Text of the determination
Determination
Case No: 435088 Determination Page 1 of 6
Case number: 435088 15 May 2017
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under her Home Building Insurance
Policy, held with the financial service provider (FSP), following damage to the home
as a result of a storm in April 2015.
The FSP has accepted the applicant‟s claim and seeks to cash settle on the basis
that the repairs required as a result of the insured event cannot be completed and
guaranteed due to other c oncerns with the applicant‟s home, which the FSP says are
unrelated to the insured event.
In addition the FSP seeks to rely upon exclusions from cover including damages
caused by or arising from, or involving wear and tear, mould, mildew, rot or gradual
deterioration and ground movement.
1.2 Issues and key findings
Does the FSP’s offer meet its obligations under the terms and conditions of the
policy?
The FSP‟s offer does not meet its obligations under the terms and conditions of the
policy.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is to pay the applicant the amount of $180,000 for the damage in respect of
the building. For the sake of clarity, this includes and is not in addition to, the FSP‟s
offer of $152,945.23.
In respect to temporary accommodation, the FSP is to pay the applicant the
additional amount of $6,825.
The FSP is not required to pay interest on these amounts.
Case No: 435088 Determination Page 2 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and eac h party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
Whilst all of the exchanged material has been considered by the panel, only that
material relevant to the final outcome will be referred to within the determination.
2.1 Does the FSP’s offer meet its obligations under the terms and
conditions of the policy?
Coverage of the policy
The applicant‟s Home Building Insurance Policy provides coverage in the event of
loss and damage to the building caused by an insured event which is covered by the
policy.
This means that not all loss and damage is automatically covered, but rather only
loss and damage caused by an insured event detailed within the policy.
The coverage of the policy is detailed within the Product Disclosure Statement
(PDS).
The PDS details:
What you are covered for - Insured Events
We cover the building for loss or damage at the insured address caused by an insured
event during the period of insurance. There are some things we do not cover and these
are shown in the „We do not cover‟ section of the following tables on pages 16 to 25
and in the „What w e do not cover - general exclusions‟ on pages 35 to 40.
…
Storm
We cover
Loss or damage to the building caused by a storm.
We do not cover
loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover loss or
damage to the building caused by a landslide or subsidence proved to have occurred
within 72 hours of, and directly because of, a storm and not because of erosion over
time, structural fault or design fault;
The coverage provided by the policy is subject to the exclusion which are detailed within the
PDS.
The PDS details:
What we do not cover - general exclusions
Case No: 435088 Determination Page 3 of 6
You are not covered under any section of your policy for damage, loss, cost or legal
liability that is caused by, arises from or involves:
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any
other earth movement, but we will cover landslide or subsidence that is specifically
covered under the following insured events:
• „Storm‟;
• „Flood‟ (but only if you have cover for insured event „Flood‟);
• „Earthquake and Tsunami‟;
• „Explosion‟.
…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not limited to :
• tiles and their adhesive or grouting breaking down;
• weathering of roof tiles o r roof ridge capping;
• gradual weathering and breakdown of bricks, mortar or concrete.
It is accepted insurance law that the insured carries the initial onus to establish that
she has suffered loss and damage which is covered by the terms and conditions of
the policy.
That is, the applicant is required to show that the loss and damage claimed was
caused by the storm which occurred in April 2015.
Once the applicant has established loss and damage caused by the storm, the onus
shifts to the FSP to establish the basis on which it otherwise seeks to deny parts of
the claim, including its reliance upon exclusions within the policy.
As stated, the FSP has accepted the applicant‟s claim and has made an offer in the
amount of $152,945.23 in regard to repairs to the property.
The FSP says that it has made payments to the applicant, totalling $43,368, in
respect of temporary accommodation, covering the period 30 April 2015 to
19 December 2016.
Any claim in relation to contents at the property does not form part of this dispute or
this determination.
Cash settlement
The FSP says that the other non-insurance related issues at the site mean it would
not be possible for an FSP repair to be carried out for the applicant, as warranty
would not be able to be offered given the damage said to be unrelated to the storm
event.
In respect to the question of how the FSP may settle a claim, the PDS details:
‘ How we settle building claims
Case No: 435088 Determination Page 4 of 6
If we agree to pay a claim for loss, theft or damage to the building, we will decide if we
will:
• repair damage to the building;
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building;
• pay you the building sum insur ed shown on your certificate of insurance;
Note: This does not apply if you have selected the Complete Replacement Cover®
option.
• give you a voucher, store credit or stored value card for the amount it would cost us to
repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will do so on a `new for
old‟ basis.
If we repair (or pay you what it would cost us to repair), we will at our option do so on a
„new for old‟ basis or repair to a similar condition to what t he building was in before the
loss or damage occurred. ‟
Whilst the panel accepts that the FSP has a discretion under the terms of the policy
to cash settle a claim, the panel has to be satisfied that the discretion is being used
fairly.
