Claim for storm-damaged jetty denied for corrosion, wear and tear

FirmFinancial Firm (Unknown - Insurer)
Decided2016-11-08
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$15,400
SourceAFCA PDF

Summary

The applicants claimed a $15,400 restoration of their collapsed rental jetty after a storm, and the FSP denied the claim. AFCA found the preponderance of expert evidence showed rust and deterioration caused the collapse, so the exclusions applied and no action was required.

The insured bore the onus to show a covered loss, and the insurer established on the expert evidence that the damage fell within the corrosion, wear and tear exclusions.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 435364 Determination Page 1 of 6 Case number: 435364 8 November 2016 1 Overview 1.1 Dispute The applicants lodged a claim on their landlord insurance policy for storm damage they claim caused the collapse of the jetty of their rental home in late January/early February 2016. The financial services provider (FSP) denied the claim, submitting:  the collapse of the jetty was due to long term wear and tear, gradual deterioration as well as corrosion  the jetty was not adequately maintained by the applicants and there is insufficient evidence to attribute the loss of the structure to the actions of the storm. A quote for $15,400 to restore the jetty was provided by the applicants. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicants. In the circumstances, the dispute has been referred to me for determination . 1.2 Issue and key findings Is the FSP entitled to deny the claim? The preponderance of the independent expert evidence establishes on the balance of probabilities the jetty was damaged by corrosion, gradual deterioration and wear and tear. As these causes of damage are excluded from cover, the FSP is entitled to deny the claim. 1.3 Determination This determination is in favour of the FSP. The FSP need take no further action in relation to the claim or the dispute. Case No: 435364 Determination Page 2 of 6 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. Further submissions made after the recommendation After the recommendation was rejected, the applicants made further submissions and provided a copy of the male applicant‟s degree and a photograph which had been provided in earlier submissions. Where relevant, these further submissions will be referred to in the determination. The FSP made no further submissions. 2.1 Is the FSP entitled to deny the claim? The damage was neither expected or intended The applicants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP‟s policy covers the jetty for any accidental damage or accidental loss including that caused by storm. Accidental loss or damage is not defined in the policy. In the context of insurance claims, accidental damage means damage caused by events which are neither expected nor intended. Photographs taken by the FSP‟s assessor not long after the claim was made in February 2016 show damage to the jetty. I am satisfied the photographed damage was neither expected nor intended. I am satisfied the applicants have established a prima facie claim. FSP must establish policy exclusions caused the claimed damage Once so established, the onus shifts to the FSP to prove on the balance of probabilities the damage was caused by an event covered by a policy exclusion. The FSP says the jetty collapsed due to long term wear and tear and corrosion. It says the damage was caused due to rusting of metal girders and rotten wooden beams in the jetty. It relies on three expert reports which are supported by photographs of the damaged jetty. The FSP also says the applicants failed to maintain the property in accordance with local council requirements which specifically refer to maintenance obligations of the person responsible for a jetty. Initially there was some confusion as to when the damage occurred. Once clarified, the FSP relied on daily weather observations provided by the Bureau of Meteorology (BOM). The FSP submitted the wind speed at the relevant time was insufficient to cause a solid jetty to exhibit the damage observed. Rather, the FSP contends the Case No: 435364 Determination Page 3 of 6 damage was caused by a complete failure of rusted steel cross beams, leading to the piles pushing through the timber structure which then collapsed into the water. The FSP also points out there was no other damage on the insured property or in neighboring properties. It submits the lack of other damage points to the cause being the pre-existing condition of the jetty rather than storm damage. Applicants provide no independent expert opinion The applicants claim the damage was caused by storm events in the week from 29 January to 5 February 2016. They assert the severity of the storm was beyond the bearing loads of the structure and, if not for the storm, the jetty would have been in service for many years. The applicants submitted it is a documented fact thunderstorms have the possibility of localised strong winds and updraft. They say the jetty was only designed to take weight loadings and reasonable lateral or sideways loadings but not designed to resist taking flight in an extreme wind event. They submit conclusions in the FSP‟s expert reports are incorrect and/or were based on incorrect or insufficient information and did not take into account the localised severity of the storm. They describe the jetty structure and submit there was just surface rusting. They say the jetty stands in salt water all day and had specifically been over engineered for that particular purpose. They say the cross support on each concrete pier for the timber deck had uncompromised solid core steel. The applicants challenge the expertise of the FSP‟s engineer. The male applicant says the arguments for rejection of the recommendation are largely technical. He says he is a qualified enginee r with 40 years‟ experience in the Royal Australian Navy and with extensive experience in the marine