Text of the determination
Determination
Case No: 434932 Determination Page 1 of 13
Case number: 434932 5 April 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his boat insurance policy with the financial
services provider (FSP) after his catamaran suffered structural damage during a
voyage from Coffs Harbour to the Gold Coast in September 2014.
The applicant says the damage to his boat was caused by severe weather conditions
experienced during the voyage.
The FSP denied the claim on the basis that the damage was not caused by an
‘accident’ (as defined in the policy), but by factors which are excluded from cover
under the policy, such as a fault or error in the design or construction of the boat.
The applicant disputes the FSP’s denial of his claim. He is als o dissatisfied with the
manner in which the FSP has handled his claim.
1.2 Issues and key findings
Is the FSP liable for the damage to the boat?
The proximate cause of the damage to the applicant’s boat was the significant
construction errors and deficiencies due to the techniques and practices used by the
original builder.
The available information does not establish that the weather conditions experienced
on 2 September 2014 were so severe as to have caused the claimed damage to the
boat, in the absence of the serious construction deficiencies identified.
Accordingly, the FSP is entitled to rely on the exclusion for repairs required as a
result of fault or error in design or construction, in order to deny the applicant’s claim.
Is the applicant entitled to any other amounts?
The applicant is not entitled to compensation because:
the FSP’s failure to re -laminate the internal panels replaced following
destructive testing has not resulted in any material additional loss, given the
condition of the boat; and
the FSP managed the claim reasonably overall, given the complexity of the
claim and the extent of the investigations required to determine the cause of the
damage.
Case No: 434932 Determination Page 2 of 13
1.3 Determination
This determination is in favour of the FSP.
The FSP is not liable for the applicant’s claim .
Case No: 434932 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP liable for the damage to the boat?
Policy provides cover for accidental damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant ’ s policy provides cover for accidental loss or damage to his boat,
subject to the conditions and exclusions set out in the policy.
For the purposes of the policy, ‘accidental damage’ is defined to mean physical
damage which occurs due to a n ‘accident’, being a happening that is unforeseen and
unintended by the insured person.
Applicant has established prima facie claim
There is no dispute that the boat has suffered extensive damage.
The experts (NA and NJ) appointed by the parties confirmed there were major
structural failures to the tunnel shoulder and wet deck running approximately half the
length of the vessel as well as the complete delamination of the panels .
The applicant says the damage to the hull was caused by the stresses imposed by
the repetitive impact of ocean waves and swell during the severe weather conditions
experienced on 2 September 2014.
The FSP disputes that the weather conditions on 2 September 2014 were severe
enough to damage the boat. The FSP says the structural failure of the hull occurred
due to errors in the design and construction of the boat which made it unable to
withstand the stresses imposed under normal operating conditions.
On this basis, the FSP says the damage was foreseeable and therefore it was not
caused by an ‘accident’, as is required to establish a prima facie claim for accidental
damage under the policy.
The available information confirms that the damage to the applicant’s boat occurred
suddenly, unexpectedly and unintentionally, while the boat was being sailed from
Coffs Harbour to the Gold Coast. The boat was being sailed by a skipper and crew
member engaged by the applicant’s boat broker for this purpose.
There is no information to suggest that the damage to the boat was anything other
than unforeseen and unintended, from the applicant’s perspective.
In these circumstances, the panel is satisfied that the applicant has established a
prima facie claim, given the broad cover for accidental damage provided under the
policy.
Case No: 434932 Determination Page 4 of 13
The issues raised by the FSP are more properly considered in the context of
identifying the cause of the damage, for the purpose of determining whether the FSP
is entitled to rely on an exclusion under the policy to deny liability for the applicant’s
claim.
FSP says damage was caused by excluded factors
As the applicant has established a prima facie claim, the FSP bears the onus of
establishing that, on the balance of probabilities, it is entitled to rely on a policy
exclusion to deny the claim.
Among other matters, the FSP says it is entitled to rely on exclusions under the
policy for:
the cost of repairing or replacing any part of the boat due to faults or errors in
design or construction;
loss or damage caused by wear and tear, deterioration and/or lack of
maintenance; or
claims arising as a result of the unseaworthiness of the boat.
In order to be entitled to deny the claim, the FSP must show that the proximate cause
of the damage to the applicant’s boat is one or more of the excluded factors referred
to above.
The proximate cause is the dominant, efficient or operative cause of the damage.
