Claim declined for cost of fixing shower leak, including re-tiling and re-waterproofing
Text of the determination
Determination
Case No: 436178 Determination Page 1 of 5
Case number: 436178 28 June 2017
1 Overview
1.1 Dispute
The applicant made a claim under his home insurance policy (the policy) with the
financial services provider (FSP) after water leaked from an upstairs ensuite shower
area, damaging other parts of the home.
The FSP accepted the claim and agreed to cover the damage resulting from the leak,
which included water damage to plasterwork down stairs. The FSP declined to cover
the costs associated with repairing the leak itself, in reliance upon the policy wording .
The applicant says that he was misled into be lieving that the FSP would cover the
cost of new waterproofing and tiling (amounting to more than $20,000).
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the FSP required to cover the costs of re-tiling and re-waterproofing?
The policy provides cover for damage caused by exploratory investigations to detect
the source of a leak and damage caused by that leak, but not fixing the leak itself.
I am not satisfied that the leak itself or the exploratory investigations caused the
damage claimed to the waterproofing and tiles. Further, the available information
shows that the excavation work to remove tiles and disturb the waterproofing was
conducted after the source of the leak was identified, and so was not of an
exploratory nature.
Was the applicant misled?
The applicant has not established his claim that he was misled to his detriment by the
FSP, to believe that it would cover the cost of re-tiling and re-waterproofing. The
FSP is not required to cover these costs.
Case No: 436178 Determination Page 2 of 5
1.3 Determination
This determination is in favour of the FSP. The FSP does not need to take any
further action in relation to the claim.
Case No: 436178 Determination Page 3 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Is the FSP required to cover the costs of re-tiling and re-
waterproofing?
The policy does not cover the cost of fixing the leak
The policy provides cover for damage caused by a leak, but not for the repairs
necessary to fix the leak. The limits of the cover provided by the FSP in this regard,
are clearly set out on pages 22 and 30 of the product disclosure statement for the
policy. Page 22 of the PDS provides as follows:
“We will pay for the reasonable costs of locating, at the insured address, the source of
the escaped liquid and to repair and restore the damage caused by our exploratory
work, but only if the escape of liquid is covered under this insured event. If the leak is
not covered under this insured event, we provide some limited cover under additional
cover “Exploratory costs where a leak is not covered under insured event “Escape of
Liquid”” See page 30….
We will not cover….
The co st of repairing or replacing the item from which the liquid escaped…
Loss or damage to, or caused by, a leaking shower floor…”
Page 30 of the PDS provides that where a leak is not covered by the policy and
exploratory work have been undertaken by the FSP, the most that the FSP will pay in
rectification costs for that exploratory work is $1,000.
The leak was caused by defective installation of a flange and waterproofing
I am satisfied on balance of available information in this dispute, inclusive of the
appl icant‟s plumber‟s report, that the leak was caused by defective plumbing works
when the applicant‟s home was built, in installing the flange and waterproof
membrane.
On 9 February 2016, the FSP sent a registered domestic builder and a licensed
plumber to i nspect the damage at the applicant‟s home. The inspection report that
followed stated:
Case No: 436178 Determination Page 4 of 5
“In is my opinion that the leak control puddle flange has not been correctly installed and
it appears that the water proof tanking membrane has not been run into the puddle
flange which is causing the leak.”
At the time that this report was provided and the cause of the leak identified, the tiles
and screed in the shower had not been removed. It appears that such works were
not necessary for the FSP‟s contractor‟s non-invasive exploratory investigations to
diagnose the source of the leak.
The tiles and screed were not removed as part of exploratory works
Sometime after the FSP‟s contractors attended the applicant‟s home and before the
time that he arranged for his own plumber to attend two weeks later, the tiles and
screed were removed from the shower floor. It appears that these excavation works
were undertaken by the applicant or by his plumber at his direction.
At the time the tiles and screed were removed, the cause of the leak had already
been diagnosed and exploratory investigations completed by the FSP.
Consequently, the removal of the tiles and any related damage to the waterproofing,
cannot be construed as the FSP‟s „exploratory works‟ or works for which the FSP can
be held liable under the provisions of the PDS cited above (covering the indem nity for
damage caused in exploratory works).
I am satisfied on the basis of the available information in this dispute that the screed
and tiles were removed to permit the leak to be fixed, not for exploratory works
undertaken by the FSP. As noted above, the policy does not provide cover for fixing
the cause of a leak. Consequently, the FSP is not liable under the policy for the cost
of re-waterproofing and re- tiling the applicant‟s bathroom.
