Determination 433119

Claim denial for bushfire-related corrosion, external wall panels and internal wall damage

FirmFinancial Firm (Unknown - Insurer)
Decided2017-11-27
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$92,000
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

Owners of bushfire-affected property disputed the FSP's denial of corrosion, external panel and internal wall claims and unpaid invoices. AFCA ordered 50% of corrosion and front internal wall costs, $92,000 for panel replacement, invoice review, expert fees, statutory interest and $1,500 compensation.

The applicants established a prima facie claim from the fire and retardant, the FSP did not prove an exclusion applied to the panels, and the corrosion and internal wall causes were shared, so partial settlements were fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 433119 Determination Page 1 of 15 Case number: 433119 2 November 2017 1 Overview 1.1 Dispute On 29 November 2011, the applicants claimed their property sustained significant damage caused by a bushfire a few days earlier. The FSP accepted the claim and agreed to carry out repairs. The applicants claimed corrosion damage to the external steel walls and major steel structures caused by materials in the fire retardant dropped onto the property by aerial bombers. The FSP rejected the claim saying the corrosion damage was not caused by the fire or the fire retardant but by wear and tear, gradual deterioration, climatic conditions and inherent defects in design and poor workmanship. Expert reports were obtained which recommended testing to determine the cause of the damage. The parties agreed on a suitable expert (AL) to determine the cause of the damage. The applicants also claim for damage to external wall panelling, the cost of repairs to internal walls in the front section and payment of outstanding invoices. 1.2 Issues and key findings Is the FSP entitled to deny the applicants’ claim for corrosion damage? The expert report of AL establishes the fire or the fire retardant did not contribute to all of the current corrosion damage, but as the report also establishes the chemicals from the fire and from the fire retardant hastened the corrosive process and reduced the overall corrosion protection life of the coatings, it is fair in all the circumstances the FSP pay 50% of the corrosion damage described by AL in his report. Is the FSP entitled to deny the applicants’ claim for damage to external wall panelling? The FSP is not entitled to deny the applicants’ claim for damage to the external wall panelling as the only expert engineer who inspected and tested the panels (including seeking advice from the manufacturer of the panels) concluded the radiant heat from the fire compromised the strength of the foam panel walls. As a prima facie claim is established and the information provided does not persuasively establish a policy exclusion applies, the FSP is liable for the damage. Case No: 433119 Determination Page 2 of 15 Is the FSP entitled to deny the applican ts’ claim for repairs to the internal walls in the front section? As the information provided establishes the damage was ca used by both extreme heat from the fire and non-standard fixing of the boards, it is fair in all the circumstances the FSP pay 50% of the cost of repairs to the internal walls in the front section of the house. Is the FSP obliged to pay the outstanding invoices? As the FSP has provided no material to refute this aspect of the applicants’ claim and as the panel considers the invoices are mainly for work done in association with the claim, these should be paid by the FSP within 14 days of acceptance of this determination. However, the FSP is entitled to review the invoices and deduct any amounts set out in the provisos in section 2.4 of this determination. Are the applicants entitled to compensation? The applicants are entitled to compensation as the material provided establishes there was an unusual amount of time taken to resolve the situation and the FSP’s conduct interfered with the applicants’ expectation of enjoyment or peace of mind. As the dispute was complex and the applicants genuinely required expert assistance, it is fair in all the circumstances the applicants’ expert reports are paid by the FSP. 1.3 Determination This determination is substantially in favour of the applicants. Within 14 days of acceptance of this determination by the applicants:  the FSP is to assess the corrosion damage identified by AL in his report and cash settle the applicants 50% of the fair cost to repair that corrosion damage  the FSP is to pay to the applicants $92,000 to remove and replace the external wall panelling  the FSP is to pay statutory interest on $92,000 from the date of the applicants’ quote for repairs (29 March 2015) to the date of settlement  the FSP is to review the invoices provided by the applicants for the cost of repairs to the internal walls in the front section of the house and upon agreement with the applicants, pay 50% of the cost of repairs  Statutory interest is to be paid on the agreed costs from the date the repairs were paid by the applicants until settlement  subject to the provisos in section 2.4 of the determination, the FSP is to review and pay the outstanding