Determination 434733

Storm damage to stormwater pipe and landscaping denied and claim decision delayed

FirmFinancial Firm (Unknown - Insurer)
Decided2017-08-02
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$13,500
Non-financial loss$500
Amount claimed$26,350
SourceAFCA PDF

Summary

A body corporate claimed for storm damage to a stormwater pipe and landscaping, and the FSP denied both. AFCA found the pipe damage covered and awarded $3,500, awarded $10,000 of the landscaping claim under the policy limit, and ordered $500 non-financial loss for the slow claim decision.

The FSP did not prove a building defect or gradual damage exclusion applied, and the landscaping damage was accidental and covered under the additional benefit up to $10,000.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 434733 Determination Page 1 of 9 Case number: 434733 26 July 2017 1 Overview 1.1 Dispute The applicant is a body corporate for a unit complex located in Brisbane (the property). The applicant has insured the property under a residential strata insurance policy (the policy) with the financial services provider (the FSP). There is no dispute between the parties a severe storm occurred on 27 November 2014. The applicant made a claim under the policy for damage caused by the storm. The FSP accepted damage to roof tiles was covered under the policy. However, the FSP denied damage caused to a storm water pipe and damage to landscaping. The FSP denied the claim on the basis the concrete thrust block where the storm water pipe failed was poorly maintained, did not comply with the relevant building standard and because the damage occurred gradually over time. The FSP also says the erosion of the river rocks and supporting material and logs and baffles was not covered u nder the “Landscaping” Additional Benefit in the policy. The applicant argues the policy responds to the claims and also complains about the FSP‟s claims handling and the lack of timeliness and provision of certain information. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was substantially in favour of the applicant. The applicant accepted the recommendation, on certain terms, but as the recommendation was not accepted by the FSP, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP entitled to deny the claim to repair the stormwater pipe? The material provided establishes on the balance of probabilities a prima facie claim because the damage to the stormwater pipe was unintended and unexpected and is therefore covered under the policy which covers accidental damage. The material provided does not establish on the balance of probabilities the pipe was damaged because of a building defect. Therefore, the FSP is not entitled to rely on the policy exclusion to deny the claim. Case No: 434733 Determination Page 2 of 9 The FSP is not obliged to pay $1,000 for exploratory costs but is to pay to the applicant $3,500 to repair the stormwater pipe. Is the FSP entitled to deny the applicant’s claim for the lands caping? The FSP is not entitled to deny the applicant‟s claim for landscaping as the damage claimed was accidentally caused. Under an Additional Benefit, the policy provides up to $10,000 for the reasonable costs necessarily incurred in replacing or repairing damaged rockwork. The policy also provides an Additional Benefit for the cost of removal and disposal of debris. As the material provided establishes there was significant displacement of the rockwork which was held in place by the wooden structure; the supply and installation of stones and rocks behind the wooden structure was estimated at $10,500; and the applicant has not been indemnified pursuant to the Additional Benefit of removal of debris, it is fair in all the circumstances the FSP pay to the applicant $10,000 for this part of the applicant‟s claim. Is the applicant entitled to compensation? It is fair in the circumstances the FSP pay to the applicant compensation as the FSP took an unusual amount of time to make a claims decision. 1.3 Determination This determination is substantially in favour of the applicant. Should the applicant accept this determination, then within seven days of acceptance, the FSP is to make the following payments to the applicant:  $3,500 for the claim to repair the storm water pipe  $10,000 being the policy limit for repair or replacement of damaged landscaping  $500 compensation for non-financial loss The FSP is not otherwise required to take any further action in relation to the claim or the dispute. Case No: 434733 Determination Page 3 of 9 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only More photographs were provided after the recommendation After the recommendation was rejected, both parties made further submissions and the applicant provided photographs. Where appropriate, the submissions are referred to in the determination. 2.1 Is the FSP is entitled to deny the applicant’s claim to repair the storm water pipe? Applicant must establish a prima facie claim In March 2015, the applicant lodged a claim claiming hail and storm damage as a result of a storm on 27 November 2014. The claim relating to the hail damaged roof tiles has been settled by the FSP. Attached to the claim form were photographs and a quote from EZ: The quote includes the following costs:  repair to the storm water pipe $3,500  installation of retaining wall baffles $16,600  installation of retaining wall $6,250 The applicant must establish on the balance of probabilities it has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP‟s policy covers accidental loss or damage to the insured building and common area contents which occurs during the period of insurance. The FSP‟s assessor inspected the property on 31 March 2015. In his first report, he says there was a severe storm with associated hail, extreme winds and torrential rain which passed through Brisbane on 27 November 2014. At the time of inspection, the assessor says he saw resultant damage to the terraced landscaping along the western elevation of the property. He described the work which needed to be done including removal of damaged timber retaining steps, and rebuilding of the landscape. Case No: 434733 Determination Page 4 of 9 He engaged a builder to report about whether the storm pipe burst due to the volume of rain or whether there was a pre-existing defect. Damage claimed was