Home / Financial Firm (Unknown - Insurer) / Determination 435671
Determination 435671
Denial of earthquake damage claim to community hall
Summary
A community association's hall was damaged after a 4.6 magnitude earthquake and the FSP denied the claim as wear and tear. AFCA found the earthquake was the proximate cause and no exclusion applied, and ordered the FSP to repair or cash settle after a scope of works is agreed.
The FSP bears the onus of proving an exclusion, and wear and tear and pre-loss condition did not defeat a claim the applicant established as earthquake damage.
Issues
- Claim denial primary · upheld
“The FSP is not entitled to refuse payment of the claim; the damage was proximately caused by the 26 February 2014 earthquake and no exclusion applies.”
- Claim amount dispute secondary · unclear
“The extent of the damage has not been properly identified; the FSP should engage a builder and engineer to prepare a detailed scope of works.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Text of the determination
Determination
Case No: 435671 Determination Page 1 of 6
Case number: 435671 31 July 2017
1 Overview
1.1 Dispute
The applicant, a community association, held a business insurance policy covering
its building and contents.
On 3 March 2014 a claim was lodged for damage to the building following an
earthquake on 26 February 2014. The FSP denied the claim and says the damage
was not caused by an insured event but most likely due to wear and tear, lack of
maintenance and deterioration.
The applicant disputes the FSP‟s decision.
1.2 Issues and key findings
Has the applicant established a claim within the terms of the policy?
The applicant has established, on the balance of probabilities, that damage was
sustained to the building following the earthquake on 26 February 2014. The panel is
satisfied the applicant has established a valid claim within the terms of the policy.
Is the FSP entitled to refuse payment of the claim?
Whilst the building was old and likely to be suffering wear and tear the FSP has not
provided sufficient information to establish that a relevant exclusion applies to defeat
the claim.
1.3 Determination
This determination is in favour of the applicant.
The FSP is to arrange for a full scope of works to be completed within 30 days of the
applicant‟s acceptance of this determination. Subject to the parties reaching an
agreement on the scope of works the FSP may elect to either repair the building in
accordance with the scope of works or cash settle the loss based on a quotation
obtained from a builder prepared to complete the works including any relevant
demolition or removal of debris.
Case No: 435671 Determination Page 2 of 6
2 Reasons for Determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
In view of the complexities involved in this dispute it has been referred to a panel for
determination.
This determination follows consideration of all of the relevant information exchanged
and is based on what is fair in all the circumstances, having regard to the relevant
legal principles, terms of the policy, good industry practice including codes of practice
and where applicable, prior determinations.
2.1 Has the applicant established a claim within the terms of the policy ?
Policy is a defined events policy.
The onus is on the applicant to establish a claim within the terms of the policy. Once
established the onus shifts to the FSP to establish the application of a relevant
exclusion or condition.
The applicant‟s policy is a defined events policy that includes cover for a number of
defined events including earthquake and accidental damage. The policy is subject to
various exclusions and conditions.
The onus is therefore on the applicant to establish the damage was caused by an
earthquake or was accidental damage.
Circumstances of loss
There is no dispute that an earthquake measuring 4.6 on the Richter scale struck the
applicant‟s town on 26 February 2014. The applicant believes the epicentre was
reported to be 28 kilometres from the building. There does not appear to be any
significant dispute with respect to this.
The applicant says that prior to the earthquake, when the hall was last occupied on
22/23 February 2014 it was undamaged. When next occupied on the night of 26
February 2014 damage was observed with the ceiling sagging and the walls leaning
outward. The applicant believes the damage was caused by the earthquake.
The panel notes the assessor report from CL dated 20 March 2014 states as follows:
„On the morning of 26 February 2014, K and surrounding districts experienced an
earthquake with a magnitude of 4.6 on the Richter scale, which has caused minor
damage to domestic and commercial properties.‟
CL referred to discussions with engineers anything less than a 4 magnitude
earthquake does not usually cause structural damage.
