Cyclone damage claim: roof replacement declined; kitchen cupboards and ceiling offer disputed
Summary
The applicant claimed storm damage to her roof, kitchen cupboards and ceilings after a cyclone. The FSP declined the roof claim and offered $2,200 for the other items.
The roof damage was caused by excluded rust and gradual deterioration, but the FSP's $2,200 offer was not shown to be sufficient for the storm damage to the cupboards and ceilings.
Issues
- Claim denial primary · not upheld“The FSP is entitled to decline the claim to replace the roof as the damage was caused by rust and deterioration.”
- Claim amount dispute secondary · upheld“I am not satisfied the amount offered of $2,200 is sufficient to replace the kitchen cupboards and repaint the water damaged ceiling.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 433174 Determination Page 1 of 6
Case number: 433174 10 February 2017
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for damage
caused to her property by Cyclone Ului. The FSP accepted and paid some amounts
for resultant damage to the building and contents.
The applicant claims the roof was damaged in the cyclone. The FSP says the
damage to the roof predated the cyclone.
The applicant disagrees with the FSP’s decision and asks for the roof and the kitchen
cupboards be replaced and the ceiling repaired.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. The FSP accepted the
recommendation but it was not accepted by the applicant. In the circumstances, the
dispute has been referred to me for determination.
1.2 Issues and key findings
Is the FSP entitled to decline the claim to replace the roof?
The FSP is entitled to decline the claim to replace the roof as the material provided
establishes on the balance of probabilities the damage to the roof was not caused by
the cyclone but was caused by rust and deterioration. As these causes are excluded
from cover, the FSP is entitled to decline the claim to replace the roof.
Is the FSP’s offer of $2,200 reasonable?
The material provided shows the applicant ’s claim for damage to the kitchen
cupboards was overlooked in assessment of the contents claim. Taking into account
contemporaneous photographs, and in the absence of objective evidence from the
FSP about how it calculated its offer of $2,200, I am satisfied it is fair in all the
circumstances the FSP pay to the applicant $5,000 (inclusive of GST and interest) to
indemnify the applicant for water damage to the kitchen cupboards and ceilings.
1.3 Determination
This determination is substantially in favour of the FSP.
If the applicant accepts the determination, then within seven days of acceptance, the
FSP is to pay to the applicant $5,000 to indemnify her for damage to the ceilings and
kitchen cupboards. Otherwise, the FSP is not required to take any further action in
relation to the claim or the dispute.
Case No: 433174 Determination Page 2 of 6
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
No new material provided after recommendation
After the recommendation was rejected, the applicant provided no new material. She
made a further submission in which she essentially reiterated her position. Where
relevant, her further submissions will be referred to in the determination.
2.1 Is the FSP entitled to deny the claim to replace the roof?
The applicant has established a prima facie claim
The applicant must establish on the balance of probabilities she has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
The FSP’s policy schedule shows the applicant selected accidental damage cover.
The FSP’s policy says it will cover buildings and contents fo r any accidental damage
or accidental loss including that caused by storm, rainwater or wind.
It is not in dispute a severe tropical cyclone caused damage to a number of the
applicant’s properties (including the subject property) on 21 March 2010.
On the material provided, I am satisfied a prima facie claim is established.
The FSP must establish policy exclusion applies
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the claim. In
the circumstances of this claim and dispute, the FSP must establish the damage to
the roof was caused by or arose from rust, corrosion, gradual deterioration,
depreciation, wear or tear.
The applicant contends the cyclone damaged the roof, and the roof finish, resulting in
internal ceiling damage and other internal damage. She says the ferocious wind blew
out three large upstairs windows. She also says the roof did not leak before the
cyclone.
The applicant has provided some photographs which show the damage to the beach,
the broken window panes and photographs taken in April 2011 showing water
damage to ceilings.
The applicant has also provided a quote from her plumber P to supply and install the
roof in the amount of $19,710 including GST. P has provided no written material
about the cause of damage to the roof.
Case No: 433174 Determination Page 3 of 6
The FSP engaged an assessor C who first inspected the property on 30 June 2010.
It is apparent from his second report C met with the applicant’s plumber P who
inspected and took photographs of the roof.
C reported to the FSP that P had advised C there were two minor cracks in the roof
which had been in existence for a long time and were not as a result of the cyclone.
C reported:
‘ P advised us that the water leaking onto the internal ceilings was caused by the
cyclone blowing rain up under the end laps of the sheets. … He has confirmed that
there is no wind or impact damage to the roof .’
Despite a number of requests, from both the applicant and the FSP’s asses sor, P
has provided no written report.
In the circumstances, the FSP engaged an independent consultant IC. The FSP’s
consultant inspected and photographed the roof on 14 December 2010.