amounts in the invoices  the FSP is to pay the applicants $1,500 non-financial compensation Within 14 days of acceptance of this determination by the applicants, the applicants are to provide the FSP with the detailed invoices from their experts for those expert reports. Within 7 days of provision of the invoices, the FSP is to pay the expert reports or reimburse the applicants. If the reports were paid by the applicants, the FSP is to pay statutory interest on the amounts paid from the dates of payment until settlement. Case No: 433119 Determination Page 3 of 15 2 Reasons for determination 2.1 Is the FSP entitled to deny the applicants’ claim for corrosion damage? Applicants must establish corrosion damage caused by insured event The applicants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The applicants say the claimed corrosion damage was caused by the fire event, by radiant heat from the fire or by chemicals in the fire retardant. The FSP’s policy covers the applicants for damage caused by fire or smoke. If a prima facie claim is established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. In correspondence in December 2014 and April 2015 the FSP says the corrosion damage was not caused by the fire or the fire retardant but by wear and tear, gradual deterioration, climatic conditions, and inherent defects i n design and poor workmanship in the construction of the property. The FSP notes the property is 1.6kms from the ocean and submits the corrosion is because of normal wear and tear due to the proximity of the sea. The FSP contends the claimed damage is not covered by the policy as the causes of damage are excluded from cover. The FSP said all items attributed to the fire have been settled in full. A number of experts were engaged by the parties to provide an opinion. The FSP’s engineer (NC) discussed the damage with a forensic scientist (Z). NC agreed there was excessive corrosion. Z said there is a sulphur compound in fire retardants which could be detected from sampling. Parties agreed a suitably qualified professional (AL) would advise them In order to verify if the claimed corrosion was caused by the fire retardant, the FSP proposed the testing recommended by Z be carried out. Should tests confirm the applicants’ position, the FSP said it would indemnify the applicants for any losses caused by the fire or the fire retardant. The applicants agreed to the FSP’s proposition. The parties agreed on a suitably qualified professional (AL) to advise. The parties provided information to AL. In view of the parties’ agreement as to a mechanism to resolve this issue , the panel does not propose to discuss and analyse the reports that preceded the report from AL. AL inspected and photographed the property in November 2016. In his report, AL sets out the locations he examined and the locations from which samples were removed. Additional samples were also taken of a new screw, a purlin sample and a ceiling batten section. Case No: 433119 Determination Page 4 of 15 AL noted widespread zinc corrosion and areas of more severe corrosion indicated by brown corrosion product. He described and photographed widespread corrosion to the structural steel, wall panelling and securing screws with corrosion more noticeable in the galvanised surfaces. AL noted the corrosion damage was widespread and because of that said: … there was no definitive indication of preferential salt spray, marine atmosphere influence. He also accepted the materials used (colourbond steel for the wall panelling and the class 3 fasteners) had the specified corrosion protection. He was concerned about the coating for the structural steel work and said the corrosion of the exposed zinc on the purlins and rafters could be attributed to the marine environment. However the panel notes he also comments that the kind of coating used would require maintenance within a 6-20 year period from installation. The fire occurred in 2011. It is not in dispute the house was constructed only a few years earlier in 2008/2009. AL tested the removed samples. He reported the white product was consistent with a zinc oxide corrosion product and the brown product was consistent with an iron oxide corrosion product. AL reported the samples showed significant levels of sodium, chloride and magnesium (from salt water or marine atmosphere spray) but also showed high levels of carbon and trace levels of sulphur (from the fire or the fire retardant). AL describes the mechanism attributable to a combination of elements during a fire. The elements described included smoke settling on metallic surfaces, the moist residue from the retardant, the chloride from marine spray, the carbon and sulphur from the fire and possibly nitrogen and phosphorus from the fire retardant. AL says the presence of a number of these elements within the moist sticky residue left by the fire retardant is likely to contribute to and accelerate corrosion rates on exposed zinc or steel surfaces. Further, AL said the delay and difficulty in washing the residue would have allowed a far greater degree of corrosion to occur which would reduce the overall corrosion protection life of the exposed coatings. The material provided establishes there was some delay in washing the residue but not through