Text of the determination
Determination
Case No: 434885 Determination Page 1 of 9
Case number: 434885 4 September 2017
1 Overview
1.1 Dispute
The applicants represent the body corporate insured under a residential strata
insurance plan held with the financial services provider (FSP). They lodged a claim
for damage to the unit complex from a hailstorm which occurred in November 2014.
The FSP accepted the claim for damage to various areas of the complex, including to
one roof section (section B); but it denied the claim in respect of the remaining roof
area (sections A and C). That was because, even though sections A and C had also
suffered hail damage, the FSP said those sections had significant pre-existing
damage and were already at the end of their serviceable life at the time of the storm.
The applicants do not accept that. They believe the FSP should cover the repair of all
the hail-damaged areas of what they say was an otherwise functional roof. They also
say additional costs have been incurred for other related damage to the property.
1.2 Issue and key findings
Is the FSP liable for the damage to the remaining sections of the roof?
The evidence shows that all sections of the roof sustained accidental hail damage.
Under the terms of the policy, the FSP is liable for that damage, and for other
damage and costs reasonably attributable to the hailstorm.
Despite the pre-existing condition of sections A and C, those areas of the roof were,
on balance, still functional and did suffer further damage from the hailstorm, which is
more likely than not to have reduced their serviceable life.
1.3 Determination
This determination is substantially in favour of the applicants. The FSP is required to
cash settle the claim based on the amount equal to 60% of the costs of replacing roof
sections A and C, and (if it has not already been paid) the full cost of replacing
section B. These amounts are to be determined by a current quote to be obtained by
the FSP from an appropriately qualified builder. In the total cash settlement amount
for the roof, the FSP is required to include relevant benefits payable under the policy,
and allow for the considerations set out in section 2.1 of this determination.
The FSP is also required to reimburse the $2,350 repair costs incurred by the insured
for what was more likely than not hailstorm-related damage, together with statutory
interest on that amount.
Case No: 434885 Determination Page 2 of 9
2 Reasons for determination
There has been a full exchange of material between the parties, and each party has
had the opportunity to address the issues arising from that.
Due to the complexities involved in this dispute, it has been referred to a panel for
determination.
This determination follows consideration of all the information exchanged, and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
previous FOS decisions where applicable.
2.1 Is the FSP liable for the damage to remaining sections of the roof?
Applicants have established a prima facie claim for accidental damage
The policy provides cover for ‘ accidental loss or damage ’ to the insured property,
subject to certain terms and conditions.
The FSP has not disputed there was, during the period of insurance, a severe storm
event with hail or that it caused damage to all sections of the roof, as well as to other
parts of the property.
On the available evidence, the panel is satisfied that the applicants have established
a prima facie claim under the policy for accidental damage arising from a storm.
So, in seeking to decline the claim, the FSP must show, on balance, that exclusions
apply or that it is otherwise entitled to do so.
FSP says damage was pre-existing and/or caused by excluded factors
Building consultants, M, engaged by the FSP, identified essentially the same type
and degree of hail damage to all sections of the roof.
Based on M’s reports, the FSP accepted liability for one damaged section of the roof
(section B). That was because that section had been replaced a few years earlier
and was in good condition with no rust or corrosion when the storm event occurred,
which meant the hail impact damage had reduced its life expectancy.
The FSP, however, denied liability for damage to the remaining sections A and C of
the roof on the basis that the cause of those losses was the pre-existing deterioration
and dilapidation of the roof sections, rather than the storm event.
The FSP relies on M’s reports, which say that sections A and C were about 40 -50
years old, heavily rusted/corroded (the roof sheets and the perimeter capping) and
had previous repairs, which meant the serviceable life of these roof sections had
already ended. M concluded the value of sections A and C was not reduced by the
hail impact indentations, as they needed replacement even before the hailstorm
event.
The FSP submitted that it was therefore entitled to decline the claim because the
damage to those sections was present before the storm, and caused by factors
Case No: 434885 Determination Page 3 of 9
which are excluded under the policy, including gradual deterioration, rust, corrosion,
and wear and tear.
The FSP also originally suggested that there had been a failure by the insured to
maintain the property in a good state of repair. However, the panel considers the
available evidence (including the financial records provided by the body corporate
manager, showing expenditure on the building over a number of years) reasonably
indicates appropriate steps were being taken to maintain the property.
