin and electrical work and make safe came to a total of $72,930 inclusive of GST. Given the uncertainty as to the exact cause of the separation of the rafters and consequential damage I am of the view that to allow 50% towards the cost of repair of the roof is fair and reasonable. Liability for damage to laundry limited The quotation also includes repairs to the lobby laundry area and rear extension slab-area. The rear extension slab-area has already been allowed for in the repairs to the lobby extension slate flooring. I am not satisfied that any further allowance should be made to the rear extension slab area. The laundry area would only require repairs should it be necessary to put a step into the concrete slab in the lobby/extension area. I am not satisfied by the information exchanged that there is any evidence of damage to the laundry cupboards, or that a new toilet or sink are required. I am also satisfied following the site inspection of damage to the tiling around the sink area which is unrelated to the damage arising from the leaking pipe or the poor quality repairs. I accept it is possible for the laundry cupboards on the wall facing the bathroom have been damaged and accept in these circumstances $3,000 is appropriate. Fifty percent of the cost to repair the roof on my calculations would be $36,465. Allowing a further $3,000 for the laundry and, allowing for contingencies, I am satisfied it is fair to allow a total of $43,111.50 inclusive of GST for the roof repairs and repair to the laundry. FSP not liable for damage to front fence. The quotation also makes an allowance for the removal and replacement of the front fence. I am not satisfied there is any information to suggest that the front fence has been damaged as a result of the leaking bathroom pipes or the poor repairs by the FSP. Temporary accommodation It is apparent from the reports that during the repair of the termite damage, bathroom and roof the property should not be occupied. I am satisfied that the applicants are entitled to an allowance for temporary accommodation. Any accommodation should allow for off street parking and storage of contents including his classic car. I am satisfied an allowance of up to 12 weeks is appropriate. The FSP can either cash settle the applicant for this based on a fair market rent or arrange the rental accommodation for the applicants. Non-financial loss The Service can award up to $3,000 for non-financial loss in circumstances where an applicant experiences an unusual degree of time taken or delay in the resolution of a claim. Case No: 438035 Determination Page 8 of 8 I am satisfied in this case given that the initial repairs occurred in 2013 and have resulted in continual and ongoing issues for the applicant, and it is fair in the circumstances to allow the maximum of $3,000 for non-financial loss. Conclusion Accordingly based on the above calculation I am satisfied that the FSP is liable to cash settle the applicant’s claim for the balance of the damage sustained for a total sum of $152,032. As this calculation is based on current assessments, no interest is payable on that amount. In addition the FSP is liable for up to 12 weeks temporary accommodation costs based on a fair rent calculation as set out in the determination. Supplementary Determination Case No: 376006 Supplementary Determination Page 1 of 3 Case number : 376006 12 January 2016 Overview Dispute This disputes arises from damage to the Applicant’s home. The dispute has been the subject of a Determination that was partially in favour of the Applicant. The Determination required the Financial Services Provider (FSP) to assess and complete works to the house, particularly the bathroom of the house. Both the Applicant and the FSP accepted the Determination. Issues and key findings Did the FSP comply with the Determination? Yes. The FSP commissioned an expert report on the scope of works required to complete the work on the Applicant’s house in accordance with the Determination. Was the FSP’s offer to "cash settle" the claim reasonable? Yes. The FSP and the Applicant agreed to "cash settle" the claim after discussions about which tradesman should complete the work on the bathroom. Was the FSP's offer of settlement fair and reasonable? The FSP's offer of settlement for repairs was reasonable based on the information available, but additional payment may be required upon inspection of the bathroom and expert assessment. Supplementary Determination The Applicant is to: a) commence the work directed in the Determination on the basis of the FSP’s offer of settlement for repairs , and b) allow the bathroom to be inspected by Mountford Prider to assess whether any further work is required for which the FSP should be liable. Case No: 376006 Supplementary Determination Page 2 of 3 Reasons for Determination Did the FSP comply with the Determination? The FSP commissioned an expert report into the scope of works required to complete the work to the the Applicant's bathroom. The report was detailed and met the requirements of the Determination. It was provided to the Applicant for her consideration and comment. I am satisfied with its conclusions and recommendations. Was the FSP’s offer to “cash settle” the claim reasonable? I am satisfied that after discussions between the Applicant and the FSP, the Applicant did