fault of the applicants but because of inability to access the site. Further, AL said heat from the fire would cause some movement between adjoining items which could damage protective coatings and allow a further degree of ingress of the sticky residue and difficulty in being able to eliminate corrosion at these sites. As for the chloride, he said this is now the predominant reason for ongoing corrosion. He attributes the chloride to saltwater or the marine atmosphere not to the fire or the fire retardant. The material provided establishes suitable wash down maintenance was regularly conducted since the fire event and since the specific and more extensive wash downs which took place after the fire to remove the fire retardant residue. Case No: 433119 Determination Page 5 of 15 Because of this, AL says the other corrosive elements which may have been contained within the residue are no longer evident and this is why he attributes the ongoing corrosion to chloride, not from the fire or the fire retardant. Save for the adjuster, the parties have not commented on AL’s report The parties have not commented on AL’s report. The FSP was invited by FOS to advise of its position upon receipt of the report but has not done so save for provision of a report from the adjuster. The adjuster says AL failed to take into account the prevailing weather and the building’s features and says “there remains a scientific vagueness.” He concedes “at worst” the elements of the fire and the fire retardant may have shortened the corrosion maintenance cycle for the materials used. The panel notes these criticisms but does not find them particularly compelling in view of the comprehensive nature of the report from AL. Further, AL makes specific reference to the fact: “There appeared to be no significant visible preferential attack of the items on the North side of the dwelling to suggest any marine atmosphere salt spray influence and if anything the East side purlins appeared to be possibly worst affected.” The panel does not accept the report is scientifically vague. Rather, AL’s sampling technique and metallurgical examination is well described. AL clearly reports he found high levels of carbon and trace levels of sulphur which he says are attributable to the fire event. Fair in all the circumstances the FSP pay 50% of corrosion damage The panel accepts AL does not attribute all of the current damage to the fire or the fire retardant. This is because AL says the cause of the current corrosion is chloride which comes from the sea and the weather. Further, AL says because of time and the special cleaning and maintenance cleaning, the corrosive elements from the fire have been cleaned off. However, the panel is of the view it is clear from AL’s r eport that the chemicals from the fire and from the fire retardant hastened the corrosive process. Further, delay and difficulty in washing upper levels, crevice locations, between overlapping sheets and beneath screw heads all allowed a far greater degree of corrosion to occur. Similarly, AL says movement caused by heat may have contributed to difficulty in eliminating corrosion at some sites. Having carefully considered AL’s report, the panel considers the applicants have established on the balance of probabilities the fire or the fire retardant was, for a period of time, a cause of the corrosion damage described by AL in his report. However, the panel also accepts any corrosive elements from the fire or the fire retardant have been cleaned off by now. Because of this, the panel is satisfied the ongoing corrosion is not caused by the fire or the fire retardants but by climatic conditions from the sea and the weather. Damage caused by climatic conditions is excluded from cover. Case No: 433119 Determination Page 6 of 15 Taking all matters into account, including the observations made by AL that the presence of the fire retardant on the surfaces would have contributed to and accelerated corrosion rates and reduced the overall corrosion protection life of the coatings, the panel considers it is fair in all the circumstances the FSP pay 50% of the corrosion damage described by AL in his report. The FSP’s policy provides the FSP can decide whether it will repair the damage or pay the applicants the reasonable costs of repair. In the circumstances of this dispute, the panel considers a cash settlement is preferable. This is because of the length of time the parties have been in dispute and the determination that a percentage of the repair costs are paid. However, a cash settlement transfers all the risk from the FSP to the applicants of any unforeseen damage and any additional work required once repairs commence. For this reason, the FSP must act fairly and ensure its calculation of the cash settlement takes into account the requirements for the applica nts to be able to properly complete all necessary and possible repairs caused by the corrosive damage identified by AL in his report. Within 14 days of acceptance of this determination by the applicants, the FSP is to assess the corrosion damage identified by AL in his report and cash settle the applicants 50% of the fair cost to repair that corrosion damage. 