unintended and unexpected The policy does not define accidental damage. Accidental damage has been judicially interpreted to mean damage which is unintended and unexpected. Having considered the material provided, i n particular the numerous photographs, I am satisfied the damage to the claimed items was unintended and unexpected. In the circumstances, I am satisfied the applicant has established a prima facie claim. FSP must establish an exclusion applies Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. As for the repair to the storm water pipe, the FSP relies on a policy term which allows it to limit its indemnity to an insured for exploratory costs and replacement of defective parts in the amount of $1,000. Otherwise, it says it is not liable to indemnify an insured any further if the pipe burst, leaked, discharged or overflowed because of a building defect. The FSP relies on a builder‟s report. It submits the claimed damage to the thrust block of the storm water pipe was weathered and non-compliant in both its installation and design. The FSP‟s builder inspected and photographed the pipe and provi ded a report in May 2015. The builder reported he saw a cracked section of concrete (which he described as the thrust block) around the connection to the pipes. The lower pipe had moved downward and away from the connect point. Upon inspection of the cracked concrete, the builder said the edges were weathered and discoloured and not recently damaged. The builder noted the other thrust box and concrete cell surrounds were intact. The builder also said the thickness of the concrete installed at the thrust block is insufficiently thick. He relied on a 2003 Australian Standard. However, he concedes: It is possible that due to the nature and volume of hail and water which entered the pipe at the head (top) of the drain and the force at which the water/hail flowed down this pipe has caused the two pipes to separate…” But he doubts if the correct size thrust block had been installed, the join would have separated. The applicant contends the volume of the water within the pipe coupled with packed ice was too stressful at the first join in the pipe so the join split and fractured the thrust block. Case No: 434733 Determination Page 5 of 9 Builder’s report insufficiently persuasive to establish an exclusion applies Although I acknowledge the applicant has provided no expert report, I have carefully considered the photographs provided and the dramatic description of the storm event. I note the FSP does not dispute the storm event was severe. I have also taken into ac count the applicant‟s submission that the insured complex was built in 1997 pursuant to requisite architectural and engineering plans and specifications and yet the FSP‟s expert relies on a 2003 Australian Standard. Furthermore, although the FSP‟s builder notes the concrete appeared to be weathered and discoloured and not freshly exposed, he photographed and inspected the property on 20 May 2015, some six months after the storm event. On the information provided, I am not satisfied the FSP has established o n the balance of probabilities the damage to the pipe and to the thrust block was caused by a building defect. I am not satisfied the FSP can rely on a policy exclusion to deny the claim. The applicant has provided a quote for the cost to repair the storm water pipe. The quote says the extent of damage cannot be ascertained without more extensive evaluation and a PC amount of $3,500 was allowed. The FSP has provided no material about the cost of repairs. The FSP has paid $1,000 exploratory costs. The applicant is holding the cheque. The exploratory costs indemnify an insured to locate the source of a burst or leaking pipe. In this dispute, the applicant has located the source of the burst or leaking pipe. On the information provided, I consider it is fair in all the circumstances the FSP cancel the $1,000 cheque and pay to the applicant $3,500 for the applicant‟s claim to repair the stormwater pipe. 2.2 Is the FSP is entitled to deny the applicant’s claim for landscaping? The applicant claims for the installa tion of retaining wall baffles The applicant claims the installation of retaining wall baffles to the steep incline at the rear of the block in the amount of $16,600. The applicant also claims the installation of a retaining wall at the head of the incli ne in the amount of $6,250. As set out earlier in this determination, it is accepted the applicant has established a prima facie claim. The onus shifts to the FSP to establish the claimed damage was caused by lack of maintenance, wear and tear, gradual deterioration, failure to maintain the property in good repair, or earth movement or that part of the claim is betterment. The FSP notes the applicant‟s claim may not necessarily be for a retaining wall but rather the general landscaping of a steep decline. Having considered the photographs provided, I accept this interpretation. Case No: 434733 Determination Page 6 of 9 The FSP argues the policy Additional Benefit does not apply as it includes cover for replacing trees or rockwork but not timber designed to retain landscaping. The FSP also relies on comments made by the builder that the landscaping down the slope was free from vegetation and general landscaping. The builder also said the sleeper logs were weathered and aged and not well maintained. After the recommendation, the FSP argued the proximate cause of the damage to the landscaping was the gradual deterioration and/or erosion caused by a weathered and non-compliant thrust block and/or drainage pipe. However, as set out earlier in this determination, it is accepted the applicant has established a prima facie claim and it is not accepted the cause of damage was a defect in the pipe. Assessor confirms resultant damage and removal of debris The FSP‟s assessor noted the applicant had removed a great deal of debris from the bottom of the hill and around access to the lower units. The assessor confirmed the resultant damage to the terraced landscaping. He said the complex was neat and presentable and had no reason to doubt the explanation given of the extent of the damage resulting from the event. The assessor spoke with the contractor who provided the quote. The assessor said item 1 relates to the rectification of the landscaping and the contractor had confirmed