not want the FSP to appoint a tradesman to complete the work on the bathroom. Accordingly, it was agreed between the parties that the FSP could "cash settle" the claim. I am satisfied that the offer to "cash settle" was reasonable in the circumstances. Was the FSP’s offer of settlement fair and reasonable? The FSP's offer of settlement was for $19,800 plus $3,300, a total of $23,100. The Applicant accepted the offer, subject to the condition that the FSP would be liable for the cost of any additional work found to be required to be done during the completion of the work on the bathroom. The FSP did not agree with this condition as part of the settlement. I have considered the expert report and the parties' submissions, both prior and subsequent to its production. The evidence indicates that this is not a straight - forward claim and there are a number of uncertainties in respect to the completion of the repairs to the bathroom. Despite the submissions by the Applicant, I am satisfied there are no grounds for FOS to reopen the dispute in respect to any other issues outside of the Determination, as requested by the Applicant, on the basis of the insufficiency of the FSP’s IDR process or any other reason. There is always an element of estimation in the assessment of the cost of repairs and additional works can arise. I note that the FSP, at one juncture said: “ Given the potential issue relating to construction and potentially unrelated to the tap leakage, we suggest that as the bathroom works are being undertaken. Mountford Piper be instructed to reattend to review this issue once the area is exposed to provide a further report. We reject that the Applicants are entitled to any further compensation. Should any further issue be discovered at the time that the bathroom area is exposed, then these issue can be reconsidered. Case No: 376006 Supplementary Determination Page 3 of 3 Further, the Applicants have not provided any supporting evidence at this stage to substantiate any of the submissions or quantification of the losses. ” [sic] I am satisfied that the FSP's offer of settlement was reasonable based on existing information, but find that an additional payment may need to be made should further works be required after the bathroom area is exposed. This can be negotiated between the parties after an inspection by Mountford Prider or referred to FOS for decision. Supplementary Determination I accordingly direct the Applicant to: a) commence the work directed in the Determination on the basis of the FSP’s offer of settlemen for repairs, and b) allow the bathroom to be inspected by Mountford Prider to assess whether any further work is required for which the FSP should be liable. Determination Case No: 376006 Determination Page 1 of 9 Case number : 376006 5 May 2015 1 Overview 1.1 Dispute On 11 April 2013, the Applicant lodged a claim with the Financial Services Provider (FSP) for water damage sustained to the property as a result of a leaking tap in the bathroom in February 2013. The FSP accepted the Applicant’s claim and chose to repair the damage. The Applicant remains unhappy with the repairs and believes the FSP’s repairer’s actions had resulted in termites spreading to other sections of the property. 1.2 Issues and key findings Has the FSP settled the claim as per the terms of the policy? The FSP has not settled the claim in accordance with the terms of the policy because:  the repairs to the bathroom have not been completed  there is lack of evidence the repairs conducted were successful  the FSP is obliged to bring the property to its pre-loss condition  the FSP is obliged to assess the condition of the bathroom and organise necessary repairs if further issues are identified with the standard of repairs and waterproofing. Is the FSP responsible for the spreading of termites to other sections of the property? The Applicant has not shown the FSP’s repairer’s actions r esulted in the infestation and spreading of termites to other sections of the property. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP:  Must organise repairs to the bathroom to bring it back to its pre-loss condition excluding the repair/replacement of the door frame.  Must assess and attend to any issues relating to repairs and waterproofing completed by its appointed repairer.  Is not obliged to pay for any expenses relating to monitoring and eradicating termites. Case No: 376006 Determination Page 2 of 9 2 Reasons for Determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. I have taken into account all the material submitted by the parties. There has been a full exchange of all documents relied on to make this Determination and each party has had the opportunity to address any issues raised by the other. This dispute has not been the subject of a FOS Recommendation. Due to its nature, it was appropriate to proceed directly to a Determination in line with the Operational Guidelines to the FOS Terms of Reference. 