However, it is not required to be the sole cause or the last in time.
The identification of the proximate cause is a question of fact that depends on the
circumstances of each particular case.
Boat had significant construction defects
The available information establishes that the re were significant faults and errors
evident in the construction of the applicant’s boat .
The naval engineer (NA) appointed by the FSP to inspect the damage advised that
t he builder had applied ‘extremely poor and negligent building practice’ in assembling
the boat, which he described as having been built to a ‘very poor construction
standard’.
The marine surveyor (NJ) appointed by the applicant considered it highly unlikel y that
the boat had been built to commercial vessel standards.
NJ advised that, given the failure of the structure, the applicant may have a claim
against the builder on the basis that the boat was not fit for its intended use and/or
not of a marketable condition.
Among other matters, the experts identified the following issues:
poorly designed and fabricated core joints in the wet deck area and inadequate
attachments between the wet deck and the hull side; and
the use of large amounts of fairing bog in the laminate used on the starboard
side, which resulted in it having approximately 50% of the strength of the
laminate on the port side.
Case No: 434932 Determination Page 5 of 13
In his report, the FSP’s naval engineer (NA) stated that the boat builder appeared to
have used whatever left over material was available in order to complete the
construction of the boat, without regard to proper construction methods.
The applicant has provided a copy of the certificate of compliance for the design of
the boat (together with relevant plans), which was approved by the Queensland
Department of Transport in June 2009.
However, the available information (including the reports prepared by NA and NJ)
indicates that the boat was not in fact built to the approved design standards.
The boat did not have Australian B uilder Plates, which would have provided
information about its capabilities (and which NJ advised were required by law).
The applicant did not obtain a pre-purchase inspection of the boat by a qualified
marine surveyor before he purchased it in or around October 2013.
The FSP says the major structural damage to the boat sustained during its voyage
on 2 September 2014 occurred as a result of the errors in construction identified by
its naval engineer (NA).
The applicant acknowledges that there were deficiencies in the construction of the
boat. However, he says that while these issues contributed to the damage which
occurred in September 2014, they were not the proximate cause of that damage.
The applicant says the proximate cause of the damage was the severe storm
conditions experienced during the voyage from Coffs Harbour to the Gold Coast. He
says that, while the construction inadequacies made the boat more susceptible to
failure in the event of rough seas, these inadequacies did not of themselves cause
the damage.
Parties dispute severity of storm conditions
As outlined above, the applicant says the proximate cause of the damage to the boat
was the storm conditions experienced on 2 September 2014.
The applicant has provided copies of statutory declarations by the skipper (MJ) and
crew member (WS) who were engaged to sail the boat from Coffs Harbour to the
Gold Coast on 2 September 2014.
In his statutory declaration, MJ states that:
the weather forecast was for northerly winds shifting to a southerly direction
later in the day;
during the initial stages of the journey, the boat encountered moderate seas
with northerly head winds;
as the afternoon progressed, the northerly winds did not abate but instead
intensified;
approximately 5 hours into journey, the vehicle lost electrical power; and
towards mid-afternoon, the northerly winds intensified to a full blown storm with
swells to a height of approximately 4 metres.
The information provided by WS in his statutory declaration is broadly similar.
Case No: 434932 Determination Page 6 of 13
It appears that neither MJ nor WS kept any contemporaneous records of the weather
conditions (such as vessel log books).
The FSP disputes that the storm conditions were as severe as described by MJ and
WS in their statutory declarations (which the FSP notes were made over a year after
the relevant events occurred).
The FSP notes that the information provided by MJ and WS is inconsistent with that
reportedly provided by the crew to the FSP’s investigator during interviews carried
out in October 2014.
The report prepared by the investigator indicates MJ advised that the height of the
waves did not exceed two metres at the time he first noticed water entering the boat
approximately 5 hours into the journey (around 10:00am or 11:00am).
However, the FSP has been unable to provide a recording or transcript of the
interviews with the crew, as MJ and WS apparently requested that they not be
recorded.
The FSP has provided copies of information from the Bureau of Meteorology weather
station at Coolangatta, which is in the vicinity of the area where the boat was
recovered with the assistance of marine recovery personal.
This data indicates that the maximum northerly wind experienced at Coolangatta on
2 September 2014 did not exceed 46 kilometres per hour (which the FSP’s mari ne
assessor advised would not even be classified as a ‘strong wind’).
