Home / Financial Firm (Unknown - Insurer) / Determination 434033

Determination 434033

Escape of liquid claim denied for gradual leak from stormwater pipe

FirmFinancial Firm (Unknown - Insurer)
Decided2017-02-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's claim for subsidence from a leaking stormwater pipe was denied as the water escape was gradual, not sudden and unexpected. AFCA found in the FSP's favour, noting poor claim updates, and ordered no payment.

Cover for escape of liquid requires a sudden and unexpected escape, and the expert evidence showed the subsidence developed gradually over time.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 434033 Determination Page 1 of 7 Case number: 434033 7 February 2017 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for damage to his home after discovering a leaking pipe at his property. The FSP arranged for a builder and an engineer to inspect the damage and after considering their reports together with the terms of the policy, it denied liability for the applicant’s claim. The applicant disagrees with the FSP’s decision and say s:  the conclusions reached and information provided by the FSP’s engineer were incorrect  the FSP did not provide him with the current policy documents  the claim process was inexcusably slow and delayed. 1.2 Issues and key findings Did the FSP provide the 2013 Policy (PDS) to the applicant? The FSP can rely on the terms and conditions of the 2013 PDS as it has established, on the balance of probabilities, that it provided the applicant a copy of the 2013 PDS together with his renewal documentation in December 2013. Is the FSP entitled to deny the applicant’s claim ? The FSP is entitled to deny the claim because:  cover for damage caused by ‘escape of liquid’ is only available where the escape is sudden and unexpected  damage caused by gradual escape of liquid is e xcluded from cover. Is the applicant entitled to any other compensation? The applicant is not entitled to any other compensation. 1.3 Determination This Determination is in favour of the FSP The FSP is entitled to deny the applicant’s claim Case No: 434033 Determination Page 2 of 7 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. A recommendation was issued in this dispute that was in favour of the FSP. The applicant has rejected that recommendation. In rejecting the recommendation the applicant has made further submissions as to the circumstances of the claim and the application of the policy. Those submissions have been taken into account in reaching this determination. This determination follows consideration of all of the information available and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Did the FSP provide the applicant with the 2013 PDS The applicant disputes receiving the 2013 PDS and maintains in these circumstances the FSP must rely upon the wording of the original PDS from 2007. The FSP has provided details of its production and mailing processes, supported by a statutory declaration from its Underwriting Manager which sets out the documents and dispatch procedures which are managed by its mailing house. The procedures show that a number of documents were required to be included with the applicant’s renewal and that for that relevant day these procedures were completed fully by 23 December 2013 for the renewal on 17 January 2014. Although the applicant says that he did not received the PDS, or cannot recall receiving it, it appears more likely than not that the PDS was included with the renewal schedule and payment details, and dispatched to the applicant’s correct mailing address. I am satisfied the FSP sent the relevant PDS to the applicants last known address as required under Section 72A of the Insurance Contracts Act 1984 (the Act). I am satisfied the FSP has met its obligation to clearly inform the applicant of the terms applicable to his cover as from 17 January 2014. 2.2 Is the FSP entitled to deny the applicant’s claim? The policy provides cover for ‘escape of liquid’ in certain circumstances. The applicant’s policy provides cover for loss or damage arising out of any of the insured events listed in the policy documents. Each event is subject to certain conditions and exclusions. Relevantly, in this instance the insured event states: Case No: 434033 Determination Page 3 of 7 ‘ What is covered Your building and/or contents are covered for loss or damage caused by a sudden and unexpected escape of liquid from any:   Fixed wat er pipe  … What is not covered You are not covered under this Insured Event for:  loss or damage caus ed by any escape of liquid of which you were aware and failed to notify us within a reasonable period;  …  loss or damage caus ed by any gradual escape of liquid; ’ There is some inconsistency in the information provided as to when the applicant first noticed the leaking pipe. The reports from the FSP’s builder and engineer suggest it was first noticed in June/July 2014. The reports suggest the original builder referred the applicant to the insurer. The applicant maintains he first noticed a leaking pipe in the sub floor of his home under the deck area in late June/early July 2015. The applicant has provided photographs taken in