2.2 Is the FSP entitled to deny the applicants’ claim for damage to external wall panelling? Applicants must establish wall panels were damaged by fire or radiant heat The applicants claim the structural integrity of the external wall panels was damaged by heat from the fire. They rely on reports obtained from engineers (MR) and (CO). The applicants’ building advisor (SP) amplifies concerns in a report t o the applicants dated 20 February 2015. He describes the structure of the property. He says the fire event came from the north, turned west and approached the property from the western and southern aspects causing prolonged heat exposure of 2-3 hours. He says the rear of the house has external walling made from an insulation fire resistant foam panel system. He said heat resistant bonding was used between individual panels and the glue failed because of exposure to the fire’s heat. SP describes the delamination of external insulation panels and expresses concerns about the effect on the structure of the building. He provides a photograph of an installation panel stored in the rear section of the house during the fire. He says the steel peeled from the foam with minimal effort demonstrating glue failure. SP claims the foam insulation panels on the rear section of the house will require an alternate fixing solution as it will be impossible to replace with identical panels due to the internal wall configurations. Case No: 433119 Determination Page 7 of 15 Applicants engaged two engineers to report on the cause of damage SP engaged an engineer CO to report. CO inspected and photographed the property on 11 February 2015. CO described the house structure. He noted the wall sheeting had not been replaced since the bushfire. At the end of a wall panel on the western wall a small section of external cladding was easily peeled by hand away from the foam core. Some sections of foam pulled off the steel lining and other sections caused the foam to delaminate close to the external steel skin. Extensive testing was not carried out as any further removal would compromise the structural integrity of the panel. Destructive testing would require replacement of wall panels. CO said the peeling process did not require force, and the heat from the bushfire may have reduced the strength of the components of the wall panels. This could not be definitely concluded without extensive destructive testing. SP also engaged an engineer (MR) to inspect the foam panels. The FSP ’s adjuster attended the property with MR. MR tested the wall foam panels on 17 September 2015. In his subsequent report, MR described the testing he undertook. Sections of the wall panel skin were cut and a pull out test was conducted. Breakaway of the outer skin varied with visual evidence of differing glue separation between test points. Photographs in his report illustrate this. MR also noted spare panels stacked near the house were delaminated. MR concluded the radiant heat from the fire had degraded the foam panels and compromised the strength of the foam panel walls. He says remedial work or replacement of these panels is required to return the house to an acceptable structural level. MR also consulted with the manufacturer of the panels (A). A said as there was heat load greater than optimum on the exterior, A would expect the panels to have less resistance to vertical loads and wind pressure. A said any panels which were exposed to temperatures above 70 degrees centigrade should be replaced. No material is presented to establish the temperature when the fire went through although photographs show significant fire and heat damage. SP engaged S Constructions to tender to repair the roof and the external wall cladding. The March 2015 tender price to replace the wall cladding to the outside of the building was $92,000. The FSP’s adjuster inspected the panels but obtained no expert report The FSP dealt with a number of issues in its letter in December 2014 including what it described as the EPS insulated wall panels. The FSP denied the claim, relying on policy exclusions. The applicants submitted further information. The additional information was considered but the claim denial was maintained. In order to facilitate resolution, the applicants provided the report from MR dated 25 February 2016 and the letter from A attached to MR’s report. Case No: 433119 Determination Page 8 of 15 Recent correspondence indicates the adjuster was unaware of the report from A. Although he knew MR attended the site, it appears he had not seen MR’s report. The adjuster asked AL to check and report on this issue. He commented no other homes in the area are built with these panels and said the panels would not be simple to replace. After AL was appointed, there was discussion about AL examining the external wall panels. In emails between the adjuster and AL, AL indicated removal of samples from the panels which had delaminated in order to determine the cause of the delamination sounded like additional laboratory work and would be charged additionally. The material provided does not establish what happened next but AL did not report on the cause of the delamination. AL attended the site in November 2016. He refers to the coloured panelling and notes the installation foam colour bond panelling was said to be fire damaged. However, he does not report why this