The FSP has also provided copies of data derived from weather stations along the
coast which suggests that the waves did not reach the heights of 4 metres described
by the crew.
Finally, the FSP has referred to the record of the recovery operation completed by
the marine rescue personnel during the evening of 2 September 2014. This report
describes the wind as northerly, the weather as clear and the seas as ‘Moderate’ (as
opposed to ‘Calm’ or ‘Rough’).
Construction errors were proximate cause of loss
Having carefully reviewed the available information, the panel considers that, on the
balance of probabilities, the proximate cause of the damage to the applicant’s boat
was the significant errors in construction identified by the relevant experts.
As outlined above, both the FSP’s naval engineer (NA) and the applicant’s marine
surveyor considered these errors were so serious as to amount to potential
negligence and to make the boat unfit for its intended purpose.
In his report, the FSP’s naval engineer (NA) concluded that the structural damage to
the boat had occurred due to the poor construction practices adopted by the builder,
which caused the inadequate starboard laminate and poorly constructed connections
to become stressed and overloaded.
In particular, NA noted that the relatively straight cracks in the hull had occurred
where there was a change in core thickness and due to the core panels having been
Case No: 434932 Determination Page 7 of 13
butt joined, rather than scarf joined (which is the appropriate technique for joining
panels of differing thickness).
The panel considers that, as a naval engineer, NA is appropriately qualified to
determine the cause of the damage to the boat.
The panel considers NA’s report provides a lo gical and rational explanation of how
the damage occurred which is consistent with the observed facts. The photographs
included in NA’s report clearly show the construction deficiencies he identified and
establish a causative link with the loss which occurred.
As outlined above, the applicant’s marine surveyor (NJ) also indicated that the
manner in which the structural failure had occurred suggested the boat was not fit for
its intended purpose when originally constructed.
The applicant says the FSP has given insufficient weight to the effects of the severe
storm conditions experienced on 2 September 2014. He notes that NA’s comment
that the boat should have been able to easily handle the weather conditions was
based on the assumption that the waves did not exceed 2 metres.
Having carefully reviewed the available information, the panel is not satisfied that the
weather conditions experienced when the boat first sustained damage to the hull
were so severe as to represent the proximate cause of the loss.
In his statutory declaration, the skipper (MJ) states that the vehicle lost electrical
power approximately 5 hours after the boat commenced its journey (ie mid-morning).
The expert evidence suggests that the loss of electrical power was due to water
entering the internal areas of the boat due to fractures in the hull.
This is consistent with the account of events provided by MJ to the FSP’s investigator
(as reflected in the investigator’s report), which suggests that water was found in the
VIP cabin and engine room approximately 6 hours into the journey.
However, MJ’s statutory declaration indicates that the weather remained moderate
and the winds did not intensify until later in the afternoon (by which time it appears
the initial damage had already occurred).
Accordingly, based on MJ’s statutory declaration alone, the panel is not satisfied that
the structural damage to the boat was caused by the storm.
Further, the panel considers that, taken as a whole, the independent meteorological
observations tend to sup port the FSP’s position that the storm was not so severe as
to have caused the observed damage to the boat, absent the construction faults.
The meteorological observations are not necessarily conclusive, given the potential
for variations in weather conditions to occur at different locations.
However, the panel has also had regard to the absence of any reference to severe
weather conditions in the report prepared by the marine recovery personnel. Had the
damage to the boat occurred during a severe storm, it seems likely this would have
been noted.
Case No: 434932 Determination Page 8 of 13
Further, the FSP’s claim records reflect that, when the applicant’s broker first called
the FSP to notify of the claim on 3 September 2014, he advised that the boat had
suffered cracking damage to the hull, with the cause unknown.
The claim form signed by the applicant the following day stated that the damage had
occurred after the boat hit something in the water (assumed to be a whale). However,
this alternative explanation for the damage is inconsistent with subsequent
inspections of the boat, which did not identify any signs of impact damage to the hull.
Given the extent of the damage to the boat, it appears unlikely that, had a significant
storm occurred, this would not have been mentioned by either the broker or the
applicant himself.
The applicant says it is illogical to conclude that the damage was caused by
construction defect, given the boat had previously performed well in normal weather
conditions
However, at the time the damage occurred, the boat had experienced minimal sailing
time despite being four years old. When the applicant purchased the boat in October
2013, the engines had only 53 hours of usage. An additional 30 hours only were
added in the eleven months the applicant owed the boat (including the initial delivery
of the boat to Coffs Harbour).
