Home / Financial Firm (Unknown - Insurer) / Determination 433595

Determination 433595

Claim for wall and deck damage to strata unit declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-02-28
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owner of a strata unit claimed for wall and deck damage, attributing it to the 1989 Newcastle earthquake or accidental damage, and the FSP declined. AFCA found the damage was not proven to be earthquake-caused or to have occurred in the 2014 period, and the determination states no further action is needed.

The applicant had to prove the damage was caused by an insured event, and the weight of expert and 1998 builder evidence attributes it to long-term site settlement and lateral pressure.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 433595 Determination Page 1 of 11 Case number: 433595 27 February 2017 1 Overview 1.1 Dispute The applicant is the owner of Unit 8 of the insured property. The applicant’s mother was the owner until her death in about 2013. At all material times, the FSP insured the property. At all material times, the applicant’s husband (who is the applicant’s representative) acted as broker. Damage was discovered to the external pavement and outside wall of Unit 8 in or about 2007. The wall was leaning forward and cracking. The applicant says he informed the strata manager who was to discuss the damage with the FSP. The applicant received no formal response from the strata manager. In 2014, the applicant submitted a claim. It is asserted the damage was caused accidentally or the damage was caused by the 1989 Newcastle earthquake. The FSP declined the claim on the basis the loss did not arise from the earthquake or any other insurable event. 1.2 Issues and key findings Is FSP entitled to decline the claim? The FSP is entitled to decline the claim as the material provided does not establish on the balance of probabilities the proximate cause of the claimed damage was the 1989 earthquake. Further, any claim for accidental damage cannot be maintained as the material provided does not establish the claimed damage occurred during the 2014 period of insurance. 1.3 Determination This determination is in favour of the applicant. The FSP need take no further action in relation to the claim or the dispute. Case No: 433595 Determination Page 2 of 11 2 Reasons for determination 2.1 Is the FSP entitled to decline the claim? The applicant must prove the claimed damage is caused by an insured event The applicant claims damage to the wall of the terrace/deck area of Unit 8 and the paved surface thereof. Unit 8 was owned by the applicant’s mother until 2013. Upon her death, Unit 8 belonged to the applicant. The applicant’s husband (who is the applicant’s representative) acted as broker at all material times. The applicant points out there was prior earthquake damage to Unit 8 in December 1989. The applicant challenges the FSP’s decision saying the FSP relied on the opinion of an engineer who was not aware of the prior earthquake history. He also says the engineer did not properly inspect the damage as he did not inspect underneath the floor of Unit 8. The applicant refers to accidental damage. The applicant also contends the available evidence supports his contention the 1989 earthquake is the proximate cause of the claimed damage. The applicant points out cracks were repaired by the FSP in 1990 and it is these cracks which opened up again. He says the Newcastle earthquake was a major insurance catastrophe at the time and the effects were not localised to the Newcastle area. The applicant contends the “inherent site defect” referred to by the FSP’s engineer was a residual effect of the earthquake. The applicant also says the deck has since been opened yet he could see no visible signs of the cause identified by the FSP, being lateral pressure. The applicant relies o n his own engineer’s report and photographs taken of the area underneath the deck. He also relies on his own research about recognised engineering tests relevant to earthquakes. The applicant says the FSP has not acted fairly. He says the FSP’s engineer sh ould have not only reviewed the applicant’s engineer’s opinion but should have returned to the site to inspect underneath Unit 8. The FSP describes the history of the matter and concludes the damage is not due to the 1989 earthquake but is due to long - term soil settlement. It says:  the applicant’s engineer did not say the damage was caused by earthquake  the applicant’s representative is a very experienced broker and would not miss an earthquake damage claim over many years  its insurance assessors and builders would not have missed earthquake damage  after the recurrence of cracking, the FSP’s internal adjuster withdrew the opinion that there had been any earthquake damage  if there was damage caused by the 1989 earthquake, the development of the damage over the intervening decades rendered it due to gradual deterioration  neither party has identified damage related to a claim in or about 