occurred. There is no analysis or testing conducted by him in relation to the alleged heat damage to the glue. Numerous reports have been provided by the FSP’s adjuster. In dealing with some of the damage, he contends parts of the structure have been overdesigned. In a report dated 19 November 2012 he reports the major works of wall repairs have been completed. In a report dated 14 November 2014 he describes “new observations” made by SP who had arranged for MR to attend the site due to rust and corrosion developments to the colour bond sheeting and the rear (unit 2 and 3) EPS wall sheeting panels. The adjuster noted MR was to carry out further tests to determine if the glue had delaminated. When he next reported to the FSP he had not received anything further from MR or anything further from the applicants about this issue. He took some photographs of the EPS panels. In a report dated 18 November 2014 the adjuster dealt with a number of outstanding issues including the EPS insulated wall panels to the rear two units of the property. The adjuster was not satisfied with the information he had at that time. He had made an enquiry with B, the competitor to A. He was told the walls would need to be inspected. He was concerned A had a vested interest in the matter and challenged A’s opinion as A had not actually inspe cted the panels. The adjuster gave several panels the knock test. He said there was no drummy sound indicating a continuing bond between the glue resins and the metal sheets. He also questioned the wisdom of fixing a clothes dryer frame and air-conditioner to the panel structure, suggesting the weight of these objects may have broken the seal between the polystyrene and the outer metal sheets. The adjuster said there were no visible signs the rear walls to the rear units had delaminated. He pointed out ESP products are not a favoured cladding option. The adjuster agreed an intense and direct application of heat would cause the polystyrene fill in the panels to melt and collapse the wall structure. He points out the Case No: 433119 Determination Page 9 of 15 building did not catch fire. He says the measure of radiant heat is subjective and cannot be commented on by SP who was not at the fire scene. In conclusion, he suggested the EPS manufacturer (A) attend the site. The material provided indicates neither party arranged for A to attend the site. The other experts retained by the FSP have not commented on this issue save the FSP’s engineer (MC) noted the fire was in close proximity to the home. The engineer (NC) noted the speculative nature of the claim based only on the spare panel and agreed destructive testing is required to conclude the issue as to why the panels delaminated. The FSP’s event history shows SP was advised reports were needed to confirm the claimed damage is consistent with an insured event. SP indicated he would have a report from the manufacturer who was attending the site. The material provided indicates the manufacturer did not attend the site. It appears only MR attended the site and conducted tests about this issue. The material provided also shows despite recommendations from b oth parties’ engineers that destructive testing take place, destructive testing has not taken place. Although AL was engaged to provide an opinion and he attended the site, he did not provide an opinion on this issue. The panel notes the observations made by SP and the FSP’s adjuster but also considers neither of them have sufficient expertise to comment on this issue. MR ’s expert opinion establishes fire’s radiant heat cause d damage The only expert engineer who inspected and tested the panels was MR. The panel notes MR is a structural engineer who attended the site, undertook some tests and sought the opinion from the manufacturer of the panels. Although MR did not undertake destructive testing, he did inspect and cut away sections of the wall panel skin. He saw differing glue separation. He concluded the radiant heat from the fire compromised the strength of the foam panel walls. On the information provided, the panel is satisfied on the balance of probabilities the radiant heat from the fire compromised the strength of the foam panel walls. The panel is satisfied a prima facie claim is established. The onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. When denying the claim, the FSP said the claimed damage was not caused by fire but because of wear and tear, gradual deterioration, climatic conditions, and inherent defects in design and poor workmanship in the construction of the property. However, whil e noting the adjuster’s comments, the panel considers the material provided by the FSP is insufficiently persuasive. For reasons unknown, the FSP did not arrange for AL to provide expert opinion. On the information provided, the panel is not satisfied the FSP has established on the balance of probabilities the policy exclusions relied on. Case No: 433119 Determination Page 10 of 15 Panels to be replaced for $92,000 MR indicated remedial work or replacement of the panels is required to return the house to acceptable structural level. A said an experienced panel installer would be able to assess the extent of damage to the walls as the panels are removed. Neither commented on the extent of remedial work required or whether all the panels would have to be replaced. The only material about repairs is from S Constructions. He indicated the panels would have to be removed. In March 2015, S estimated the cost to perform the works was $92,000. This has not been challenged by the FSP. On the information provided, the panel is satisfied the panels have to be removed and replaced at a cost of $92,000. No information is provided about the present cost of repairs. As the quote is several years old, the panel is satisfied it is fair in all the circumstances the FSP pay to the applicants $92,000 and statutory interest on $92,000 from the date of S’s quote to the date of settlement. 