Accordingly, it appears that for much of its life, the boat remained largely unused and
therefore had only minimal exposure to ordinary sailing conditions.
FSP is not liable for applicant’s claim
For the reasons outlined above, the panel considers that the proximate cause of the
damage to the boat was the acknowledged construction errors and deficiencies.
Accordingly, the FSP is entitled to rely on the policy exclusion for the costs of
repairing or replacing any part of the boat due to faults and errors in construction.
The panel notes that, even if the applicant were able to establish that the weather
conditions experienced on 2 September 2014 constituted a concurrent and
interdependent cause of the loss, the FSP would be entitled to deny the claim.
Where two concurrent proximate causes operate interdependently to cause a loss
and one of the proximate causes is excluded (while the other is insured), the insurer
is entitled to rely on the excluded cause to deny liability. This is known as the Wayne
Tank principle.
The panel has considered whether the damage to the applicant’s boat falls within the
cover for latent defect provided under the policy.
However, the policy definition of latent defect only extends to flaws in the material
used in the construction of the boat which would not have been discoverable by a
competent tradesperson carrying out an inspection.
In the present case, the panel is satisfied that the errors in the construction of the
boat which resulted in the claim damage extended beyond the material used in
construction, to the techniques and practices used in the construction of the boat.
Case No: 434932 Determination Page 9 of 13
Further, the applicant’s decision not to engage a surveyor to undertake a pre -
purchase inspection of the boat casts doubt over whether the relevant issues might
have been discoverable (particularly given the absence of Australian Building Plates).
On this basis, the panel considers the cover for latent defect does not apply.
The applicant has sought to rely on section 46 of the Insurance Contracts Act 1984
(Cth) (the ‘ICA’), to prevent the FSP from denying his claim, on the basis that he was
not aware (and could not reasonably have been aware) of the construction issues
with the boat.
The FSP says th e ICA does not apply to the applicant’s claim because the boat was
owned by a company, which the applicant has acknowledged was intended to be the
insured party under the policy. Section 9A of the ICA brings insurance policies for
pleasure craft within the scope of the ICA, where such craft are legally and
beneficially owned by individuals.
Even if the applicant’s policy falls within the scope of the ICA, section 46 would not
assist him.
Section 46 prevents an insurer from relying on a policy exclusion which operates by
reference to a defect in a thing which existed before the policy was taken out, in
circumstances where the insured was not aware (and a reasonable person in the
circumstances could not be expected to have been aware) of the defect at the time
the policy was taken out.
However, the courts have confirmed that section 46 only applies in circumstances
where the insurer relies on an exclusion which operates by reference to the time at
which the relevant defect arose – that is, where the exclusion expressly refers to the
defect having been present before the policy was taken out.
The exclusion relied upon by the FSP in the present case applies to damage caused
by errors and faults in construction, irrespective of when these issues arose. As the
application of these exclusions does not depend on the relevant issues having been
present before the policy was taken out, section 46 would not operate to assist the
applicant.
For the reasons outlined above, the FSP is not liable for the applicant’s cla im.
2.2 Is the applicant entitled to any other amounts?
Applicant is not entitled to compensation for destructive testing
In order to investigate the cause of the damage to the boat, the FSP undertook
destructive testing with the applicant’s consent. This test ing included the removal of
four panels from the hull, so the composition of the panels could be tested.
Following completion of its investigations, the FSP arranged for the panels to be
reinstated and repairs carried out to the surrounding areas (at a cost of $8,703.49).
In the course of his submissions, the applicant has expressed concern that the FSP
did not fully re-laminate the internal panels after they were replaced. He says that, as
a result, the panels would not be compliant with commercial specifications.
Case No: 434932 Determination Page 10 of 13
The FSP’s marine assessor has advised that, given the extent of damage to the
surrounding areas, it would be impractical to re-laminate these areas.
The available information establishes that the boat is effectively a total loss, as the
anticipated cost of repairing the damage plus the estimated salvage value ($100,000)
exceeds its market value.
Further, for the reasons outlined above, it appears unlikely that, when originally
constructed, the boat complied with applicable requirements.
On this basis, the panel considers that any loss suffered by the applicant as a result
of the FSP’s failure to re -laminate the panels is immaterial.
Further, the panel notes that the FSP has incurred significant expenses in funding
the storage costs for the boat, since it initially denied liability for the applicant’s claim
in late 2014.