2.1 Has the FSP settled the claim as per the terms of the policy? Applicant established a valid claim under the policy The Applicant is first required to show, on the balance of probabilities, she has suffered a loss caused by an insured risk. This is called a prima facie claim. There is no dispute among the parties the Applicant has shown the damage was caused by an insured event, ie the bathroom and adjacent sections of the property were damaged by water leaking/discharging from the taps/pipes. The Applicant has therefore established a prima facie claim under the policy. Repairs to the bathroom remain incomplete Both the FSP and the Applicant have presented evidence which confirms the repairs to the bathroom were not completed by the FSP’s appointed repairers. The FSP says the Applicant had failed to supply its repairer with a new vanity unit for replacement. Based on the evidence, it appears the repairs were not completed because of the issues raised by the Applicant about the standard of repairs (waterproofing) and spread of termites to other sections of the property. The FSP initially indicated the Applicant was cash settled for the o utstanding repairs. However, upon further investigation into this matter with the loss assessor, it has confirmed no cash settlement was made to the Applicant for the remaining repairs. I am therefore satisfied the repairs remain incomplete. There is lack of evidence the repairs conducted were successful The Applicant says the initial repairs conducted by the FSP’s repairer were not in line with the building standards. After she brought this to the FSP’s notice, further repair works were approved and conducted. Case No: 376006 Determination Page 3 of 9 The Applicant remains unhappy with the method of waterproofing followed by the FSP’s repairer. A video clip of the bathroom taken on a day whilst the FSP’s repairer had completed some of the waterproofing works in the bathroom and before completing the final waterproofing revealed the presence of termites and damp surfaces. The Applicant argues the FSP has failed to establish its repairer used the appropriate product and method of waterproofing required for damp surfaces. The FSP contacted the produc t manufacturer about this issue and the FSP’s file notes indicate the manufacturer confirmed a specific product (A300) was required if waterproofing was applied on damp surfaces. The FSP’s repairer says the area he worked on was dry at the time he complete d the remaining waterproofing of the surfaces. He also says he did not witness any termites on the surface at that time. The termite tracks would have been cleared before the waterproofing was applied. The FSP does not believe there is any issue with the repairs completed by its repairer because the Applicant has failed to show any problems with the bathroom since completion of repairs and waterproofing. The Applicant has repeatedly informed the FSP that the subject bathroom has not been used for many months since repairs because the repairs were never completed by the FSP. The FSP has not conducted any further investigations to assess whether there were any issues with the repairs completed. It has also not provided evidence from its repairer confirming the type of product used for waterproofing. The colour of the waterproofing used by the repairer appears greyish-blue in the video clip presented by the Applicant. FSP is obliged to bring the property to its pre -loss condition The FSP is obliged to bring the bathroom to its pre-loss condition. Evidence presented by the parties shows the FSP is yet to complete the repairs. Considering the issues raised by the Applicant in relation to the method of waterproofing used by the FSP’s repairer, at the present time th ere is no concrete evidence to show whether or not:  at the time the FSP’s repairer completed the remaining waterproofing the surface was damp  the waterproofing product used by the FSP’s repairer was appropriate  the FSP’s repairs were completed to required building standards. This is because the Applicant has not had an opportunity to use the bathroom to identify issues, if any. The FSP says the waterproofing applied by its repairer comes with a 10 years warranty. Case No: 376006 Determination Page 4 of 9 Therefore, if issues with waterproofing are noticed once the Applicant starts using the bathroom, it is fair in the circumstances the FSP appoints an independent builder/expert to assess whether the issues relate to the initial waterproofing by its appointed repairer or due to some other cause. If the issues relate to the FSP’s repairer’s waterproofing method or repairs undertaken, the FSP is then obliged to conduct rectifications works to bring the bathroom back to its pre-loss condition. In relation to the outstanding repairs, the FSP is obliged to complete the remaining repair works to the bathroom. The Applicant should supply the FSP with the vanity and other accessories (items not damaged or related to the event which the Applicant wishes to have replaced with new) so that the FSP may complete its repair works within a reasonable time period. The FSP should also attend to the following:  silicone under window  no silicone against the door frame  no shower screen  shower taps are not siliconed through tile penetrations  no vanity or taps connected  repair cracked substrate by the bath tub. Considering the issues that may arise from the FSP’s repair works, it is recommended the FSP does not cash settle the Applicant for the remaining repairs. This would give both parties the opportunity to assess the standard of repair works by the FSP’s appointed repairer if any issues arise in the future. 