2007  if the damage was due to hydrostatic pressure as posited by the applicant’s engineer, then this arises over long-term because of inadequate drainage which is excluded from cover. Case No: 433595 Determination Page 3 of 11 Extensive material relied on by the parties considered and reviewed On 28 December 1989 there was an earthquake in Newcastle. The insured property is in Turramurra some distance from Newcastl e. The FSP’s engineer says the earthquake was around 80kms from the insured property. On 28 May 1990, the applicant lodged a claim stating: “ After the earthquake, cracks were noticed in the hall, bathroom and lounge dining area …..” The FSP arranged for cracking damage to be repaired. It is described by the FSP’s builder as reinstatement of earthquake damage. In January 1991, the applicant complained the cracks had opened up again and asked for the work to be rectified. On 15 January 1991, the FSP’s buil der (KT) inspected the premises and said fresh fractures had opened up. He commented the fractures were new and not in the same position as the previous fractures. KT was of the opinion both incidents of fractures were caused by movement in the building. K T suggested the wall be reinspected at the end of March to see if movement had ceased so repairs could be carried out. The FSP’s notes in May, June and August 1991 show no contact between KT and the applicant. KT reported: “ It appears there is some movement occurring in this building, in this particular load- bearing point of the structure below the hallway wall where the fractures occurred originally and have reappeared in a different area since that repair was carried out. The repair was carried out for the repair of damaged caused by this movement. The fractures were consistent with earth movement and it is apparent that the structure at this point is under load and differential movement on either side of this brick wall and pier is opening up the wall and causing the damage (sic). ” In June 1998, the FSP’s builder CU inspected and photographed damage in and under the Unit. CU noted cracking damage mainly in the hallway next to the bathroom but also in the lounge room, main bedroom and kitchen. CU considered the cracks were consistent with movement due to footings being affected by water due to the building being on clay which is affected by seasonal weather. As the weather was dry, CU wanted to inspect after the next period rain. This further inspection took place, after rain, on 28 August 1998. CU reported the footings and walls had dropped and this caused cracks in the walls above. He reported the footings and walls had dropped: “….due to the fact that the building is built on concrete strip footings on clay, which is expanding and contracting due to weather conditions in dry spells or heavy rain. In my opinion this damage is not due to any repairs carried out during earthquake damage repairs, but due to building on clay. In late December 1998, the FSP’s assessor reported on recent events. The matter was discussed with various members of the body corporate committee. Case No: 433595 Determination Page 4 of 11 Thereafter, the claim for cracked walls in Unit 8 was denied. The FSP contended the cracks in Unit 8 were caused by earth movement and could not be attributed to the earthquake in 1989 or any earthquake related repairs. On 9 July 2014, the applicant wrote to the FSP. The FSP’s policy at that time responded to a claim for accidental damage. He wrote: “ There is damage to the deck of Unit 8, going back about 7 years, and the Chairman (of the body corporate) advises me that this was discussed with (the FSP) and rejected as a claim. ” In a further email dated 20 August 2014, the applicant clarified the claim was for damage to: “… the deck of Unit 8. It’s an elevated ground floor Unit and the deck area has a brick wall from the ground level up to the floor level, and a sandstone flagging surface to the deck itself. The wall suffered damage about 7 years ago, and the deck surface started sagging after that. ” In later correspondence with FOS, the applicant says he meant to indicate that it was about that time the deck damage came to his attention not that the damage occurred to the deck about 7 years ago. However, there was no record of any claim to the deck of Unit 8 and so the FSP appointed an assessor F who attended to inspect the claimed damage on 25 September 2014. The assessor agreed there was cracking damage to the balcony front wall and balustrade. He also commented there had been localised repairs which had been attempted previously although unsuccessfully. He also agreed the pavement had settled and dislocated. The assessor said he was confident the cracking movement and deterioration had been ongoing for several years but he also obtained an engineering opinion. The FSP’s structural engineer, A, inspected and photographed the site on 18 December 2014. A described the damage and concluded the rotation of the retaining wall and fence and the displacement of the garden pavement to