Home / Financial Firm (Unknown - Insurer) / Determination 433639
Determination 433639
Cash settlement amounts for storm water damage repairs and alternative accommodation
Summary
The applicant disputed the FSP's cash settlement offers of $32,196.86 for repairs and $5,625 for alternative accommodation after storm water damage in 2010 and 2015. AFCA set settlements of $43,500 for repairs and $7,500 for accommodation, ordering the FSP to pay $51,000.
A cash settlement is fair where it covers damage caused by the insured event, excludes pre-existing and wear-and-tear items, and allows for the transferred risk of extra repair cost.
Issues
- Claim amount dispute primary · upheld
“A fair cash settlement for the water damage is $43,500, and for alternative accommodation is $7,500, payable by the FSP.”
- Repairs or contractors secondary · not upheld
“The FSP's policy clearly provides it is only obliged to repair that part of the building which actually sustained damage.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 433639 Determination Page 1 of 7
Case number: 433639 18 July 2017
1 Overview
1.1 Dispute
The applicant holds a Home Building and Contents Policy with the financial services
provider (FSP). In 2010, he lodged a claim for water damage to his kitchen and
adjacent areas.
In 2015, he lodged a further claim for water damage to his kitchen and adjacent
areas. The FSP contends some of the claimed damage relates to the original
unrepaired damage from the 2010 claim.
The FSP accepted the claim and offered a cash settlement of $32,196.86 based on a
quotation to repair the water damage. The FSP also offered $5,625 for alternative
accommodation.
The applicant is unhappy with the offers. He provided a quotation for the repairs
amounting to $69,726.73. He also believes the alternative accommodation is
insufficient because he is unable to find short term rental. He says the minimum
lease period in his area is 12 months. The applicant seeks $ 69,726.73 for repairs and
$78,000 for alternative accommodation .
1.2 Issues and key findings
Is the FSP’s offer for repairs fair in all the circumstances?
Pursuant to the policy terms and conditions, on the information provided, it is fair in
all the circumstances the FSP cash settle the applicant $43,500 for the claims made
in 2010 and 2015 for water damage to the insured property.
Is the FSP’s offer for alternative accommodation fair in all the circumstances?
Pursuant to the policy terms and conditions, on the information provided, it is fair in
all the circumstances the FSP cash settle the applicant $7,500 for the claims made
for alternative accommodation as a result of repairs required for water damage to the
insured property.
1.3 Determination
The determination is substantially in favour of the FSP.
Case No: 433639 Determination Page 2 of 7
The FSP is to pay to the applicant $51,000 (net of policy excess and interest) within
seven days of acceptance of this determination.
The FSP is also to ensure all applicable optional benefits under the policy (such as
the reasonable cost of alternative accommodation for pets and storage costs of
contents) are assessed and paid (if applicable).
The FSP is otherwise not required to take any further action in relation to the claims
or the dispute.
Case No: 433639 Determination Page 3 of 7
2 Reasons for determination
2.1 Is the FSP’s offer for repairs fair in all the circumstances?
Water damage occurred in 2010 and 2015
The applicant must establish on the balance of probabilities he has suffered loss and
damage caused by an event to which the policy responds. This is known as a prima
facie claim.
The material provided establishes claims were made by the applicant in 2010 and
2015 as a result of storm damage.
The issue in dispute is the extent of the liability of the FSP.
The material provided establishes a claim was lodged in March 2010 as a result of
storm water entering the insured premises. The FSP’s assessor (P) noted the
applicant advised water leaked through the kitchen ceiling and window during a
storm event in March 2010. P noted water was entering the area in question due to
overflowing gutters. P accepted the resultant damage consistent with the claimed
storm event included:
kitchen cupboards and bench tops swollen
ceiling and walls in TV room water stained
floor tiles in kitchen dining and meals area lifting
eaves at front of house and porch area water stained.
This damage is similar to the damage claimed in 2015.
FSP assessed and photographed the damage in 2010/2011
P inspected and photographed the damage on 24 March 2011. P also provided a
detailed scope of works. P quoted $20,959.40 to complete the work.