August 2015 showing the damaged pipe. Subsequent photos taken by the FSP’s engineer on 22 December 2015 show the pipe taped. The applicant confirms he taped the pipe to prevent the leak. Damage a result of water leaking from storm water pipe. The applicants claim is that the damage arose from the sudden escape of water from the storm water pipe. Due to the issues involved the FSP arranged for a builder and engineer to attend the property to inspect the damage. Builder’s report The builder (AB) attended the property on 5 November 2015. He found that there was a sagging of the structure, the steel stumps were severely rusted and the concrete perimeter had sunk. He noted a cracked, suspended stormwater pipe in the sub-floor, which had been temporarily repaired with duct tape. He considered the damage was consistent with on-going water entry into the soil and recommended the appointment of an engineer. Engineer’s report Engineer GE attended the property on 22 December 2015. GE confirmed that the subsidence in the area had occurred as a result of water leaking from the stormwater pipe, which was also responsible for the rusted steel stumps. No evidence that damage caused by sudden and unexpected escape of liquid The applicant has challenged some of the statements made by the builder and the engineer with respect statements attributed to him, which he denies making, and some of the findings of the engineer. Case No: 434033 Determination Page 4 of 7 However, what is not disputed is that the suspended stormwater pipe had cracked and this has led to water being discharged into the ground causing subsidence damage and rusting of the steel stumps. The FSP believes the split pipe may have been leaking into the ground for up to 18 months (knowledge of which the applicant denies). It had been cracked and commenced leaking at least 5 months before a professional repair was carried out. The temporary application of duct tape is likely to have been relatively ineffective as a solution. The FSP submits that the escape of water over a period of time does not meet the threshold requirement of the in sured event, being ‘… a sudden and unexpected escape of liquid.’ The applicant disputes that saying that this would have been a major and rapid escape at the times when there is significant rainfall at the location, which is uncommon. I have considered thi s argument and in the absence of a definition for ‘sudden’ in the policy I must rely on the ordinary meaning of the word. The Macquarie Dictionary defines sudden as ‘1. happening, coming, made or done quickly, without warning or unexpectedly.’ I am satisfied that water has escaped from the cracked pipe over a period of time, although the actual period cannot be determined. I am mindful of the expert evidence which indicates that a single inundation of water is unlikely to have led to subsidence, and further that the noted rusting of the steel stumps is more likely to have developed over a longer period of time. These conclusions are not refuted by any alternative expert evidence. I have also looked at the relevant weather data. There does not appear to be any unusual weather event that could be said to have led to a sudden escape of water sufficient to cause the damage. I am not satisfied on the balance of probabilities that the damage was caused by the sudden and unexpected escape of liquid within the terms of cover under the policy. Other issues do not assist the applicant The applicant has challenged some of the statements made by the FSP’s experts, and as such says the FSP cannot rely on its exclusions. As no prima facie claim has been established, the FSP is not required to prove its exclusions, however for the sake of completeness I will deal with a number of those issues. The insured event of escape of liquid includes an exclusion noted above, that is, damage caused by a gradual escape of liquid. Again, in the absence of a policy definition, the Macquarie Dictionary defines this as ‘1. Taking place, changing, moving etc. by degrees or little by little’. Based on the expert evidence, it is unlikely that the subsidence of the building would have occurred as a result of a single event of escape of liquid, but rather would be a gradual process occurring over a period of time. The FSP has included a number of other exclusions in its denial, including failure to notify the FSP in a timely manner, defect and non-compliance. This appears to be a Case No: 434033 Determination Page 5 of 7 scatter-gun approach to denial and I am not persuaded that the FSP has established these exclusions. In any event these are no longer relevant. The applicant has also claimed for ‘Accidental Damage’ which provides a broader cover, However this does not assist the applicant as this event excludes accidental damage where the relevant event is provided or excluded under another insured event, in this instance escape of liquid. In any event, the policy contains a general exclusion concerning damage caused by ‘water including rainwater after it has disappeared beneath the surface of the land…’ 2.3 Is the applicant entitled to compensation? No compensation is payable Under paragraph 9.3 of the Terms of Reference compensation for