the Unit was due to long-term inherent site effects and not due to any defined events. Shortly thereafter the claim was rejected on the basis the damage was caused by policy exclusion of gradual deterioration. In a final dispute letter written in March 2015, the applicant was invited to provide evidence to support the assertion the property was accidentally damaged or the damage was caused by earthquake. The applicant provided a report from an engineer MF who had considered A’s report and inspected the premises in September 2015. MF inspected the premises in general, the patio wall and paving, in particular, and also inspected under the Unit. MF thought the balustrade fence was structurally deficient. He agreed there was long-term lateral pressure. A said this pressure was from retained material and foundation rotation. MF said the long-term lateral pressure was caused through a Case No: 433595 Determination Page 5 of 11 design defect in the original construction of the patio wall through a lack of seepage drains to relieve water pressure. As for the pavement, A considered there had been long-term movement which movement was due to compaction and consolidation of the garden soils. MF considered the damage to the garden pavement was likely a consequential effect of the retaining wall rotation. As the role of the December 1989 earthquake, MF said: “ I am unable to comment on whether or not the rotation of the retaining wall occurred as a result of the earthquake, albeit I can say that the opening of the obtuse angle in the retaining wall is consistent with an acceleration from an earthquake where the retaining wall was under lateral load. ” When MF inspected under the Unit, he observed two brick piers which were not supporting the timber floor joist. He said the brick pier itself showed no signs of structural damage. He concluded this suggests a rotation and/or settlement of the rock upon which it is founded. MF discussed the cracking damage which had occurred after 1989 earthquake which he said correlated with the two brick piers under the lounge room timber floor which no longer support the floor joist above. He said: “ Accordingly it is reasonable to conclude that the retaining wall rotation is also a consequential effect of the earthquake causing separation of the red brick wall skin to separate at the obtuse corner. It has rotated, a significant crack opened at the obtuse angle, and thus the paving settled such that all rainfall ponds behind the wall, further exacerbating the retaining wall condition. ” A reviewed the report from MF. A said the damage and rotation of the retaining wall was not due to the 1989 Newcastle earthquake. A said he had inspected 4,000 Newcastle earthquake claims and 600 other earthquake claims. He says the damage to the retaining wall is not consistent with earthq uake effects. He points out the earthquake epicentre was about 80km from the site which distance he says would have a negligible effect on the site. He also says the earthquake effect at ground level is transient. The retaining wall experienced almost no s way loading due to the earthquake motion. Rather, he says earthquake damage would occur at the higher elements of the premises. A maintained the garden area had settled because the soil placed behind the retaining wall after it was built was not fully compacted. The retaining wall rotation may have had some effect but was insufficient for the full settlement observed. As for the settlement of the underfloor piers, A accepted this as evidence of inherent site settlements and that conventional packing of them was required. In a further report, A explained the use of three Codes and reiterated his experience in relation to earthquake inspections. The applicant referred A’s comments to MF who made a number of further observations. Case No: 433595 Determination Page 6 of 11 Claimed damage did not occur during the 2014 period of insurance The applicant must establish on the balance of probabilities she has suffered a loss caused by an event to which an insurance policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny its liability for the loss. I am not satisfied the 2014 policy which provides cover for accidental damage responds to the subject claim. The relevant period of insurance was for 12 months from 25 May 2014. The 2014 policy covers accidental loss or damage to the insured property which occurs during the period of insurance. The applicant’s claim (the subject of this dispute) was m ade by email dated 9 July 2014. At that time, the applicant identified damage to the deck going back about 7 years. In later correspondence with FOS, the applicant said this is when the damage was first identified. In the circumstances, on the material pro vided, I am not satisfied the claimed damage occurred in the 12 months from 25 May 2014. I am not satisfied the claimed damage occurred during the 2014 period of insurance. Earlier policy provided cover for earthquake damage I am satisfied the FSP’s polic y provided cover for