2.3 Is the FSP entitled to deny the applicants’ claim for repairs to the internal walls in the front section? Applicants must establish front internal walls damaged by radiant heat The applicants claim they are to be indemnified for repairs to internal walls in the front section. Work was completed to rectify damage. They submit the FSP’s adjuster agreed to the claim in a site meeting on 1 September 2014. They say SP and the applicants’ pl asterer will confirm this agreement. In some correspondence this part of the dispute is referred to as “rippled walls in unit 1”. SP advised the adjuster his plasterer encountered rippling in the hardboard wall sheeting material. Adjuster said damage not caused by fire so many years after the fire The adjuster attended the site on 28 August 2014. He noted the fire repairs were carried out in early 2012. The unit had been rented until around March/April 2014. Therefore he says it had not been inspected by the applicants or SP since repairs. The adjuster noted the wall sheets were fixed to pine timber wall studs. He used a spirit level and could see tiny waves or ripples. The adjuster described this rippling as imperceptible. The adjuster also refers to cracking in the inner wall framing in the front unit. The plasterer reported much skin plaster fill was required to fill the ripples in the hardboard. The adjuster believed it was villaboard. The adjuster referred to this issue in three reports to the FSP prepared in August and November 2014. He says in August 2014, SP advised him he was preparing the front unit for occupation by the male applicant following a tenant’s departure. Case No: 433119 Determination Page 11 of 15 SP advised of new damage to the walls in the unit. The adjuster says at this time the interior living/ kitchen/meals area had been completed. A rendered textured surface had been applied over the original paint. While the adjuster agrees damage was present, he denies he accepted the damage. He did not accept the rippling or cracking was caused by the fire so many years after the event. The applicants were invited to submit quotes and reports about the cause of the damage. Applicants’ plasterer says heat caused internal boards to delaminate The applicants rely on a report from the plasterer (G) dated 15 November 2014. G says there is a breakdown of the internal wall lining system in the front part of the house. He describes cracks in the internal lining boards and rippling on the boards. He says the cracks in the wall system are mainly on the vertical joints. G said the expansion of the steel infrastructure and internal temperature of the building due to the extremely high heat of the bushfire for extended period of time had caused the internal lining boards to delaminate. The applicants have also provided a carpentry report dated 10 December 2014 from DJ. He says he was at the meeting with the adjuster. He noted warps in the internal sheeting material. He assisted G in putting up the new wall. He makes no comment on the cause of damage. He makes no comment on the allegation the adjuster agreed to pay the damage. FSP’s engineer says there was non -standard fixing of boards The panel notes the FSP’s engineer MC inspected the house in February 2012. At that time, MC noted tension cracks in the internal villaboard wall joints. MC noted the villa board had been installed vertically when the installation manual said the villaboard should have been installed horizontally with staggered vertical joints. MC also said the damage to the lining was very minor. MC concluded there were too many unknowns to determine if the radiant heat from the fire caused the damage or if the damage was caused by the non-standard fixing of the villaboard and the lack of expansion joints. In a further report i n April 2012, MC reported the owners were looking to fix gyproc over the villaboard. He noted the owners apparently had a guarantee from an installer that this will complete the task and cracking will not reappear. In his report, G recommended the plasterboard system be fixed horizontally as opposed to the vertical sheets now fitted. The panel infers from this the plasterboard sheets were still fitted vertically. MC indicated in an earlier report this was non- standard fixing. Fair the FSP pay 50% of the cost of repairs to front internal walls Having considered all the material provided, the panel does not accept the adjuster agreed to pay the repairs. The contemporaneous material suggests it is more probable he asked for a report about causation. Case No: 433119 Determination Page 12 of 15 The