The FSP is entitled to deny the claim
The FSP is only liable to the applicant for the reasonable costs of rectifying any
damage caused by the FSP‟s exploratory works to detect the source of the leak that
resulted in damage to his property. I am satisfied that the FSP‟s exploratory work did
not result in any such damage, as its experts did not remove tiles and screed before
detecting the source of the leak. The policy does not cover the tile and waterproofing
replacement works. Those works relate to fixing the leak itself, not the damage
caused by the leak or damage c ause by the FSP‟s exploratory investigations.
2.3 Was the applicant misled?
The applicant has not established that he was misled to his detriment
The applicant says that irrespective of the interpretation of the PDS, he was misled
by the FSP‟s call centre staf f to believe that the FSP would cover the cost of
replacing the waterproof membrane and the tiles in the upstairs bathroom. The
estimated costs of these works exceeds $20,000. The applicant says that as a result
of his reliance upon the misleading representation of the call centre staff, excavation
works were conducted and he has now not been able to use the shower area for an
extended period of time.
Case No: 436178 Determination Page 5 of 5
The applicant has supplied call records of his interactions with the FSP‟s call centre
staff. I accept that the applicant formed the belief in the course of these
conversations with the FSP that cover would be provided by the FSP for the tiling
and waterproofing works. However, having listened to the tapes, I cannot find that he
was misled to his detriment by the FSP.
While at some points, in one conversation in particular, the FSP‟s call centre staff
member appears to agree with the applicant‟s statement that the FSP would cover
the waterproofing and tiling, in the same call the staff member says that the decision
about these things did not rest with the staff member and would need to be referred.
I note further, that at the time of the call in question, the screed and tiles had already
been removed from the shower area, so it cannot be said that the FSP‟s call centre
staff member misled the applicant to his detriment. In his post recommendation
submissions, the applicant says that there were other calls in which he was more
specifically misled. However, absent
more specific and corroborative information being supplied about these calls
the representations alleged, being shown to have been made before the
excavation works were done that resulted in the tiles and screed being
removed, and
evidence that the leak could have been fixed without removing the tiles
I cannot find that the applicant was misled by the FSP‟s call centre staff, and relied
upon such misleading statements to his detriment.
Even if he misunderstood FSP staff there is no evidence the applicant acted to
his detriment
I am satisfied that at the time of his conversations with the FSP, the applicant has
already removed the tiles and screed, and would have needed to remove them in any
event to fix the leak.
Consequently, on balance I am not satisfied that the applicant suffered detriment as
a result of his interactions with the FSP‟s call centre staff regarding his claim and
what would and would not be covered.
The FSP is entitled to deny the claim and need take no further action in respect of it.
Recommendation
Case No: 436178 Recommendation Page 1 of 5
Case number: 436178 23 September 2016
3 Overview
3.1 Dispute
The applicant lodged a claim for water damage to his two storey home on or about 9
February 2016. Water leaked from the shower area on the upper storey and caused
damage through areas of the home.
The financial services provider (FSP) reviewed the cause o f the loss and determined
the origin of the leak was the puddle control flange, which had not been adequately
water proofed when installed. The FSP agreed to cover the damage resulting from
the leak but not the costs to locate or repair it.
The applicant considers this unfair and says:
the policy provides cover for the location of the leak, or alternatively
he was informed by the FSP that it would indemnify him for locating the
damage.
3.2 Issues and key findings
Does the FSP’s policy provide cover to locate the leak?
The cover provided under the policy extends to the reasonable cost of locating a leak
but it was not necessary in this instance.
The source of the leak, being the puddle control flange, was identified by the parties
prior to the applicant‟s exca vation of this area.
Is the FSP otherwise obliged to cover the applicant?
There is no evidence the FSP gave a specific undertaking or promise to the applicant
to cover the costs for stripping the tiles and screed to uncover (and subsequently
repair) the source of the leak. There is no evidence the applicant was prejudiced as a
result of any representation made.
3.3 Recommendation
This recommendation is in favour of the FSP. It is not required to indemnify the
applicant for any further loss.
Case No: 436178 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Does the FSP’s policy provide cover to locate the leak ?
Onus on the applicant to establish an insured event
In order to claim under her policy, a common law onus rests with the applicant to
establish his loss was caused by an event covered under the terms of his policy. This
is known as establishing a prima facie claim.
Only after such an onus is discharged, is the FSP required to show why it should not
cover the loss.
The FSP‟s policy provides cover for a series of listed events, including l oss or
damage to the building caused by an escape of liquid. This includes liquid leaking,
overflowing or bursting from any drain, fixed pipes, baths, sinks, toilets and basins.
For the applicant‟s home, there is no dispute there was water damage caused by an
upstairs shower leak. I am satisfied the applicant has established an insured event.
FSP agreed to cover the resultant loss only
The FSP agreed to cover the resultant damage from the water leak but notes its
policy does not cover the repairs necessary for attending to the leak itself.