the cost was to reinstate it as it was prior to the storm event. However in relation to item 2, the assessor said item 2 is betterment as the retaining wall did not exist at the time of the storm event. Additional Benefit 14 provides cover up to $10,000 Taking all matters into account, the assessor recommended the FSP pay $10,000 pursuant to Additional Benefit 14 of the policy. The FSP‟s policy provides cover for accidental loss and damage to the building and common area contents. Building and common area contents do not include: „plants, hedges, trees, shrubs, gravel, shale, stones, clay or soil on paths or driveways or tennis courts, soil or bark or mulch in gardens other than as covered under Special Benefit 14 of policy 1: Additional Benefit 14 says: “ 14 Landscaping We will pay up to $10,000 for the reasonable costs You or a Lot Owner necessarily incur in replacing or repairing damaged trees, shrubs, plants, lawns or rockwork at Your Situation lost or damaged by an Event claimable under Policy 1. ” Case No: 434733 Determination Page 7 of 9 Damage claimed was accidentally caused Both parties have provided numerous photographs of the damage claimed. In addition, the applicant described how the damage occurred. However the damage occurred, it is accepted the damage was accidentally caused. The material provided establishes it is probable excessive water flowed and displaced the wooden framework seen in the photographs and washed away river stones and rockwork which the applicant says was part of landscaping in the area. The applicant describes the structure. Before the storm event, the applicant says there were two parallel copper treated logs which were staked in place and then the logs were joined together by smaller timber batons which were covered by rocks. The applicant describes the rocks which covered the logs which in turn covered the pipe. The photographs provided show the structure described by the applicant. Some of the timber work appears to be in place. Some is disturbed. The photographs show a significant amount of displaced river stones. The policy provides up to $10,000 for the reasonable costs necessarily inc urred in replacing or repairing damaged trees or rockwork. EZ provided a breakdown of the supply and installation of the sleepers and the supply and installation of stones and rocks behind the sleepers. The breakup included the stones behind the sleepers in the amount of $10,500. On the information provided, I do not accept the damage was caused by excluded events relied on by the FSP. Furthermore, from the material provided, I am not satisfied the wooden structure described by the applicant is covered under the policy. However, under additional benefits, the policy provides for the cost of removal and disposal of debris. It appears the applicant has removed the debris but has not been indemnified by the FSP. While the policy does not provide cover for stones, under the Additional Benefit, cover is provided to replace or repair damaged rockwork lost or damage by an insured event. Having considered the photographs provided, I accept if there were trees, shrubs or plants in the vicinity of the area of damage, it is probable they would have been washed down the slope together with the other debris. Fair in all the circumstances the FSP pay the applicant $10,000 Having considered the significant displacement of the rockwork which was held in place by the wooden structure, and the application of the additional benefit which has not been addressed, I am satisfied it is fair in all the circumstances the FSP pay to the applicant $10,000 being the reasonable costs to supply and install the rockwork behind the sleepers. I am also satisfied it is fair in the circumstances that no policy excess is applied and no interest is payable on the amounts in the determination. After the recommendation, the FSP argued the current status of repairs is unknown and the scope is to be reassessed. However, as the claim was made in March 2015 and is still not resolved, and in view of the material provided by EZ to the FSP‟s Case No: 434733 Determination Page 8 of 9 assessor, I am satisfied it is fair in the circumstances to make a determination on the material provided. After the recommendation, the applicant argued for payment of other benefits including removal of debris, claim preparation costs, and costs associated with engineering and building consultancy reports. This determination has taken into account the additional benefit of removal of debris. The applicant has not incurred the cost of any consultants‟ reports. Claims preparation costs must be incurred with the written consent of the FSP. In any event, I am not satisfied claims preparation costs are applicable to the circumstances of this claim or dispute. 2.3 Is the applicant entitled to compensation? Compensation payable in some circumstances Under its Terms of Reference, FOS may decide the FSP is to compensate the applicant for non-financial loss (up to a cap of $3,000) but only where there is an unusual degree or extent of physical inconvenience and time taken to resolve the situation. The a pplicant complains about the FSP‟s claims handling. It contends decisions were not made and material not provided in a timely fashion. The FSP has not addressed this aspect of the dispute. The material provided shows the claim was made in March 2015 and assessed by the FSP‟s assessor and builder in May 2015. A decision to deny the claim was not made until November 2015. FOS takes a conservative approach to non-financial loss and considers an insured should be moderately robust and bear the normal degree o f inconvenience experienced when a problem arises. However, in the circumstances of this dispute, I am satisfied the FSP has not acted in a timely fashion due to the time taken to make a claims decision. I am satisfied it is fair in the circumstances the FSP pay to the applicant $500 compensation for non-financial loss. Case No: 434733 Determination Page 9 of 9 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the FSP‟s Notice of Response dated 2 6 February 2016. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Other relevant material considered and relied on  Parties‟ submissions and all attachments to submissions including emails, quotes, reports, and photographs  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.