The FSP in its submissions has referred to the Mercalli intensity scale (MIS) as
setting out the nature of damage sustained based on an earthquake‟s magnitude.
The FSP appears to equate the Richter scale reading to the same scale on the M IS.
They are not the same scales. The Richter scale reading of 4.6 does not equate
Case No: 435671 Determination Page 3 of 6
directly to a 4.6 reading on the MIS. The MIS depends on other factors including the
depth of the hypocentre, the terrain and the distance from the epicentre.
It is quite possible that the intensity scale of the earthquake was in the vicinity of M IS
V to VI if the hypocentre was close to the surface.
Earthquake was a proximate cause of the damage.
In the panel‟s view when the engineering reports are considered together with the
witness information, most likely the damage to the hall followed the earthquake on 26
February 2014.
There is no dispute amongst the parties that the roof structure is now sagging that
some fixing between the roof timbers and wall framing failed and that the walls are
now leaning outwards.
Report from MCS unclear
The FSP obtained engineering reports from MCS dated 12 March 2014 and DJ dated
August 2016.
MCS considered the likely cause of roof sagging was the additional weight of a new
ceiling and deterioration of the original timbers. He did not consider the damage was
due to storm or earthquake.
In finding the damage was not caused by earthquake, MCS has not referred to any
aspect of the earthquake event of 26 February 2014 in the report. It is unclear from
the information provided whether MCS was aware that the applicants first noticed the
damage after the earthquake event.
Report from DJ consistent with finding earthquake caused the damage
The report from DJ was obtained after the applicant lodged the dispute with the
Service.
The panel notes that in the instructions provided to DJ, the FSP suggested as
follows:
the MIS would require 6 to cause structural damage. The FSP maintains the
MIS was 4.6
the MCS report suggested that the damage was gradual and ongoing .
DJ confirmed there was an earthquake with a magnitude of 4.6 on 26 February 2014
and 4.5 on 1 November 2014 (this is the only reference to an earthquake in
November 2014). DJ also identified an earthquake event in April 2010.
DJ considered the damage to the building was caused by the failure of the „top plate‟
due to increased horizontal loads. DJ considered that the increased horizontal loads
were possibly due to creeping and sagging of the roof rafters or the sudden
horizontal force imparted by earthquakes.
DJ considered it was not possible to eliminate the effect of the earthquake on the
building and concludes it is likely the earthquake did contribute in some form to the
failure of the top plate/tie rod connection.
Case No: 435671 Determination Page 4 of 6
Report from R consistent with earthquake as cause of damage
The report from R obtained by the applicant is consistent with the findings of DJ.
R noted there was a sudden decline in the structural condition of the hall consistent
with earthquake events on 26 February 2014. R noted that almost immediately after
this the north east wall of the hall had defected outwards and panel ceilings had
dislodged and fallen from the suspended ceiling.
R confirmed that a search of the geoscience website indicates there was a
magnitude of 4.6 earthquake less than 30 kilometres west of K on 26 February 2014.
This was followed by two lower magnitude earthquakes at the same time over the
area.
Whilst conceding the original hall structure was old and would be unlikely to pass
current code requirements, R noted that the hall had been altered/modified and
strengthened in the past. When the suspended ceiling was added concurrent
strengthening measures such as steel rod ties, additional braces and top of wall
angles were installed. This was not commented on by MCS.
R concluded that the failure visible at the top of the north east wall of the hall is highly
likely to be a result of “ a significant impulsive or abnormal load induced failure ” . This
is consistent with the event occurring as a result of the earthquake on 26 February
2014.
Damage not caused by April 2010 earthquake
DJ referred to anecdotal evidence from applicant members indicating that the
suspended ceiling panels dropped to the floor or dislodged after the 2010 earthquake
event.
T he FSP‟s response of 8 December 2016 confirmed it relied heavily on the statement
by DJ to the effect that the damage occurred following an earthquake in 2010. The
FSP made further submissions with respect to this in its correspondence on 9 August
2016.