2.2 Is the FSP responsible for the spreading of termites to other sections of the property? FSP was not responsible for the issue with termites at the property The Applicant holds the FSP responsible for delaying the termite eradication process and also contributing to spreading the termites to other sections of the property. The Applicant says, being aware of the presence of termites/tracks, the FSP has continued to waterproof and re- tile the sections of the bathroom. The FSP’s repairer’s actions blocked one of the pathways used by the termites to reach the bait station placed on the bathroom wooden window frame. This, in addition to the standard of waterproofing, resulted in the termites tracking to the bathroom door frame behind the waterproofing and also causing the spread of termites to other sections of the property because the waterproofing product had not bonded with the damp surfaces of the walls. The Applicant also says the termites entered via a crack next to the bathtub that was waterproofed and not repaired by the FSP. The Applicant is not satisfied the FSP had failed to recognise this wooden window frame in its various responses. Case No: 376006 Determination Page 5 of 9 The policy excludes cover for damage caused by insects and vermin. However, the Applicant may have some cover if it can be proven the FSP’s repairer’s actions caused further damage to the property, as alleged by the Applicant. The FSP says there is no evidence the repairs completed were not up to standard and that the termites tracked behind the waterproofing, as suggested by the Applicant. The repairer says the Applicant was aware of the termite issue and had also complained of issues with sewerage since they purchased the property. As such, it cannot be said the termites were intrudoced into the property as a result of the FSPs’ repairer’s actions. The termite map dated 14 May 2013 indicates baits were installed in the bathroom window frame and kitchen floor. As such, it is reasoanble to conclude the termites had entered the property well before the issues raised by the Applicant (video clip dated 23 May 2014) occurred. The termite inspector’s reference to bait locations in bathroom, kitchen and external areas are confusing because he uses the same numbers to point out different locations in the various reports. The Applicant holds the FSP responsible for not following her isntructions not to continue with the repairs. Noting the termite baits were installed by 14 May 2013, I am of the view the Applicant had ample time to request the repairer, loss assessor and the FSP to stop repairs until the termite eradication process was completed. There is no evidence this occurred and therefore I am inclined to believe the Applicant may have allowed the FSP to continue with the repair works. By July 2013, it was noted the termites had consumed less than 30% of the bait from the bait station at the bathroom window frame. Furthermore, in August 2013, no feeding was noted at the various bait stations. The termite inspector, however, noted other termites in floorboards. He does not state he found them in the bathroom. It is interesting to note by October 2013, the bait station in the bathroom still showed some termite activity. Considering the above, it cannot be concluded the FSP’s repairer’s actions totally blocked the pathway to the bait station on the bathroom window frame and diverted the termites to the bathroom door frame and other sections of the property. T he FSP’s engineer’s findings support the FSP’s position that the termites most likely attacked the timber flooring before reaching the bathroom door frame. The bathroom doorframe may have been infested by termites from other sections of the property because termite activity in the other bait stations varied after the FSP’s repairs to the bathroom were completed. Furthermore, termites were also found in trees, floorboards, etc. Case No: 376006 Determination Page 6 of 9 Based on the above, there is inadeuqate evidence to conclude the FSP’s repairer’ s actions contributed to the infestation or spreading of termites to other section of the property. As such, the FSP is not required to contribute to the cost of monitoring and eradicating the termites from the property. Case No: 376006 Determination Page 7 of 9 3 Supporting information 3.1 Applicant For ease of reference, the Applicant and her representative have been referred to as “Applicant”. 3.2 Time of line of events and white ant monitoring Date Activity 16/02/ 2013 Date of the loss. 11/04/ 2013 Applicant reported the loss to the FSP. 14/05/ 2013 Termite map of bait locations showing AG1 as bathroom window and AG2 as kitchen floor board. 11/07/ 2013 The Applicant says first inspection by pest control after completion of repairs by the FSP. Location 23 (AG1) and 24 (AG2) showed less than 30% bait co nsumed. No evidence of termites on ot her sites. There was no other evidence of terminates was found. 08/08/ 2013 No evidence of termites in the entire property including locations 23 & 24. Baits on these locations were abandoned with no feeding. However, t he inspector agreed he found ot her termites in building interior (Copt otermes species floorboards) 03/10/ 2013 Termite activity/evidence noted in locations 9 & 14 – less than 30% bait. Termite activity/evidence noted in locations 11, 12 & 13 – more than 60 % consumed. Locations 23 & 24 - less than 30% bait consumed 31/10/ 2013 Locations 10,12, less than 30% consumed, location 11 & 13 - light feeding less than 30% cons umed, 14 – termite activity/evidence located great er than 60% consumed. Location 23 & 24 l ess than 30% consumed. Other termite activity found in trees Coptotermes species. 