In these circumstances, the panel does not consider that the applicant should be
entitled to any amount as a result of the FSP’s failure to re -laminate the panels.
2.3 FSP managed claim reasonably overall
Claim delays were not unreasonable
The applicant is dissatisfied with the manner in which the FSP handled his claim. In
particular, he says the FSP unreasonably delayed finalising the claim.
While it took several months to finalise the applicant’s claim, the panel considers this
period was not unreasonable, having regard to the complexity of the claim and the
issues involved.
After the claim was lodged in early September 2014, it took just under four months
for the FSP to complete its assessment of the claim and advise the applicant of the
outcome.
During this period, the FSP engaged an investigator to obtain further information
about the circumstances in which the claim arose. The boat was also inspected by
the FSP’s marine assessor and its naval engineer (as well as the applicant’s marine
surveyor).
The bulk of the delays experienced during this period occurred as a result of the
need to have the laminate samples tested by an independent university laboratory, at
on the recommendation of the FSP’s naval engineer (NA). NA advised that such
tests were necessary in order to fully understand the reasons for the structural failure
of the hull.
The FSP also spent some time trying to extract information from the boat’s plotters,
although these efforts were ultimately abandoned and do not appear to have caused
any additional delay.
Having regard to the specialist nature of the investigations required, the panel
considers the time taken to resolve the claim was not unreasonable in the
Case No: 434932 Determination Page 11 of 13
circumstances. The investigations undertaken by the FSP were necessary in order to
accurately identify the cause of the observed damage.
For the reasons outlined above, the panel does not consider the circumstances
justify the award of compensation.
Case No: 434932 Determination Page 12 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this dispute based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous Financial Ombudsman Service (FOS) decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
The applicant is a proprietary company which is the registered owner of the boat. For
the purposes of this determination, the company and its sole director and
sh areholder (MC) are referred to collectively as ‘the applicant’.
During the course of this dispute, the applicant has been represented by a solicitor.
Submissions made by the applicant’s solicitor have been treated as if they have been
made by the applicant.
3.2 Terms of Reference
Parties have consented to FOS jurisdiction
The applicant’s boat was insured under the policy for its market value immediately
prior to the incident on 2 September 2014.
The applicant has advised that he purchased the boat for cash and non-cash
consideration totalling approximately $1 million. He estimates the pre-incident value
of the boat was approximately $850,000.
The available information indicates that the cost of repairing the damage to the boat
exceeds its pre-incident value. Accordingly, the applicant seeks cover for the amount
of $850,000 (less the estimated salvage value of $100,000).
The value of the applicant’s claim exceeds $500,000, being the maximum value of
claims which may be considered by FOS (pursuant to sub -paragraph 5.1(o) of the
FOS Terms of Reference (the TOR)).
However, paragraph 4.4 of the TOR provides that, notwithstanding any other
paragraph, FPS may consider a dispute where both parties to the dispute and FOS
so agree.
Case No: 434932 Determination Page 13 of 13
In the present case, the FSP and the applicant have consented to the dispute being
considered by FOS, and FOS has agreed to consider the dispute on this basis.
3.3 Terms of policy
Subject Terms
Cover for
accidental loss or
damage
Wh at We c over
We will cover You, for Accidental Loss, Damage. Fire and/or Explosion and
Theft to Your Boat which occurs during the Period of Insurance …
We will cover Your Boat …. for Latent Defect ….
‘Accidental Loss or Damage’ means physical loss and/or damage which
occurs by accident. An accident is a happening th at is unforeseen and
unintended by You.
‘Latent Defect’ Any flaw in the material used in the construction of the Boat
that has now become evident and would not have been discoverable by a
competent tradesperson carrying out an inspection.
Accidental
damage -
exclusions
What We don’t cover
We will not cover You: …
For loss or damage caused by wear and tear, deterioration, vermin,
corrosion, electrolysis, mould, inherent vice and/or, lack of maintenance …
For the cost of repairing or replacing any part of Your Boat due to fault or
error in design or construction …
For the cost of improving or alt ering Your Boat …
General
exclusions
These exclusions appl y to all Sections of the Policy …
Boat condition
Any claim caused by or arising as a result of the unseaworthiness, lack of
repair or maintenance of Your Boat …
Safeguard
Any claim for loss or damage caused by or arising as a result of the lack of
reasonable care, protection and/or security of Your Boat …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.