The applicants say sections A and C were in good condition and had no leaks before
the storm. They say that the body corporate had obtained a report from
builder/building inspector, BM, in September 2013 to report on the structural
soundness of the property and help the body corporate to identify maintenance
funding.
With regard to the state of the r oof at that time, BM reports ‘[some] sections have
been replaced. All I noted was a lot of surface rust, paint roof as soon as possible. If
ever replacing roof use anticon sarking under the new iron’. There is no
recommendation in that report for immediate or even medium term replacement of
the roof, no question of the continued viability of the roof, and the rust is not identified
as posing risks that could not be managed by painting it.
There was no inspection of the roof directly after the storm when the claim was
made. The first inspection was on 17 December 2014 by a roofing contractor,
arranged on behalf of the FSP by C, which had been engaged to undertake make-
safe repairs and provide a scope of works for repairs. In its report of January 2015, C
al so identified ‘surface rust’ but concluded ‘[we] do not believe the rust to the roofing
sheets has contributed to the damage’.
As to the cause of the damage, C stated:
‘this is a flat roof area with a minimal amount of fall and combined with the torrent ial rain…the
water and hail has backed up the gutter systems causing them to overflow and where we
believe a capillary action has occurred where the water has run back on the underside of the
roof sheets therefore entering the inside of the units’ [sic].
M summarises the damage to sections A and C from the hail storm as being the
same as for the previously replaced and uncorroded section B: ‘extensively impacted
causing minor and major indentations to the roof areas, including deformation of
laps’.
The FSP has also provided a copy of a technical bulletin issued by the manufacturer
of the metal roofing sheets. This indicates that generally hailstones do not affect the
life of such a roof, but that:
‘The only potential areas of concern will arise from:
1. Low pitched roofs with significant hail indentations occurring within the pans leading to
ponding and dirt accumulation which may promote corrosion.
2. Roofs where sheet overlaps have been significantly deformed, the anti-capillary effect can
be lost and wate r could be drawn into the sheet lap resulting in corrosion.’
Each of section B and sections A and C was identified by M as suffering the type of
damage referred to in the bulletin, and the evidence indicates that all three sections
of roof had the same pitch. So although the FSP has sought to differentiate section B
(from A and C) on the basis of its better pre-existing condition and therefore likely
Case No: 434885 Determination Page 4 of 9
remaining life, the panel considers the hail indentations suffered across all areas of
this low pitched roof would promote further corrosion in any case; as would the anti-
capillary effect (already referred to by C) that might be expected where sheet
overlaps have been significantly deformed.
So while the FSP said that if sections A and C of the roof had been ‘in an appropriate
condition, the resultant damage would not have occurred’, the panel is not persuaded
that the evidence supports this blanket conclusion. Nor does the panel accept the
FSP’s argument that just because section B had already been replaced some years
before the hail event, then it follows that sections A and C were also automatically
due for replacement.
Even though the NearMaps photos and those taken by M do show large areas of rust
on sections A and C, the evidence overall does not indicate it was more than
superficial, and the most obvious areas appear reasonably localised. There were no
holes identified, even in areas where there had been hail impact over rust.
The evidence of previous repairs which M points to does not, in itself, mea n there
were current problems with the integrity or functionality of the roof at the time of the
hail storm; it can only reasonably be taken to indicate earlier issues had occurred and
been dealt with, consistent with the insured’s obligation to maintain t he property. This
is reflected in the body corporate manager’s comprehensive statement of
expenditure, for the period from February 2002 up to September 2016, which
identifies a range of services provided by plumbers/roofing specialists.
Proximate cause of loss and damage was the hailstorm
The applicants argue that the proximate cause of the damage to the roof (and the
resulting water leaks) was the hailstorm.
It is well-established law that a proximate cause is not necessarily the first or last or
the sole cause of the loss. It is the effective, dominant or operative cause. The courts
have said that if one cause would have resulted in the harm in any case, and the
other would not have done so in the absence of the first, then the first is the
proximate cause.
The panel acknowledges that there may be circumstances where it is reasonable to
conclude that there were two causes which were equal or concurrent in their
efficiency in bringing about the damage. If one of those causes was an insured event,
and the other an excluded event, then the excluded event would prevail.