05/12/ 2013 Location11, 12 & 14 less than 30% bait consumed. Locations 13 light feeding less than 30% consumed, 15 – termit e activity/evidence located (between 30 - 60% consume d, insufficient feeding in …). Locations 23 and 24 abandoned by termites Location 25 (next to tree in front yard) introduced – no evidence No other termite evidence found. 10/01/ 2014 Locations 11, 13 & 14 – less than 30% of bait consumed. Location 23 less than 30% consumed and Location 24 bathroom window - light feeding less than 30% consumed, Location 25 – No termites next to tree in front yard. No other termite evidence found. 07/02/ 2014 Locations 11, 12, 13 & 14 – abandoned by termites no feeding as Case No: 376006 Determination Page 8 of 9 Date Activity yet. Location 23 bat hroom window frame – light feeding, Location 24 kitchen floor abandoned by termites. Location 25 termite activity/evidence located bathroom doorframe (installed above ground termite bait matrix). Location 26 (no termite evidenc e). O ther termite evidence found building interior kitchen floorboards and half floorboards (Coptotermes species). 07/03/ 2014 Location – 11 less than 30% consumed, location 12 - no feeding 14 abandoned by termites 23 and 24 less than 30% bait consumed. Locatio n 25 - heavy feeding bet ween 30 - 60% consumed. No other termite evidence found. 02/05/ 2014 Locations 9, 12 & 14 – less than 30% bait consumed. Location 11 – between 30 - 60% bait consumed, Locations 23 & 24 – abandoned by termite. Location 25 (greater than 6 0% bait consumed – Applicant says this was the bathroom frame one as water proof failed. No other termite evidence found. 3.3 FSP’s engineer’s report dated 1/10/2013 “Whilst termites are attracted to dark and damp conditions, they are primarily attracted to timber. It is therefore the writer’s opinion that the termites first attacked the timber floor and then the door frame. They then proceeded upwards into the dwellings superstructure behind the detached shower wall tiles which an opportunistic and concealed pathway. Given that the water damage occurred before April 2013 it is extremely unlikely that termites have contributed to the detachment of tiles in the bathroom. The writer’s conversation with [Pest Control] prior to inspection determined that time scales for infestation are difficult to confirm.”(sic) 3.4 The FSP’s engineer’s email dated 18/02/2014 “As the bathroom had been tiled before my inspection I was unable to observe the tracks in question. However, I have had a conversation with [builder] regarding the termite tracks and compared his comments with the photographs provided prior to inspection. The photographs indicate the location of the tracks and that there were interstitial voids behind the tiles. This occurs because dabs of adhesive were applied to the back of the tile in the laying method and not spread evenly over the surface of the wall. These voids provide access routes for termites. When the tracks are removed from the wall a stain remains visible in the surface of the render. Given that the tracks are actually concealment 'tunnels', when the main body of the tunnel is removed there can be a residue of track material left behind as staining on the render surface. The waterproof membrane installed is a two coat system with a fibrous reinforcing membrane placed between coats. The first coat of liquid membrane is applied to bond the membrane to the render. This is followed by application of the fibre membrane and a second coat of liquid. Case No: 376006 Determination Page 9 of 9 It is the writer's opinion that the membrane would not be compromised by the minimal amount of residue or staining from the termite tracks. It would simply bridge over any such localised defect. Termites require a pathway between solid surfaces to enable them to construct their concealment tracks. Therefore, termites cannot get behind the bonded waterproofing membrane to use the old tracks or to track through the same area again. The termite tracks in this case had been constructed on the surface of the render, between the render and tiles. Termites do not tunnel through solid materials, or penetrate between intimately bonded surfaces.” 3.5 Email dated 5 February 2015 from the loss assessor “I have attached a copy of our complete file i.e. adjusters report and all attachments. As discussed, there appears to have been no discussion with the builder, myself or [AL] into the replacement of the vanity unit. The repairer was contacted by myself this afternoon, he advised that the vanity unit was removed by him to allow removal of wall and floor tiles. Vanity unit comprised of chipboard and was extensively worn due to age and wear and tear and in no way related to the water damage claim in the shower recess. It was agreed by the repairer with the Insd that he would not re install same, as the insd wished to replace with a new one when they could afford same. Costs to reinstall a replacement unit around $200.00 including plumbing as discussed. I trust the attached is of some assistance to you”