non-financial loss of up to $3,000 may be awarded in circumstances where an applicant experiences an unusual degree of time taken or inconvenience when dealing with a claim. Having reviewed the chronology of the claim, I am not satisfied that the FSP’s handling of the claim was such that it unusually delayed the process, or that the time taken to undertake inspections by the builder and the engineer were excessive. Whilst there is dispute as to when the applicant first notified the FSP, the FSP’s claim notes indicate that the claim was first lodged on 5 November 2015. I accept at that time the FSP acted reasonably by appointing a builder to attend the property on the same day. The FSP did not however keep the applicant informed as to the progress of the claim in accordance with the relevant General Insurance Code of Practice. The claim notes do not reveal any contact with the applicant between 5 November 2015 and 15 December 2015. There was further delay from when the FSP received the engineering report until it notified the applicant of its decision. The FSP has not provided any explanation as to why it did not keep the applicant informed about the progress of his claim. I accept that the FSP should have contacted the applicant earlier. The applicant has complained that he expended a significant amount of his own time in pursuing his claim although he has provided no evidence as to the actual amount of time spent. Whilst I accept that the FSP did not keep the applicant informed I am not satisfied that the applicant has established an entitlement to compensation. The claim was properly investigated and relevant expert reports obtained with the final decision made in February 2016. I am not satisfied that the failure by the FSP to keep the applicant informed resulted, in this instance, in an unusual degree of time taken or inconvenience suffered by the applicant. I note the FSP had offered the applicant an ex gratia payment in this matter of $3,000. The applicant elected not to accept this. The FSP has now withdrawn that offer. Should the FSP wish to reinstate that offer then that is a matter between the applicant and the FSP. Case No: 434033 Determination Page 6 of 7 3 Supporting information 3.1 Policy terms ‘ Escape of liquid What is not covered You are not covered under this Insured E vent for:  loss or damage caus ed by any escape of liquid of which you were aware and failed to notify us within a reasonable period;  …  loss or damage caus ed by any gradual escape of liquid; Accidental damage … If the cause of the loss or damage falls under an Insured Event in the policy, the loss or damage will be assessed under that Insured Event. General Exclusions Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design; 2. damage to your building or part of your building that at the time it was built, renovated or installed was not compliant with the relevant local government regulations, or the requir ements of any other statutory authority; 3. … 4. wear and tear and lack of maint enance, including rust, corrosion and deterioration (except in some instances relating to the Insured Events ‘Escape of liquid’ and ‘Legal liability’ claims); 5. … 8. subsidence or landslide; 9. the vibration, settling, shrinking or expanding of earth or any building foundation, wall, pavement or pat h 10. erosion that occurs gradually…’ 3.2 Expert reports Record Key points FSP’s engineer ( G E ) Water Damage Structural Assessment 11 - 01 - 2016  Soil probe test conducted around house found to be consistent and dry, but wet and soft around subfloor entry.  Roof drainage appeared adequate and functioning well.  The sub - floor and perimeter drain to the creek.  Ground movement is evident around the subfloor access.  Noticeable subsidence along the path near the veranda entrance.  Subfloor access door slightly distorted due to movement.  The subfloor ground appears to be freely draining, ie any water entering the subfloor space is managing to drain to the exit pipes.  The exit pipes are necessary because the perimet er concrete paths are higher than the subfloor. Case No: 434033 Determination Page 7 of 7  There are visible sags and hogs between supports in the pipe.  ‘In my opinion, water from the recent pipe leak has contributed to the subsidence’.  Current suspended pipe hangar supports spaced 2m apart are inadequate. AS 2032:2006 provides the maximum support spacing for a pipe of this kind is 1.5m.  ‘I believe lack of adequate supports to be a contributing fac tor to the leaking suspended pipe bend’.  Subfloor drainage exit pipes are installed because perimeter concrete path is higher than the subfloor surface, which is not permitted by the Building Code of Australia for a suspended floor.  Observed subsidence has resulted from the leak. FSP ’s builder ( A B ) Preliminary Report 05 - 11 - 2015  Slight sag noted in the timber deck located above the leaking pipe.  Movement associated with the timber deck and concrete pat h consistent with ongoing wat er escape in the subfloor v oid space.  The steel stumps are highly rusted as wat er is unable to drain away.  Unclear whether the present of the nearby creek contributed to loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.