In determining whether to exercise the discretion to cash settle the claim, the FSP
must take into account all reasonable factors including the nature of the repairs
required and whether a cash settlement would adequately ensure the applicant is
able to properly complete all repairs.
In addition the panel is conscious of the significant fact that a cash settlement of the
claim means that the risks associated with the repair process are transferred from the
FSP to the applicant.
The panel accepts that the full nature of the repairs required are not necessarily
known until the repairs are actually commenced.
In this regard the panel notes the supplementary report from the FSP‟s building
consultant (S);
It should be note that no inspection can be regarded as absolute. S cannot give
warrant or guarantee that future impact, earth works, removal work or weathering
events will not uncover building materials or fill with the potential to contain asbestos.
Further, the BAL (bushfire attack level) assessment is noted as being only
provisional.
As a result, whilst any quotations for repair form a useful starting point for an
assessment of the cash settlement, the panel is satisfied that there are other factors
which need to be considered.
The cost of repairs
The exchanged material includes two scopes of works prepared by the FSP‟s
building consultants (S). The first relates to the works required as a result of damage
caused by the insured event.
Case No: 435088 Determination Page 5 of 6
The second scope of works relates to damages a nd issues at the site that had been
deemed to be unrelated to the insured event.
On the basis of the first scope of works, the FSP obtained quotations from a builder
which totalled $129,845.23.
The FSP accepted that some mould at the property was caused by the insured event
and obtained an additional quotation with regard to mould removal.
The quotation for mould removal provided a range and the FSP indicated it was
prepared to offer the upper amount in the range of $23,100.
As such, the FSP advised that it was prepared to cash settle the claim for the amount
of $152,945.23.
The applicant obtained a report from a builder, following his inspection at the property
on 28 September 2016. The report does not include a quotation for repairs but raises
a number of issues with the scope of works prepared by the FSP‟s building
consultant S and the FSP‟s structural engineer SE.
In response, the FSP has provided supplementary reports from S and SE, dated 20
February 2017 and 21 February 2017 respectively.
The supplementary reports address the issues raised by the applicant‟s builder.
On the basis of the supplementary reports the FSP says that S and SE have
satisfactorily answered the questions and provided a clarification to the applicant and
to her builder.
Further, the FSP says that many of the builders concerns fall outside the boundaries
of coverage offered as they are unrelated to the insured event and in most cases
were pre-existing and present well before the insured event in April 2015.
As a consequence, the FSP stands by its earlier offer of $152,945.23.
Having reviewed all of the exchanged material, the panel is satisfied that the reports
and scopes of work prepared by S and SE, do adequately cover the repairs required
as a result of the insured event.
The panel is satisfied that the FSP is entitled to rely upon its scope of works and
quotations in regard to the resolution of the applicant‟s claim.
However, given the fact the FSP seeks to cash settle the claim, the cash settlement
needs to account for the transfer of risk and the unknown issues which will arise
during the course of repair.
Having regard to that matter, the panel is satisfied that upon acceptance of this
determination by the applicant, the FSP is entitled to settle the applicant‟s claim f or
repairs by the cash settlement amount of $180,000.
Temporary accommodation
The PDS details:
When an insured event damages the building to
the extent you cannot live there, and we agree, we
will pay for your reasonable temporary
accommodation costs for the time it will take
to repair or rebuild the building to a liveable
condition. The most we will pay is:
Case No: 435088 Determination Page 6 of 6
• up to 4 weeks in short term accommodation agreed to
by us (e.g. standard rates for a hotel, motel or serviced
apartment), then if necessary;
• up to another 48 weeks in residential accommodation
of a similar standard to the building.
We will also pay the reasonable and necessary costs
for:
• redirection of mail from the insured address for up to 52
weeks;
• utility connection costs at the temporary
accommodation residence;
• assistance with bond payment if required, however any
amount we pay in bond is recoverable from you by us.
We may deduct this amount from any amount payable
to you.
Limit
Th e m o s t we wi ll p a y f o r a n y o n e e v e n t i s 10% o f t h e
b u i l di n g sum i nsu r ed , u n le ss yo u r ce r t i fi c a t e o f i nsu r a n ce
sh ow s t h a t yo u h a v e C o m p l e t e R ep l a c emen t C o ver ®
o pt io n ( s ee p ag e 31 ) , i n w h ic h c a s e we p a y t h e
r e a s o n a b l e a n d necessary costs.
As stated the FSP has provided evidence to confirm it has made payments to the
applicant for temporary accommodation, totally $43,368, covering the period 30 April
2015 to 19 December 2016.
The panel notes that the applicant has Complete Replacement Cover and thus
consideration needs to be given to “… the reasonable and necessary costs.”
Whilst the panel is conscious of the fact the FSP has paid a considerable amount for
temporary accommodation, the panel also notes that repairs have not commenced
and as determined by the panel, the FSP‟s offer was not adequate. The panel is
satisfied that it is fair in all the circumstances that upon acceptance of this
determination by the applicant, the FSP pay the applicant the additional amount of
$6,825 for temporary accommodation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.