earthquake at the time of the Newcastle earthquake in 1989. This is because the applicant lodged a claim for earthquake damage in 1990 which was accepted by the FSP. The onus rests with the applicant to show on the balance of probabilities the claimed damage was caused by the 1989 earthquake. The material establishes the FSP responded to the applicants claim in May 1990 and repaired cracking damage in Unit 8. However, when the 1990 assessor reviewed the claim for the FSP in 1998, he reports no other Units were damaged in 1989. He also says the builder who was authorised to carry out the damage in 1990 considered the cause of the damage to be earth movement due to the clay subsoil. The assessor writes the applicant was given “the benefit of the doubt” at the time of the 1990 claim. When further damage was reported in 1998, the FSP’s builder inspected and photographed damage both in the Unit and under the Unit. The photographs show the same pier relied on by the applicant in later corre spondence with FOS. The FSP’s builder found the footings and walls had dropped. The photographs show the bearers and joist had been packed by what is described as packing sheets of fibro to make the floor level. This packing is clearly seen in the 1998 photographs. Because the footings and walls dropped, the builder said this caused cracks in the walls and the Unit above. The builder is unequivocal in his opinion which is the dropping and cracking was caused because the building is built on concrete strip footings on clay which expands and contracts due to weather conditions. Case No: 433595 Determination Page 7 of 11 Because of the damage to the deck area, (apparently first observed in or about 2007) the claim was revived in 2014. Further expert opinion was obtained. The FSP’s expert does not dispute there is cracking damage as claimed. Proximate cause of damage to the wall was not the 1989 earthquake I have considered that expert opinion, the photographs relied on by the applicant and the photographs attached to the FSP’s engineer’s report. The FSP’s engineer inspected Unit 8 and other Unit external areas. As noted by the applicant, the FSP’s engineer did not inspect under Unit 8. The FSP’s engineer observed the front brickwork had rotated forward in the left hand and had rotated towards the left. Photographs support this observation. The engineer said this damage was caused by long-term inherent lateral pressure from retained material and foundation rotation. Even though the engineer did not inspect under the Unit, photographs provided by the app licant and photographs taken by the FSP’s builder in 1998 show retained material under the Unit. In the circumstances, I do not consider the applicant’s criticism that the FSP’s engineer did not inspect under the Unit, derogate from the FSP’s engineer’s op inion. The FSP’s engineer also observe significant settlement movement to the Unit’s garden pavements. He thought the settlement movement was mainly due to compaction and consolidation of garden soils and the rotation of the front retaining wall would have only made this worse by a small amount. The FSP’s engineer took a number of photographs not only of Unit 8 but also of Unit 9 and Unit 3. He photographed previous repair of the front retaining wall fence at Unit 9 and rotation of Unit 3’s fence. In a sec ond report, the FSP’s engineer is unequivocal in his opinion that the damage and rotation of the retaining wall was not due to the earthquake. He cites his experience which includes inspection of around 4,600 earthquake claims. He explains why the damage to the retaining wall is not consistent with earthquake effects and points out the earthquake epicentre was about 80 km from the site. The applicant relies on a report from an engineer MF. Unlike the FSP’s engineer, MF says he is not accredited in this fie ld but is competent “to call it as he sees it.” MF agrees with the FSP’s engineer’s opinion as he says there is long -term lateral pressure. He identifies the cause of this is a design defect in the original construction of the wall through a lack of seepag e drains to relieve water pressure. Like the FSP’s engineer, MF also notes similar problems with other Units. In a later email to the applicant, MF reiterates “the inherent site effect” at play here is that the design did not include effective drainage through the wall. MF says the displacement of the garden pavement is a consequential effect of the rotating wall rotation. Therefore, in order to succeed regarding the damage to the garden pavement, the applicant needs to establish the retaining wall rotation occurred as a result of the earthquake. On the material provided, I am not satisfied on the balance of probabilities this has been established. This is because I consider MF’s opinion is ambivalent and his Case No: 433595 Determination Page 8 of 11 expertise is not established. Whereas, the opin ion from the FSP’s engineer is unambiguous. Further, I am satisfied if the FSP’s engineer has acted in 4,600 earthquake claims, and