Home / Financial Firm (Unknown - Insurer) / Determination 435671

Determination 435671

Denial of earthquake damage claim to community hall

FirmFinancial Firm (Unknown - Insurer)
Decided2017-08-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$300,000
SourceAFCA PDF

Summary

A community association's hall was damaged after a 4.6 magnitude earthquake and the FSP denied the claim as wear and tear. AFCA found the earthquake was the proximate cause and no exclusion applied, and ordered the FSP to repair or cash settle after a scope of works is agreed.

The FSP bears the onus of proving an exclusion, and wear and tear and pre-loss condition did not defeat a claim the applicant established as earthquake damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 435671 Determination Page 1 of 6 Case number: 435671 31 July 2017 1 Overview 1.1 Dispute The applicant, a community association, held a business insurance policy covering its building and contents. On 3 March 2014 a claim was lodged for damage to the building following an earthquake on 26 February 2014. The FSP denied the claim and says the damage was not caused by an insured event but most likely due to wear and tear, lack of maintenance and deterioration. The applicant disputes the FSP‟s decision. 1.2 Issues and key findings Has the applicant established a claim within the terms of the policy? The applicant has established, on the balance of probabilities, that damage was sustained to the building following the earthquake on 26 February 2014. The panel is satisfied the applicant has established a valid claim within the terms of the policy. Is the FSP entitled to refuse payment of the claim? Whilst the building was old and likely to be suffering wear and tear the FSP has not provided sufficient information to establish that a relevant exclusion applies to defeat the claim. 1.3 Determination This determination is in favour of the applicant. The FSP is to arrange for a full scope of works to be completed within 30 days of the applicant‟s acceptance of this determination. Subject to the parties reaching an agreement on the scope of works the FSP may elect to either repair the building in accordance with the scope of works or cash settle the loss based on a quotation obtained from a builder prepared to complete the works including any relevant demolition or removal of debris. Case No: 435671 Determination Page 2 of 6 2 Reasons for Determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. In view of the complexities involved in this dispute it has been referred to a panel for determination. This determination follows consideration of all of the relevant information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and where applicable, prior determinations. 2.1 Has the applicant established a claim within the terms of the policy ? Policy is a defined events policy. The onus is on the applicant to establish a claim within the terms of the policy. Once established the onus shifts to the FSP to establish the application of a relevant exclusion or condition. The applicant‟s policy is a defined events policy that includes cover for a number of defined events including earthquake and accidental damage. The policy is subject to various exclusions and conditions. The onus is therefore on the applicant to establish the damage was caused by an earthquake or was accidental damage. Circumstances of loss There is no dispute that an earthquake measuring 4.6 on the Richter scale struck the applicant‟s town on 26 February 2014. The applicant believes the epicentre was reported to be 28 kilometres from the building. There does not appear to be any significant dispute with respect to this. The applicant says that prior to the earthquake, when the hall was last occupied on 22/23 February 2014 it was undamaged. When next occupied on the night of 26 February 2014 damage was observed with the ceiling sagging and the walls leaning outward. The applicant believes the damage was caused by the earthquake. The panel notes the assessor report from CL dated 20 March 2014 states as follows: „On the morning of 26 February 2014, K and surrounding districts experienced an earthquake with a magnitude of 4.6 on the Richter scale, which has caused minor damage to domestic and commercial properties.‟ CL referred to discussions with engineers anything less than a 4 magnitude earthquake does not usually cause structural damage. The FSP in its submissions has referred to the Mercalli intensity scale (MIS) as setting out the nature of damage sustained based on an earthquake‟s magnitude. The FSP appears to equate the Richter scale reading to the same scale on the M IS. They are not the same scales. The Richter scale reading of 4.6 does not equate Case No: 435671 Determination Page 3 of 6 directly to a 4.6 reading on the MIS. The MIS depends on other factors including the depth of the hypocentre, the terrain and the distance from the epicentre. It is quite possible that the intensity scale of the earthquake was in the vicinity of M IS V to VI if the hypocentre was close to the surface. Earthquake was a proximate cause of the damage. In the panel‟s view when the engineering reports are considered together with the witness information, most likely the damage to the hall followed the earthquake on 26 February 2014. There is no dispute amongst the parties that the roof structure is now sagging that some fixing between the roof timbers and wall framing failed and that the walls are now leaning outwards. Report from MCS unclear The FSP obtained engineering reports from MCS dated 12 March 2014 and DJ dated August 2016. MCS considered the likely cause of roof sagging was the additional weight of a new ceiling and deterioration of the original timbers. He did not consider the damage was due to storm or earthquake. In finding the damage was not caused by earthquake, MCS has not referred to any aspect of the earthquake event of 26 February 2014 in the report. It is unclear from the information provided whether MCS was aware that the applicants first noticed the damage after the earthquake event. Report from DJ consistent with finding earthquake caused the damage The report from DJ was obtained after the applicant lodged the dispute with the Service. The panel notes that in the instructions provided to DJ, the FSP suggested as follows:  the MIS would require 6 to cause structural damage. The FSP maintains the MIS was 4.6  the MCS report suggested that the damage was gradual and ongoing . DJ confirmed there was an earthquake with a magnitude of 4.6 on 26 February 2014 and 4.5 on 1 November 2014 (this is the only reference to an earthquake in November 2014). DJ also identified an earthquake event in April 2010. DJ considered the damage to the building was caused by the failure of the „top plate‟ due to increased horizontal loads. DJ considered that the increased horizontal loads were possibly due to creeping and sagging of the roof rafters or the sudden horizontal force imparted by earthquakes. DJ considered