The applicant provided a detailed statutory declaration from TS, the applicants‟
representative who spoke to DJ.
TS disputes that a 2010 event was discussed and sets out, in the panel ‟ s view
persuasively, the details of the discussion which occurred. TS believes that the event
referred to was the earthquake of 26 February 2014.
In an email on 15 December 2016, DJ acknowledges he met TS and concedes TS
may have been referring to the 2014 event even though he thought he was referring
to a 2010 event.
The panel accepts that DJ was of the view that the damage to the hall was consistent
with earthquake damage. The applicant‟s information is that the damage was first
observed after the February 2014 event. The panel accepts the proximate cause of
the damage was the earthquake of 26 February 2014.
Case No: 435671 Determination Page 5 of 6
2.2 Is the FSP entitled to refuse payment of the claim?
The panel is of the view that the FSP is not entitled to refuse payment of the claim.
The only limitation on cover, subject to establishing damage due to earthquake is that
the FSP will not be liable to pay or contribute the lesser of:
a. the first 20,000 or
b. an amount equal to 1 per cent of the total sum insured.
No exclusions appear under this defined event.
Under the Insured event „Accidental Damage‟ there is an exclusion relating to
damage caused by wear and tear. This is not relevant to the applicant ‟ s claim as the
damage was caused by earthquake.
Under the general exclusion section of the policy the exclusions relate to issues such
as war, terrorism, radio activity, intentional damage, electronic data and admitted
insurance. Those exclusions do not apply in this claim.
The general conditions applicable to all sections of the policy require the applicant to:
1. take all reasonable precautions to avoid or minimize loss . There is no
information that the applicant either recognized the risk of damage to the
building by earthquake or having recognized that risk deliberately courted that
risk by failing to undertake any particular activity.
2. maintain the building premises fittings, appliances and equipment is in sound
condition. There is no information that the applicant failed to maintain the hall in
sound condition. Whilst MCS has suggested that sagging of the roof had
occurred over a long period this is not supported by the statement of the
members.
There is no information to suggest the applicant failed to comply with the general
conditions of the policy.
In the circumstances the panel is not satisfied that the FSP has established the
application of an exclusion or it is entitled to rely upon on the pre loss condition of the
building to avoid liability for the claim.
2.3 FSP is to meet the applicant’s claim
Settlement of the claim
The applicant has indicated that it seeks $300,000 in settlement of the claim.
The applicant maintains that the main hall section of the building needs to be
repaired whilst the back section which comprises the kitchen, stage band storage
area and toilet area is still useable.
The applicant obtained a quote to erect a prefabricated building to replace the main
hall section but not the back section for a total of $93,810. It obtained an additional
quote of $36,000 to demolish the hall and additional costs would be incurred to pour
a new concrete slab, plasterboard lining of the inside of the building and electrical
Case No: 435671 Determination Page 6 of 6
services. The applicant maintains that this work could be done within a budget of
$300,000.
In rejecting the applicant ‟ s claim, the FSP has maintained the applicant has not
substantiated the claim for a $300,000 settlement. The FSP has not offered any
alternative quote.
In the panel ‟s view the extent of the damage has not been properly identified in the
material exchanged. Whilst the engineering reports refer to the nature of the damage
sustained, it is unclear exactly what would be required to repair or reinstate the
building to its pre loss condition.
In the circumstances the panel believes that subject to the applicant accepting this
determination, the FSP should engage a suitably qualified builder and engineer to
prepare a detailed scope of works to allow for the repair of the damaged section of
the building.
Upon receipt of the scope of works and subject to the parties agreeing to the scope
of works, the FSP is to obtain quotations from suitably qualified builders who are
prepared to complete the work including any suitable allowance for demolition or
other benefits under the policy.
The FSP may then in consultation with the applicant either agree to repair or replace
the hall as per the scope of works or cash settle the dispute for the amount of the
quotation including any additional benefits plus any relevant builder‟s margin.
In the event that the parties are unable to reach an agreement as to any cash
settlement, the matter may be referred back to the Service for determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.