has the expertise to comment. MF is ambiguous as firstly he says he is unable to comment on whether or not the rotation of the retaining wall occurred as a result of the earthquake. Furthermore, having inspected the brick piers, he agrees their condition suggests a rotation and/or settlement of the rock upon which it is founded. This accords with the opinion of the FSP’s buil der when he inspected the premises in 1998. MF then goes on to discuss the repairs to cracking damage in 1989, and the location of the brick piers, and concludes, that the retaining wall rotation is a consequential effect of the earthquake. This is in contradiction to his earlier statement the lateral pressure on the wall is likely to have been caused by a design defect to the original construction of the patio. Further, MF does not persuasively state how the 1989 earthquake caused the wall rotation. Even if I were to accept the inference made by MF about the location of the repaired damage in 1990 by referring to the present state of the supporting brick piers underneath the damaged area of the home, this portion of the home was assessed in 1998 and the builder was unambiguous about the cause of damage. The builder positively asserted the damage was not caused by the 1989 earthquake. MF further notes noted that an opening of an obtuse angle in the retaining wall is consistent with an acceleration from an earthquake, where the wall is under a lateral load. He suggests the earthquake caused the separation of the brick skin of the wall. The FSP’s engineer further responded to this point. He notes that ground vibration from earthquakes causes the displacement of the whole structure. He says as buildings are not rigid, the upper portion of the building lags behind the earth movement and a sway effect occurs which causes damage to the higher parts of buildings. This is not consistent with the movement of the retaining wall which is closer to ground level. This is also not consistent with MF’s assertion that the brick skin separated because of the earthquake damage. If that was the case, the damage would have occurred to the entire structure. On this basis, on the information provided, I am not satisfied the damage to the retaining wall was caused by the 1989 earthquake. Rather, the information provided establishes on the balance of probabilities the damage occurred due to inherent lateral pressure on the wall, caused by foundation settlement over time and/or by a design defect in the wall when it was built. Proximate cause of the damage to the pavement was not the 1989 earthquake As for the garden pavement, the FSP’s engineer said this was caused by compaction and consolidation of garden soils over time and the rotation of the retaining wall would have had a minimal effect. MF responded to the FSP’s engineer’s report saying the cause of the damage to the garden pavement was solely a consequential effect of the retaining wall rotation. Case No: 433595 Determination Page 9 of 11 As I am not satisfied on the balance of probabilities the damage to the wall was caused by the 1989 earthquake, I am also satisfied any consequential damage to the garden pavement is not earthquake related. A further inspection under the Unit was not necessary in the circumstances The applicant criticises the FSP’s conduct and says it has not acted fairly. He submits the FSP should have not only reviewed MF’s opinion but should ha ve arranged for its engineer to reinspect underneath the Unit. However, in all the circumstances of the matter, I am not satisfied the FSP has acted unfairly. I am not satisfied the failure to inspect under the Unit derogates from the FSP’s engineer’s opi nion. I say this because photographs were taken of underneath the Unit in 1998 and the FSP’s builder was satisfied the damage was not earthquake related. Further, when one considers the FSP’s engineer’s opinion in total, and his extensive experience about earthquake damage and how earthquake damage is caused, I am not satisfied a further inspection under the Unit was necessary, in all the circumstances. Case No: 433595 Determination Page 10 of 11 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The applicant is represented. In this determination, any references to the applicant include references both to the applicant herself and to the applicant’s representative. At all material times, th e applicant’s representative acted as the insurance broker. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the parties’ submissions and in the FSP’s Notice of Response dated 15 April 2016. This material has been exchanged with the applicant. 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. Case No: 433595 Determination Page 11 of 11 3.4 Other relevant material considered and relied on  Parties’ submissions, emails and photographs .  Correspondence between the parties.  Material from earlier claims including photographs and expert reports.  Material from the 2014 claim including photographs and expert reports both from the applicant and the FSP.