Later in 2011, another builder (TS) provided a scope of works to repair the kitchen
entrance and floor tiles in the amount of $31,490.
The material provided establishes at this time there was correspondence between
the a pplicant and the FSP and between the applicant and the FSP’s builder but the
scope of works provided by TS was not signed nor did the applicant authorise repairs
to commence with TS. The material provided establishes the reasons for this may
have included the applicant’s ill -health at the time and further discussions regarding
additional of repairs identified in the kitchen. I consider ill-health to be a reasonable
response as to why the applicant did not respond to the insurance claim earlier.
In any event , in April 2013, the FSP’s file was closed until the applicant notified the
FSP again of damage in late 2015.
Parties provided quotations to repair in 2015/2016
The FSP appointed builders (B) to attend and inspect the property which took place
on 6 November 2015. The applicant advised during torrential rain in early November
2015 significant water entered the kitchen ceiling and damaged kitchen cabinetry.
Case No: 433639 Determination Page 4 of 7
B inspected and photographed the damage. He reported on various features in the
kitchen indicative of water exposure.
B also identified cracking in the floor tiles which he said was because of trapped
water below the tiles.
B engaged the services of a roof specialist who identified blocked spouting and
insufficient downpipes leading to overflow of water a nd backflow into the roof cavity
area. The roofer recommended periodic cleaning of the gutters and installation of
additional downpipes to the spouting to assist with even discharge of rainwater.
B concluded the damage to the kitchen cabinetry and plasterboard ceiling was
because of water which entered the ceiling and wall cavities from the overflowing
spouting.
On 12 November 2015, B provided a detailed scope of works for work required to
repair the water damage in the kitchen, living room and dining room. The quotation
for repairs is $32,196.86.
The FSP’s assessor inspected and photographed the property with the applicant on
28 January 2016.
The FSP’s assessor agreed water was entering the property due to a poorly
designed rain water catchment system. He recommended the applicant undertake
remedial work including installing more downpipes and overflow outlets to ensure
water ingress did not occur in the future.
He noted the cracking floor tiles and agreed to include the tiles in the scope of works.
As for the kitchen cabinetry, the FSP’s assessor agreed there was damage due to
ongoing stormwater entry but he said the doors and drawer fronts ha ve not been
damaged and can be reused.
The assessor reviewed the scope of works provided by the builders and found the
scope reflected the damages sustained both in 2010 and subsequently.
The assessor reported the house was run down from lack of general maintenance
and ongoing issues with stormwater entry from the roof. In the circumstances, the
assessor recommended the FSP cash settle the resultant damage to enable the
applicant to first repair the spouting and undertake other necessary maintenance
works.
The assessor recommended the applicant provide a quote from a builder for the
required works as per the final scope of works. The quote was to be compared to the
quotes from the FSP.
The assessor’s report also provided annotated photographs of the damag e.
The FSP noted the applicant had not been able to reach a settlement and wanted all
the kitchen to be replaced due to matching issues.
The assessor reviewed all past scopes of work and produced a final detailed building
assessment for work required in the kitchen, lounge, dining, and external. The
assessment dated 28 January 2016 details the work required. A final total estimate
was $36,027.
Case No: 433639 Determination Page 5 of 7
The assessor indicated it would take about four weeks to undertake the repairs.
In response, the applicant obtained a quote from C Engineering Pty Ltd (a registered
building practitioner and civil engineer) in the sum of $69,726.73 inclusive of GST.
C estimated the work would take around 7 weeks to complete which estimate
included an allowance to allow water damaged areas to dry prior to joinery and tile
installation.
A fair cash settlement for the water damage is $43,500
I have compared the quotations. Generally, the amounts quoted for the work required
to be done is within an acceptable range. The substantive item is the cost to remove
and replace existing joinery. The FSP’s assessor made an allowance to replace
some but not all of the kitchen joinery.
I accept the FSP’s decision in this regard is correct. The FSP’s policy clearly provides
it is only obliged to repair that part of the building which actually sustained damage.
