The applicant's rumpus room was flooded by water entering through the roof, and the FSP denied the claim for faulty workmanship and refused to replace carpet its contractor removed. AFCA accepted the independent evidence of faulty roof installation and found no proof the contractor misled him.
The policy excludes rain entering due to faulty workmanship, and the independent evidence established that the roof installation below minimum pitch caused the ingress.
Issues
- Claim denial primary · not upheld
“I accept the evidence demonstrates there was faulty workmanship regarding the installation of the roof over the rumpus room.”
- Repairs or contractors secondary · not upheld
“I do not accept there is sufficient evidence to establish that the FSP's contractor misled the applicant.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 433130 Determination Page 1 of 4
Case number: 433130 7 October 2016
1 Overview
1.1 Dispute
The applicant‟s claim for damage following water ingress into the rumpus room was
denied by his insurer, the financial services provider (FSP), on the basis it was due to
faulty workmanship.
The applicant has disputed this as he says there was no faulty workmanship. The
applicant has also complained about the fact the FSP‟s contractor disposed of carpet
as he was told the FSP would replace it.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP can deny the claim because:
the evidence demonstrates the installation of the roof over the rumpus room
was faulty workmanship, and
this faulty workmanship resulted in the water ingress.
Is the FSP liable to replace the carpet?
The FSP is not liable to replace the carpet because the evidence does not establish
the FSP‟s contractor misled the applicant.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny liability for the claim.
The FSP is not liable to replace the carpet.
Case No: 433130 Determination Page 2 of 4
2 Reasons for determination
2.1 Can the FSP deny the claim?
FSP relying on an exclusion
The applicant‟s policy covers him for loss or damage due to a number of insured
events.
One of these events is storm and rainwater. There is no dispute the applicant‟s loss
falls within this insured event.
However, the FSP is relying upon these specific exclusions to that insured event:
“We will NOT cover
X loss or damage caus ed by rain, hail or wind entering your home due to:
a design fault, structural defect or faulty workmanship
…
an opening that was not created by the storm.”
The FSP has the onus of proof in establishing one of the exclusions apply. The
standard of proof is the balance of probabilities.
FSP’s expert says there was no fall in the roof sheeting
The incident occurred on or about 21 December 2015 and the water ingress was
isolated to the rumpus room.
The FSP engaged a builder, AR, to inspect the damage and report on the likely
cause of water ingress. AR did so in a site report conducted on 29 December 2015
that said the following of relevance:
“Excessive rain from the south fell onto the deck which overloaded the corrugated iron roof
under the deck. The roof/ceiling butts into the supporting beams in rumpus which allowed the
water to enter the room
… The corrugated sheeting is installed at 0 degrees and the method of construction is not
appropriate.
… The construction of the deck area over the rumpus is not recommended practise. … the
method in which the rumpus room has been built in under the deck is in no way adequat e or
recommended. Colourbond sheeting requires a minimum of 5 degree pitch for correct water
drainage, according to manufacturer’s requirements. The construction present on this
property is very prone to leaking in any rain event.” [sic]
The report contained photographs of the relevant area that illustrated the following:
the decking on top of the rumpus room and the corrugated iron sheeting
underneath it
an area of the rumpus room showing that the corrugated sheets have been cut
against the beam but not sealed
Expert provided a further report that expanded on its reasons
The applicant disputed the zero degree fall and provided a photograph of a level
where the bubble was not in the middle.
An additional report from AR was obtained dated 14 March 2016 to address this and
said the following:
“Two measurements were gained in separate areas of the room.
The sheeting showed;
1. 27mm fall over 1000mm.
2. 31mm fall over 1000mm.
Case No: 433130 Determination Page 3 of 4
These calculate to below 2 degrees of pitch (1.546 degrees and 1.775 degrees respectively ).
This is further confirmed using the internal wall heights of 2300mm and 2120mm over a
6000mm span. The calculated pitch being 1.718 degrees.
Exterior observation of the construction showed the corrugated roof sheeting is lapped
incorrectly. An overlay of corrugated sheeting has been used where the main sheets fail to
meet, this overlay is also lapped incorrectly and is not forming a weathertight seal.