However, as explained, the panel is not satisfied the FSP has shown, on balance,
that any factors excluded under the policy (such as gradual deterioration, lack of
maintenance, wear and tear or corrosion) were the sole – or an equal concurrent –
cause of the loss or damage to sections A and C, or that they should apply to defeat
the claim.
The panel considers, on balance, that the damage to sections A and C of the roof
(and any resulting water damage inside the building) would not have happened if not
for the hailstorm, which was, therefore, the proximate cause of the loss.
Case No: 434885 Determination Page 5 of 9
FSP is partly liable for hail damage to sections A and C of roof
However, the panel considers that t he FSP’s liability for the costs of replacing these
damaged roof sections should be discounted to take account of their relatively poor
condition at the time of the storm, when compared to section B.
On this basis, the panel considers it is fair in all the circumstances that the FSP be
required to cash settle the applicants for 60% of the costs of replacing sections A and
C of the roof. This amount should be determined based on a quotation to be obtained
by the FSP from an appropriately qualified builder, a nd take proper account of all
relevant considerations, and associated benefits to which the applicants are entitled
under the policy in relation to such replacement work (such as removal of debris and
home warranty insurance, if applicable).
Those relevant considerations should also include, for example, associated costs for
disconnecting and reconnecting services, as well as an allowance for the possibility
of other damage being identified and requiring repair in the course of or as a result of
the replacement. (This is as broadly contemplated in C ’s quote dated 14 September
2015 in respect of the removal and replacement of section B . That quote specifically
referred to the need to allow for the possibility of other unforeseen circumstances or
damage, not visible at the time of inspection, being revealed once storm-affected
areas were exposed during repair work.)
The FSP submits that it is not required under the policy to pay for any loss insured
where it would effectively result in ‘betterment’ (that is, where repairs or replacement
would result in the property being in a better or more valuable condition than it was
before the loss).
The panel notes the policy does say that in situations where the FSP wishes to carry
out necessary works itself but the insured does not want that to occur, then the FSP
will only pay ‘indemnity value’. That is defined in the policy as being the cost to
rebuild, replace or repair property to ‘a condition which is equivalent to or
substantially the same as but not better nor more extensive than its condition at the
time of the loss taking into consideration age, condition and remaining useful life ’.
However, the policy also provides that the FSP’s obligation in respect of
‘replacement’ under the policy is to cover ‘the reasonable cost of rebuilding, replacing
or repairing to a condition which is equivalent to or substantially the same as but not
better nor more extensive than when it was new ’ (p anel’s underlining ).
Under the circumstances of this particular case, the panel considers that the relevant
point of reference in determining the reasonable cost payable for the roof repairs
should be the cost of ‘replacement’ with new roofing as at the time of replacement.
FSP is liable in full for hail damage to section B of roof
The panel understands that, because of this dispute, the replacement of section B of
the roof has not yet happened, nor has there been a cash settlement (based on C’s
quote of September 2015 for that work). That means it is likely that the figure as
quoted by C will no longer be sufficient to reasonably satisfy the FSP’s liability with
regard to section B.
Case No: 434885 Determination Page 6 of 9
Under the circumstances, it is fair that the new quote to be obtained for the roof
should include the work needed for section B. The quote sho uld clearly identify the
amount that applies to section B, as the FSP is fully liable for that component of it.
FSP is responsible for other storm-related damage
The FSP has provided invoices for claim-related work it carried out in February 2015
to various parts of the property, including work to the ceilings and walls in unit 6.
The applicants say the body corporate undertook other repairs itself following the
storm, as a temporary remedy for leaks from the roof which had occurred after that
event. They believe the FSP should cover those costs.
The body corporate statement of expenditure confirms the following expenses:
December 2014 - $350 for roof repairs
September 2015 - $770 for roof repairs L6
February 2016 - $550 for roof repairs L6
February 2016 - $680 for roof repairs L6.
The applicants have also more recently said that there is ongoing damage to the
ceiling in unit 6, with significant water leaks still occurring . The photographs provided
show evidence of mould and damage.
The FSP believes the roof was leaking before the storm event. However, the body
corporate management records only identify one previous repair for a leak into unit 6
in January 2010. The applicants have said leaks have not otherwise been an issue.