I am not satisfied on the material provided the FSP is obliged to replace all of the
kitchen cabinetry. The applicant’s report is not signed. There is insufficient
independent objective expert evidence from the applicant to justify a claim to replace
all the kitchen cabinetry.
On the other hand, the FSP’s assessor has inspected and reported some of the
kitchen cabinetry is not damaged by the insured event but is wear and tear only.
Further, he says certain parts can be removed and replaced and reused. The FSP’s
assessor’s photographs support his opinion.
The FSP’s policy provides the FSP with a discretion as to whether it will repair or pay
an insured the costs of repairs. This discretion must be exercised fairly and in good
faith.
The FSP identifies pre-existing damage. The FSP also identifies work required to
prevent water coming into the property in future. In these circumstances, I accept the
FSP is entitled to cash settle the claim.
However, in cash settling, the FSP must make a fair allowance for the transferred risk
that additional costs may be incurred when repairing.
Having considered all material provided, I am satisfied it is fair in all the
circumstances the FSP make a further allowance so that the total cash settlement to
the applicant for water damage repairs is $43,500.
In all the circumstances, I consider it is also fair no excess is deducted from the
settlement and no interest is payable on the settlement amount.
Case No: 433639 Determination Page 6 of 7
2.2 Is the FSP’s o ffer for alternative accommodation fair in all the
circumstances?
A fair cash settlement for alternative accommodation is $7,500
The parties were unable to agree about compensation for alternative
accommodation.
The FSP’s policy provides if the insured b uilding suffers damage and an insured is
unable to live in the home as a result, the FSP will cover the costs of alternative
accommodation for up to 12 months.
The FSP’s policy provides it will pay an amount which is equal to the weekly rental
value of the building before the incident occurred.
The FSP’s assessor says it will take around four weeks to undertake repairs.
C Engineering said the works would take 30 calendar days but C also allowed an
additional 14 to 21 calendar days to allow for water damaged areas to dry prior to
joinery and tile installation. The damage in question occurred in 2010 and 2015.
Therefore, any allowance for water damaged areas to dry is redundant.
On the material provided, I am satisfied it is fair in the circumstances to allow 30 days
alternative accommodation.
In support of his position, the applicant provided a letter from a real estate agent in
July 2016. As the standard lease term in the applicant ’ s area is said to be 12 months,
the applicant claims alternative accommodation at $1,750 per week over 12 months.
The FSP offered $5,625 for alternative accommodation. The FSP says there are
number of other alternative accommodation options open to the applicant which
would be economical and suitable including hiring a serviced apartment or hiring a
house on a weekly basis through services such as Air B&B.
The FSP also provided rental values for three properties of a similar size in a similar
location.
I have considered the material provided. I am satisfied the FSP is only required to
indemnify the applicant and pay an amount which is equal to the weekly rental value.
I am also satisfied the applicant is entitled to be indemnified for alternative
accommodation expenses in relation to 2015 claim because the material provided
establishes storm damage occurred at this time.
On the information provided, and taking into account other accommodation options
other than rental accommodation and making an allowance for repairs taking longer
than expected once the work begins, I am satisfied a fair amount for alternative
accommodation in the circumstances of this dispute is $7,500.
In cash settling this claim, the FSP is to ensure all optional benefits under the policy
are paid, if applicable. In this regard, it is noted the policy also provides cover for the
reasonable costs of alternative accommodation for pets (if required and applicable)
and storage costs of contents (if required).
Case No: 433639 Determination Page 7 of 7
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s Notice of Response dated 16
May 2016. Both the policy document and the Notice have been exchanged with the
applicant.
Since the Notice of Response, the FSP located and provided a copy of the policy
applicable to the 2010 event. This policy was also exchanged with the applicant.
For the purposes of this issues raised in this determination, the policy wording relied
on by the FSP is the same in both policy documents provided.
3.3 Other relevant material considered and relied on
Parties’ submissions, emails , reports, quotations, scopes of work, photographs
and all attachments to submissions.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.