it was not possible to eliminate the effect of the earthquake on the building and concludes it is likely the earthquake did contribute in some form to the failure of the top plate/tie rod connection. Case No: 435671 Determination Page 4 of 6 Report from R consistent with earthquake as cause of damage The report from R obtained by the applicant is consistent with the findings of DJ. R noted there was a sudden decline in the structural condition of the hall consistent with earthquake events on 26 February 2014. R noted that almost immediately after this the north east wall of the hall had defected outwards and panel ceilings had dislodged and fallen from the suspended ceiling. R confirmed that a search of the geoscience website indicates there was a magnitude of 4.6 earthquake less than 30 kilometres west of K on 26 February 2014. This was followed by two lower magnitude earthquakes at the same time over the area. Whilst conceding the original hall structure was old and would be unlikely to pass current code requirements, R noted that the hall had been altered/modified and strengthened in the past. When the suspended ceiling was added concurrent strengthening measures such as steel rod ties, additional braces and top of wall angles were installed. This was not commented on by MCS. R concluded that the failure visible at the top of the north east wall of the hall is highly likely to be a result of “ a significant impulsive or abnormal load induced failure ” . This is consistent with the event occurring as a result of the earthquake on 26 February 2014. Damage not caused by April 2010 earthquake DJ referred to anecdotal evidence from applicant members indicating that the suspended ceiling panels dropped to the floor or dislodged after the 2010 earthquake event. T he FSP‟s response of 8 December 2016 confirmed it relied heavily on the statement by DJ to the effect that the damage occurred following an earthquake in 2010. The FSP made further submissions with respect to this in its correspondence on 9 August 2016. The applicant provided a detailed statutory declaration from TS, the applicants‟ representative who spoke to DJ. TS disputes that a 2010 event was discussed and sets out, in the panel ‟ s view persuasively, the details of the discussion which occurred. TS believes that the event referred to was the earthquake of 26 February 2014. In an email on 15 December 2016, DJ acknowledges he met TS and concedes TS may have been referring to the 2014 event even though he thought he was referring to a 2010 event. The panel accepts that DJ was of the view that the damage to the hall was consistent with earthquake damage. The applicant‟s information is that the damage was first observed after the February 2014 event. The panel accepts the proximate cause of the damage was the earthquake of 26 February 2014. Case No: 435671 Determination Page 5 of 6 2.2 Is the FSP entitled to refuse payment of the claim? The panel is of the view that the FSP is not entitled to refuse payment of the claim. The only limitation on cover, subject to establishing damage due to earthquake is that the FSP will not be liable to pay or contribute the lesser of: a. the first 20,000 or b. an amount equal to 1 per cent of the total sum insured. No exclusions appear under this defined event. Under the Insured event „Accidental Damage‟ there is an exclusion relating to damage caused by wear and tear. This is not relevant to the applicant ‟ s claim as the damage was caused by earthquake. Under the general exclusion section of the policy the exclusions relate to issues such as war, terrorism, radio activity, intentional damage, electronic data and admitted insurance. Those exclusions do not apply in this claim. The general conditions applicable to all sections of the policy require the applicant to: 1. take all reasonable precautions to avoid or minimize loss . There is no information that the applicant either recognized the risk of damage to the building by earthquake or having recognized that risk deliberately courted that risk by failing to undertake any particular activity. 2. maintain the building premises fittings, appliances and equipment is in sound condition. There is no information that the applicant failed to maintain the hall in sound condition. Whilst MCS has suggested that sagging of the roof had occurred over a long period this is not supported by the statement of the members. There is no information to suggest the applicant failed to comply with the general conditions of the policy. In the circumstances the panel is not satisfied that the FSP has established the application of an exclusion or it is entitled to rely upon on the pre loss condition of the building to avoid liability for the claim. 2.3 FSP is to meet the applicant’s claim Settlement of the claim The applicant has indicated that it seeks $300,000 in settlement of the claim. The applicant maintains that the main hall section of the building needs to be repaired whilst the back section which comprises the kitchen, stage band storage area and toilet area is still useable. The applicant obtained a quote to erect a prefabricated building to replace the main hall section but not the back section for a total of $93,810. It obtained an additional quote of $36,000 to demolish the hall and additional costs would be incurred to pour a new concrete slab, plasterboard lining of the inside of the building and electrical Case No: 435671 Determination Page 6 of 6 services. The applicant maintains that this work could be done within a budget of $300,000. In rejecting the applicant ‟ s claim, the FSP has maintained the applicant has not substantiated the claim for a $300,000 settlement. The FSP has not offered any alternative quote. In the panel ‟s view the extent of the damage has not been properly identified in the material exchanged. Whilst the engineering reports refer to the nature of the damage sustained, it is unclear exactly what would be required to repair or reinstate the building to its pre loss condition. In the circumstances the panel believes that subject to the applicant accepting this determination, the FSP should engage a suitably qualified builder and engineer to prepare a detailed scope of works to allow for the repair of the damaged section of the building. Upon receipt of the scope of works and subject to the parties agreeing to the scope of works, the FSP is to obtain quotations from suitably qualified builders who are prepared to complete the work including any suitable allowance for demolition or other benefits under the policy. The FSP may then in consultation with the applicant either agree to repair or replace the hall as per the scope of works or cash settle the dispute for the amount of the quotation including any additional benefits plus any relevant builder‟s margin. In the event that the parties are unable to reach an agreement as to any cash settlement, the matter may be referred back to the Service for determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.