Home / Financial Firm (Unknown - Insurer) / Determination 437850

Determination 437850

Storm damage boundary fence claim settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2016-10-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$150
Amount claimed$3,733
SourceAFCA PDF

Summary

The applicant disputed a cash settlement for storm-damaged boundary fencing, seeking $3,732.70 for full replacement. AFCA accepted settlement for the 22 metres damaged and ordered $150 non-financial loss for delay in establishing the scope of damage.

The policy pays only costs that directly apply to the damaged part of the property, and previous claims or another insurer's assessment are not relevant to this claim.

Issues

Subjects and remedies

pay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 437850 Determination Page 1 of 5 Case number: 437850 7 October 2016 1 Overview 1.1 Dispute The applicant holds a home and contents insurance policy (Policy) with the financial services provider (FSP). The applicant lodged a claim for the replacement of a boundary fence that was damaged in a storm on 29 January 2016. The FSP settled the claim for the replacement of the damaged part of the fence only. The applicant disputes the settlement amount and maintains:  the FSP approved the replacement of the entire fence in previous claims in 2007 and 2010 even though only parts of the fence were damaged and  the FSP verbally confirmed it would pay $3,732.70 but later reduced this amount to $1423.00. 1.2 Issues and key findings Has the FSP calculated the settlement amount correctly? There is no dispute that only 22 meters of the total 48 meters of fence was damaged in the storm. I am satisfied the FSP is only liable to replace or pay the cost of replacing this portion of the fence with the same or similar materials. I am also satisfied that the quotation used to calculate the cash settlement is adequate. Under the Policy the FSP is only liable for the costs that directly apply to the part of the property that has suffered the loss or damage. Is the applicant entitled to any further compensation? I accept that the applicant was disappointed by the outcome of the claim. This is itself does not give rise to an award of compensation. However the assessment of the claim was delayed due to t he FSP‟s failure to establish the scope of the damage earlier in the claims process. 1.3 Determination This determination is substantially in favour of the FSP. The applicant is entitled to $150.00 in non-financial loss to be paid within 14 days of the applica nt‟s acceptance of this Determination. Case No: 437850 Determination Page 2 of 5 Case No: 437850 Determination Page 3 of 5 2 Reasons for determination 2.1 Has the FSP calculated the settlement amount correctly? Policy only covers costs that directly apply to the damaged part of the property The applicant lodged the claim for storm damage to a boundary fence on 1 February 2016. Before the storm, the 48 meters of fence consisted of 22 meters of „hardifence‟ and 26 meters of asbestos fencing. There is no dispute that only the 22 meters of „hardifence‟ was damaged by the storm. There is also no dispute that this portion of the fence required replacement as it could not be repaired. The Product Disclosure Statement (PDS) explains how claims are settled. When the FSP agrees to pay a claim for loss or damage it will pay: “only those costs that directly apply to the part of the property that has suffered the loss or damage.” The Policy does not provide cover for replacement of the undamaged part of fence for the purpose of matching. The applicant says that two previous claims were accepted by the FSP and the entire fence was replaced even though only parts of the fence were damaged. Further she says that the neighbour‟s insured has accepted the claim for the replacement of the entire fence. Previous claim assessments or the assessment of another i nsurer are not relevant to this claim. The FSP is entitled to apply the terms and conditions that are in force at the time that the claim arose. FSP must pay the cost for it to replace for same or similar fence construction During the claims process the applicant was asked to provide two quotes for the replacement of the fence. She provided quotations for 48 meters of „colourbond‟ fencing. Based on the information available, „colourbond‟ was recommended as the replacement material as it is cheaper than „hardifence‟. The FSP obtained a quote for 22 meters of „hardifence‟. It based the cash settlement amount on this quote. The PDS says the FSP will pay: “to match materials, items or construction with this that existed before the loss or damage occurred and where that is not possible, with the nearest similar materials, items or construction” The material and construction of „hardifence‟ is different to „colourbond‟. „ Hardifence ‟ does not require plinths. By providing the cost of replacing the damaged portion of the fence with the same material that existed before the damage occurred the FSP has settled the claim in accordance with the Policy. I accept that the quotation for $3,146.00 provided by the FSP represents the cost to it to replace 22 meters of „hardifence‟ including labour. As the fence is a boundary fence the applicant in entitled to 50% less the excess of $150.00. Case No: 437850 Determination Page 4 of 5 2.2 Is the applicant entitled to any further compensation? FOS may award compensation for non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. The applicant has raised a number of concerns about the manner in which the FSP handled her claim. Among other things, the applicant says the FSP:  failed to appoint an assessor when the claim was first lodged and  made a verbal agreement to pay $3,732.70 on the claim. Delays in claims handling process justify an award of compensation The applicants claim was lodged over the telephone. Due to the nature of the damage the FSP did not appoint an assessor but asked the applicant to provide quotes for the damage. The FSP received the first quote from the applicant on 9 February 2016. It then asked for further information from the quotation provided. This additional information was submitted on 1 March 2016 along with a second quote. On 7 March while processing the claim the FSP contacted the first quotation provider to confirm the condition and construction material of the damaged fence. During this conversation the FSP became aware that only approximately 22 meters of the 48 meters of fence quoted was damaged. On 9 March the FSP contacted the applicant to advise her that the payment had not been approved. On 10 March an assessor was appointed and attended the property on 11 March 2016. Based on the assessors report and the FSP‟s contractors quote the applicant was cash settled on 23 March 2016. The appointment of an assessor at the time the claim was lodged would have avoided any delay or confusion about the scope of damage covered under the policy. It was reasonable to expect the FSP to determine the scope of the damage at the start of the claims process. As such the applicant is entitled to $150.00 in non- financial loss. No compensation in respect of initial settlement amount The FSP acknowledges that it incorrectly calcula ted the claim before it was aware that on 22 meters of fence was damaged. This error was corrected within two days. Although I understand that the applicant is disappointed with the outcome of the claim, I am not satisfied that this error gives rise to a claim for compensation because:  it was corrected within two days and Case No: 437850 Determination Page 5 of 5  the FSP apologised to the applicant for the error. I accept the applicant made a verbal agreement with her contractor to replace the fence based on the FSP‟s original advice on 9 March 2016 that the claim would be settled for $3,732.70. However, there is no evidence that the work had commenced before 9 March 2016 or that the applicant had paid her contractor a deposit. In these circumstances I do not consider the applicant is entitled to any additional compensation for non-financial loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.