The consultant agreed the ceilings had minor water staining as a result of water
ingress from the roof. However, he considered this was because of a lack of
maintenance. Namely, he said the asbestos roof sheeting was no longer sufficiently
waterproof as:
‘….the paint membrane that would normally waterproof this porous roofi ng product has
been allow to deteriorate to a point where it is now unserviceable and water is
absorbing into the roof sheeting (sic). ’
The consultant also identified a number of rusted roofing screws and exploded steel
washers on the roof which he said were a typical point of entry for water. He said the
screws require replacement about every 10 years but appear to be about 30 years
old.
The consultant concluded:
‘ In our opinion, during our inspection of the above-mentioned dwelling, no evidence
could be found to support the claim this building has been affected by Tropical Cyclone
Ului as it crossed the coast on 21 March 2010. ’
Damage to the roof caused by rust and gradual deterioration
I have carefully considered the report and the annotated photographs provided by the
FSP’s consultant. The photographs show the severely rusted screws and the
deteriorated protective paint finish.
Even if I were to accept there was no water ingress before the cyclone, in the
absence of an expert report to challenge the material provided, I am satisfied from
the material provided the roof itself was not damaged by the cyclone.
Rather, the material provided shows water came into the building during the cyclone
through broken windows or the cyclone blew rain up under the end laps of the
sheets. The material provided establishes some parts of the building and some
contents were water damaged. The FSP has mostly indemnified the applicant for this
damage. If water continues to enter the home, it is because of the state of the roof
which is still not repaired.
Case No: 433174 Determination Page 4 of 6
I am satisfied the material provided establishes the damage to the roof is caused by
or arises from rust and gradual deterioration. These causes of damage are excluded
from cover. In the circumstances, the FSP is entitled to deny the applicant’s claim for
damage to the roof.
2.2 Is the FSP’s offer of $2,200 reasonable?
FSP is to pay the applicant $5,000 for the cupboards and ceiling damage
In addition to replacement of the roof, the applicant said a fair and reasonable
outcome to the dispute was for the FSP to install a new kitchen. In support of her
claim the applicant provided a quote dated 15 August 2016 from a cabinet maker
who quoted on a new kitchen. The total price was $14,125 including GST.
In correspondence with the FSP in November 2015 the applicant indicated the
kitchen cupboards were damaged by storm water because the downstairs area was
inundated with water. She said there was a stench in the kitchen cupboards and the
doors were difficult to open.
In December 2015, the FSP indicated it would accept limited repairs of storm
damage to ceilings and kitchen cupboards in the amount of $2,200 (GST inclusive).
The applicant rejected the offer on the basis it was insufficient to paint the ceiling and
replace the kitchen.
The material provided shows when the applicant made the claim she claimed water
damage to two kitchen side tables and the kitchen cupboards. The material also
shows the FSP’s assessor took into account the amount claimed for the two kitchens
side tables ($499 each) in assessing the contents claim. However, damage to the
kitchen cupboards appears to have been overlooked in the calculation of the
contents claim.
By letter dated 25 October 2011, the FSP offered to cover the ceiling damage to the
house. No specific dollar amount was offered. However, at this time, the applicant
continued to maintain her claim that the FSP pay to replace the roof.
After the recommendation, the applicant indicated the amount offered is insufficient
to replace the water damaged kitchen. She says all the kitchen cupboards have a
very distinct stench to them and the cupboard doors and drawers are extremely hard
to open and close. She says water soaked up into all the cupboards in the pantry.
The FSP’s claim file includes photographs taken of the storm damage in March and
April 2010. The photographs show extensive storm and water damage. Further, the
contemporaneous claim material indicates a claim for damage to the kitchen
cupboards.
Having considered the contemporaneous photographs and the opinion of P as to
how water would have leaked into the internal ceilings I accept there was storm
damage to the ceilings and to the kitchen cupboards.
While the FSP is not obliged to replace the e ntire kitchen, I am not satisfied from the
material provided the amount offered of $2,200 is sufficient to replace the kitchen
cupboards and repaint the water damaged ceiling (even taking into account the
Case No: 433174 Determination Page 5 of 6
damage to the ceilings in 2011 at the time of the F SP’s offer). The FSP has not
provided any quotations or objective information to support the offer.
Due to the time which has elapsed since the damage occurred and the claim was
made, the FSP is not required to further assess the storm damage now. Rather,
having considered the material provided, including the contemporaneous
photographs of the damage, and noting the FSP took into account the amount
claimed for the two kitchen side tables in assessing the contents claim, I am satisfied
it is fair in all the circumstances the FSP pay to the applicant $5,000 (inclusive of
GST and interest) to indemnify the applicant for water damage to the kitchen
cupboards and ceilings.
Case No: 433174 Determination Page 6 of 6
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the recommendation and in the FSP’s
Notice of Response dated 12 April 2016. Both the policy document and the Notice
have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions, emails and photographs .
Correspondence between the parties.
Applicant’s quotations .
FSP’s various assessor’s reports .
Report and photographs from FSP’s consultant dated 21 January 2011 .