…
Conclusion
The ceiling sheeting consists of corrugated panels which have been installed with incorrect lap,
also overlay strips which are also lapped incorrectly. They are not forming a weathertight seal.
The sheeting serves as the „roof‟ in the lower room. AS such, the roo f sheeting has been
installed below the manufacturers minimum recommended pitch of 5 degrees.
…
Visual observation shoes the sheeting is screwed up to battens or floor joists. These run
perpendicular to the roof sheeting. Any debris can build up in the valleys of the roof sheeting
and become blocked at the timber framing, this combined with the low pitch will limit water
egress across the roof surface.
Exterior observation shows the retaining wall has very limited drainage. Build-up of rain or
ground water can penet rate the wall system adjacent to the retaining wall. This is evidenced by
the silicone sealant at the wall floor joint, and the water damaged carpet smooth edge strip.”
Photographs were provided in support of this.
Subsequent to this, the applicant provided a letter from his son dated 7 July 2016
that said:
“We removed the decking above the roof and found that the top corner of the waterproofing
membrane had separated at its anchoring point and allowed water to flow into the cavity and
through the lower roof into the rumpus room.
If the fall of the roof is 2 degrees as calculated and reported on this is adequate for longspan
continuous roofing as stated in the accompanying roofing manuals. …
The lapping of the roof is correct as 1.5 laps is the standard and this is clearly that. The photo
the insurance company supplied shows 3 piec es of roofing Lapped 1.5 and that is correct.
In my professional opinion The reason that the water ingress is the huge amount of rain that fell
in such a short time. The roofing is adequate, the all of the roof is adequate, the drainage is
adequate.”
The applicant‟s son is a qualified plumber.
The FSP provided a submission dated 16 September 2016 saying an internal roofing
specialist maintains the roofing product is corrugated, not longspan profile. The FSP
did not provide any direct evidence from this specialist.
Evidence shows damage due to faulty workmanship
After careful consideration of all the evidence and arguments, I am persuaded by
AR‟s evidence given the following.
First, AR is independent of both parties.
Second, AR‟s evidence about the roofing is consistent with the internal roofing
specialist. It appears unlikely both would erroneously describe the roofing sheet.
Further, the applicant‟s son has not explained why he considered the roofing is
longspan profile.
Third, AR‟s conclusion is plausible given roofing with insufficient fall would
conceivably have a causal link to the water ingress. Particularly fall that is
approximately one third to the recommended minimum standard.
Given this, I accept the evidence demonstrates there was faulty workmanship
regarding the installation of the roof over the rumpus room. Further, I accept the
evidence establishes on the balance of probabilities that the water entered the
rumpus room due to this faulty workmanship.
Case No: 433130 Determination Page 4 of 4
As this type of situation is specifically excluded, then the FSP is entitled to deny
liability for the damage caused by the water ingress into this room.
2.2 Is the FSP liable to replace the carpet?
Applicant says FSP’s contractor told him the carpet would be replaced
The applicant has also complained about the fact the FSP‟s contractor cut up and
removed the carpet from his room. He said the contractor told him the FSP would
replace the carpet when doing so.
The FSP obtained an email from the company that engaged the contractor. This
email quoted the individual‟s response to the issue which said:
“I really cannot remember what I said to the client, however I doubt very much that I would have
said that becaus e there was mould on the back of the carpet, left hand side of back door, also
please see phot o 001, mould was also there on right side of back door.”
The FSP has provided a copy of a release signed by the applicant which said the
following:
“Upon completion of the comp leted works I [applicant] confirm that the mitigation work at
[address] has been carried out to my satisfaction.”
The applicant said he thought he was signing an invoice and did not read the
document.
Evidence does not support the applicant’s position
The test of whether someone was misled is an objective one. This requires an
assessment that the words conveyed by the FSP‟s contractor were false when taking
into account any relevant context.
There is minimal evidence about what exactly was said between the parties.
Further, the applicant‟s position is inconsistent with the release signed and the
contractor‟s own position. The contractor in particular noted there was mould present.
This would be a potential health hazard and likely explains why the carpet had to be
removed.
Given all this, I do not accept there is sufficient evidence to establish that the FSP‟s
contractor misled the applicant.
Therefore, the FSP is not liable to replace the carpet.