Upon inspecting the damage, plumber PB suggested the leak was caused through
the absence of adequate waterproofing for the leak control puddle flange, which had
not been installed correctly.
In order to fix the leak, it was necessary to remove tiles and screed surrounding the
area of the puddle control flange in the shower.
PB‟s report was made prior to excavation work being undertaken to view the
damage. The applicant says the excavation work was necessary to ascertain the
exact nature of the loss and the extent of it.
The FSP disagrees and considers there is no evidence these items were damaged
as a result of the leak and that “the tiling and waterproofing costs form part of the
work to rectify the source of the leak”.
There is no evidence the removed tilling or screed were damaged through the
“escape of liquid” event.
Policy provides cover for exploratory costs in some circumstances
The applicant suggests the costs to remove and replace the tiles should be covered
under “exploratory” costs.
The policy provides:
“ Exploratory costs
We will pay the reasonable cost of locating, at the insured address, the source of the escaped
liquid and to repair and restore the damage to the building caused by our exploratory work but
only if the escape of liquid is covered under this insured event.
Case No: 436178 Recommendation Page 3 of 5
The policy further notes that no cover applies for the cost of repairing or replacing the
item from which the liquid escaped.
No evidence the exploratory costs should be covered in this instance
On 9 February 2016, PB noted the leak control puddle flange had not been correctly
installed and the waterproof membrane did not extend into it.
The applicant arranged for his own plumber, RP, to inspect. RP agreed in a report of
23 February 2016 there was a problem with the leak control puddle flange and it
needed to be replaced.
At the time of his inspection, RP noted the tiles and screed had already been
removed.
Essentially, the two reports independently confirmed the source of the loss – the leak
control puddle flange was not adequately waterproofed.
PB made its determination as to the cause of the loss on 9 February 2016. Whilst the
subsequent excavation of tiles (sometime prior to 23 February 2016) confirmed the
cause of the loss, I am not satisfied it was necessary for the purposes of the claim. It
was already known where the leak originated from.
I accept the applicant had to undertake this excavation to attend to the puddle flange
problem but I do not consider this to be part of any “exploratory costs”. I am satisfied
the cause of the loss was already known and the purpose of the work was to attend
to fixing the leak itself.
The nature of the loss meant the applicant had to excavate around the leak control
puddle flange to fix it anyway and the costs of this are not covered under the policy.
4.2 Is the FSP otherwise obliged to cover the applicant ?
Applicant says he was told he would be covered
The applicant says that in telephone conversations with the FSP‟s staff, he was
informed the excavation costs would be covered.
To the extent that any representation may have been made to the applicant that
caused him to act to his detriment, the FSP may have to provide cover for this
regardless of what the policy covers.
In broad terms, the doctrine of estoppel applies when a person leads another to act
to his or her detriment. This may be through a statement made by this person which
has been relied upon. Representations may be in the form of an express promise or
they may be inferred from the conduct of a person. (See page 159 of Business Law
of Australia [7 th Edition]).
No evidence the applicant was informed he was covered for the additional
costs
A number of recorded telephone calls between the applicant and representatives of
the FSP have been forwarded for consideration.
Case No: 436178 Recommendation Page 4 of 5
Of the 12 call recordings received (the applicant said there were others), several
touch on the issue of cover for the costs of finding the leak and repairing this
damage.
In the applicant‟s view, this damage was incurred to locate the leak and not to repair
it. Therefore, he considers it should be covered. As I have already addressed, I do
not accept the costs are covered under the policy.
The consideration is therefore as to whether the FSP made any representations to
the applicant in which it agreed to accept these costs.
I have listened to all of the 12 provided calls carefully. I am satisfied the issue of
cover for the exploratory costs is brought up several times by the applicant.
There is no evidence the FSP ever explicitly agreed to co ver these costs.
Certainly, in one particular call from 4 March 2016, the consultant for the FSP
expressed empathy for the applicant‟s position and arguably agreed with him he
possibly should be covered. During the course of the 31 minute call, the consultant
appeared to agree with the applicant‟s position on several occasions.
Notwithstanding this, I am satisfied the call ended with the consultant agreeing only
to refer the matter to an appropriate person to reconsider the applicant‟s position. No
definitive position was given to the applicant promising cover. I am further satisfied
the applicant was aware of this at the conclusion of the call.
I note this call occurred after the applicant had already stripped the tiles and screed
from the shower area (which occurred prior to 23 February 2016). In this context, I
am not satisfied any representation made on 4 March 2016 would have caused him
to act to his detriment.
Ultimately, I am of the view the FSP is not required to cover the additional costs
sought by the applicant.
Case No: 436178 Recommendation Page 5 of 5
5 Supporting information
5.1 FOS approach to this dispute
General information
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions to FOS. For the purpose of this
recommendation, commentary is restricted to only those issues considered relevant
to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.