environment. No material is provided by the applicants from an independent source. FSP relies on three expert opinions and material from BOM The FSP‟s b uilder inspected and photographed the damage on 24 February 2016. He noted the metal bearers displayed large amounts of rusting and the timber subfloor members displayed signs of rot due to water exposure. He concluded the jetty collapsed because the metal bearer beams could no longer continue to support the weight of the jetty. The FSP‟s assessor inspected and photographed the jetty on 2 March 2016. He came to the same conclusion. He said the steel beams across the concrete piles (which were not damaged) were completely rusted away and the timber structure of the jetty was deteriorated with rot. He also photographed a neighbouring jetty which was undamaged. The FSP‟s engineer inspected and photographed the jetty with the applicants‟ tenant on 23 March 2016. The tenant said the jetty was in good and usable condition prior to the storm event. Remnants of the jetty had been removed as requested by local authorities. Case No: 435364 Determination Page 4 of 6 The FSP‟s engineer said the heavy corrosion of the jetty steel headstock structural beams resulted in the failure of the structural steel members. He said this would have occurred over many years and is unlikely to have occurred in January/February 2016 in a storm event. He said the damage is indicative of years of maintenance failure of the steel in a marine environment. He concluded: „ The most likely proximate cause of the collapse of the boat jetty is the heavy corrosion and aged deterioration of the structural steel headstock members that support the decking. As shown in the photographs, it remains our opinion that the structural steel headstock members have failed causing the decking to fall down and causing the embedded concrete piers to push or puncture through the timber decking. In our opinion this gradual deterioration of the structural steel members has occurred over many years .‟ The opinions were based on initial advice from the applicants the storm event was on or about 12 February 2016. The FSP‟s engineer considered the further submissions from the applicants and material from BOM about the weather in late January/early February 2016 and remained of the same view. He said: „ In my opinion any well-constructed, well-maintained and compliant jetty structure would not become detached in the 60 or 70 KM /hr winds recorded by BOM in the Gold Coast area during January and February 2016 .‟ He also considered it would be unusual for the jetty to collapse during a storm event without evidence of similar or associated damage to nearby buildings, structures, gardens and trees. Preponderance of expert opinion establishes damage caused by rust over time Although the applicants have made detailed submissions, the FSP has relied on opinions from three experts all of whom have inspected and photographed the damaged jetty. Further, although the male applicant has made a number of technical arguments which he says should be accepted as he is a qualified engineer, the material provided shows he completed an approved course of study in electronic engineering. The FSP relies on a civil engineer. I consider the FSP‟s engineer‟s training and experience is more pertinent to the issues in dispute. Moreover, even if I were to prefer the submissions of the male applicant to the three opinions relied on by the FSP, the male applicant is not independent. And, in the absence of any objective independent expert opinion, I am unable to prefer his submissions or accept a photograph of the remaining metal alone demonstrates the jetty had the structural strength asserted by the applicants. I have carefully considered the material provided by the parties from BOM and the photographs of the damage. The damage to the jetty is significant. On 29 January and 5 February 2016 “strong wind” was observed. The FSP relies on daily weather Case No: 435364 Determination Page 5 of 6 observations from a weather station proximate to the applicants‟ property. On the said two days, the maximum wind gust recorded was 72 and 67 km/h. Even if I was to accept there were localised wind gusts greater than these recorded, I am not persuaded to the applicant s‟ viewpoint. Furthermore, the applicants cannot state with certainty when the damage actually occurred. Rather, I am persuaded by the FSP‟s engineer‟s observation it would be unusual for the jetty to collapse because of such a strong wind without evidence of similar or associated damage to nearby buildings, structures, gardens and trees. Although the applicants argue localised damage occurred in a storm in December 2013, having considered the photographs and the nature of the damage caused then, I do not consider December 2013 storm event analogous. The damage to the jetty in this claim is significant. And yet there is no evidence of damage to anything at all in close proximity to the jetty. I have carefully considered the submissions from the applicants together with material they provided. However, considering all the material provided, for the reasons stated, I am satisfied the FSP has established, on the balance of probabilities, the damage was caused by rust, corrosion, gradual deterioration, wear and tear. In these circumstances, the FSP is entitled to rely upon the policy exclusion and deny the claim. Having come to this conclusion, it is not necessary to consider the arguments and submissions regarding other policy exclusions relied upon by the FSP. Case No: 435364 Determination Page 6 of 6 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 2 May 2016. Both the policy document and the Notice have been exchanged with the applicants. 3.3 Material relied on and considered  Parties‟ submissions and all attachments to submissions including reports and photographs.  Correspondence between the parties.  Material from Bureau of Meteorology.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.