It is now over two ye ars since the hailstorm. Given the ‘potential areas of concern’ for
low-pitched roofs significantly affected by hail damage (as identified in the
manufacturer’s technical bulletin), it is reasonably likely that all roof sections will have
deteriorated to some extent in that time. So it is possible that the further damage now
reported by the applicants is the result of a combination of the initial storm -related
issues (for which permanent repairs have not been carried out) and other progressive
damage to the roof.
The panel accepts that the $350 repair cost incurred soon after the hail event
(explained as being for paint and liquid membrane to block the leak, designed to be
temporary, in expectation of a new roof) can reasonably be attributed to damage
from that event.
As well, the evidence taken as a whole suggests the other costs for ‘roof repairs L6’
listed above are more likely than not for issues caused by the hailstorm. That is
because, even though those repairs were not carried out until some time af ter the
storm event, it is accepted that hail damage had compromised the entire roof area,
unit 6 had previously been identified as being specifically affected, and no significant
repair work had been able to be carried out to the roof itself to prevent ongoing
problems or recurrences.
The panel is satisfied it is reasonable in the particular circumstances that the FSP
pay the full cost of the listed repairs ($2,350), together with interest at the statutory
Case No: 434885 Determination Page 7 of 9
rate calculated from the date the applicants paid for these costs to the date of
settlement.
However, while the applicants have understandably been waiting for resolution of
their dispute to enable all repairs to be finalised, they still do have the responsibility to
mitigate their losses in the meantime. There is only limited information about the
more recent damage in unit 6, raised after this dispute was brought to the Service,
and it is not clear to what extent it might have been exacerbated by delays in dealing
with it, or contributed to by other issues.
The panel is not persuaded, based on the available evidence at this time, it is fair for
the FSP to be held responsible for that without the opportunity to investigate further.
Case No: 434885 Determination Page 8 of 9
3 Supporting information
3.1 Policy wording
Page Extract
25 Exclusions - what we do not insure
1. We will not pay for loss or damage:
c. caused by lack of maintenance, rust, oxidation,
corrosion, Wear, Tear, … , gradual corrosion or
gradual deterioration…or failure to maintain Your
Insured P roperty in a reasonably good state of repair .
13 Wear, T ear
means damage or a reduction in value through age, ordinary
use or lack of maintenance
13 Replacement means:
a. the reasonable cost of rebuilding, replacing or
repairing to a condition which is equivalent to or
substantially the same as but not better nor more
extensive than when it was new
27 Claims – how we settle your claim
1 Replacement
If Your Insured Property is damaged, We may choose to
e ither rebuild, replace, repair or pay the amount it would cost
to rebuild, replace or repair.
The amount We pay under Policy 1 will be the cost of
Replacement at the time of Replacement…
Case No: 434885 Determination Page 9 of 9
3.2 Experts’ reports
Experts’ reports Key points
FSP’s expert (M)
Roofing report
16 June 2015
r oof sheets to roof sections A and C are well - aged,
weathered and showing visible signs of long term rusting and
corrosion to the pans and ribbing; visible indentations were
also observed typically to the pans and ribbing
r oof sheets to roof section B are generally free of corrosion;
but visible indentations were observed typically to the pans
and ribbing
some parts of sections A and C have been painted with a
liquid membrane presumably to prevent water ingress into
the roof
typically throughout roof secti ons A, B and C areas of hail
scuff/splatter marks were observed where no indentations
had been made
FSP’s loss adjuster (E)
Report 1
12 January 2015
identified roof damage, amongst other damage
FSP’s expert (C)
Report/Scope of Work
13 January 2015
our roofing contractor noted that hail damage has occurred to
the roofing sheets, it was also noted that there was surface
rust through out [sic] some of the roofing sheets
w e do not believe the rust to the roofing sheets has
contributed to the damage
thi s is a flat roof area with a minimal amount of fall and
combined with the torrential rain…the water and hail has
backed up the gutter systems causing them to overflow and
where we believe a capillary action has occurred where the
water has run back on the underside of the roof sheets
therefore entering the inside of the units
FSP’s loss adjuster (E)
Report 3
9 August 2015
summarised M’s first report as saying that ‘Roofs A and C
have reached the end of their life expectancy ’
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.