panel accepts the information provided indicates there are two causes of this damage. One is the extreme heat from the fire which caused the steel infrastructure to expand, damaging the internal lining boards. However, if the boards were still fixed vertically, then information from MC indicates this fixing is non-standard and this together with lack of expansion joints could also be responsible for the damage. On the information provided, the panel considers it is fair in all the circumstances the FSP pay 50% of the costs of the repairs to internal walls in the front section of the house. While various invoices have been provided from SP for various works done, the applicants have not specifically addressed the cost of these repairs. The FSP is to review the invoices and upon agreement with the applicants, pay 50% of the cost of repairs to the internal walls in the front section of the house. Statutory interest is to be paid on the agreed costs from the date the repairs were paid until settlement. 2.4 Is the FSP obliged to pay the outstanding invoices? Applicants claim payment for five invoices By letter dated 20 February 2015, SP provided to the applicants five invoices totalling $94,955.70. SP also provided a breakdown of costs and tradesman’s reports. The ap plicants say the invoices were approved by the FSP’s adjuster. They say there were delays due to the adjuster’s insistence on a breakdown costing to each room. The FSP did not address this issue in the Notice of Response nor in subsequent correspondence. Rather, a report dated 7 July 2016 was provided by the adjuster. The adjuster says all tax invoices received by him from the applicants or SP were passed through to the FSP for payment consideration including costs for the item addressed in 2.3 hereof. FSP has not addressed specific questions asked by FOS The FSP has not addressed the specific questions asked by FOS as to whether the invoices were paid and, if they were not paid, why the invoices were not paid. The invoices are dated late 2014 and early 2015. The material provided shows the FSP agreed to a 10% margin on SP’s work. The adjuster indicated there were inconsistencies with some of SP’s invoices concerning GST. Apparently, some suppliers were not registered for GST but charging GST. In some instances, the adjuster required a supporting tax invoice for the claims made. The invoices do not include the costs of reports from the experts, CO or S. Some of the work done by the plumber is described as “additional costs not related to insurance claim that had been covered by owners.” The panel notes the FSP is not obliged to pay for costs not associated with the insurance claim. Case No: 433119 Determination Page 13 of 15 Some of the cost is for work completed to repairs on the fire damaged internal walls at the front of the building said to be approved by the adjuster. While the panel accepts this work was not approved by the adjuster, the panel determined the FSP is to pay 50% of these costs once agreed by the parties. The table requested by the adjuster has been provided. The table shows all contractors’ amounts divided into costs room by room. One of the documents provided is not an invoice for work done but a quote for work which SP says will be required to replace the concrete path water run-off area once the final building repairs have fi nished. The panel considers the claim for these costs should be submitted when the work is approved and completed. Save for the provision of the limited material from the adjuster, the FSP has not made any submissions about the invoices. The FSP was told adverse inferences would be made in view of lack of submissions. Save for work not yet done and for work not associated with the insurance claim, on the information provided, the panel considers the invoices are for work done in association with the claim and should be paid. Subject to certain provisos, the FSP is to review and pay the invoices Within 14 days of acceptance of this determination, the FSP is to review the invoices and pay the invoices save where:  the invoice is for work yet to be done  the invoice is for work not associated with the insurance claim  there is any duplication of any payment  a payment has already been made by the FSP for the work claimed; or  the amount claimed has been addressed and will be compensated by the findings in Sections 2.1, 2.2, 2.3 and 2.5 of this determination So the applicants may properly consider the FSP’s review of the invoices, once the review is completed, the FSP is to provide an itemised response of its review to the applicants. The panel encourages the parties to reach agreement about payment of the invoices. If the parties are unable to reach agreement, the parties can return to FOS for further determination of this issue. 2.5 Are the applicants entitled to compensation? FOS may award compensation in some circumstances The Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the a pplicant’s expectation of enjoyment or peace of mind. The panel notes the bushfire occurred on 23 November 2011. The issues in dispute were raised some years ago. The panel considers the FSP had ample time to resolve the dispute or provide a mechanism for resolution and yet AL did not provide a report until November 2016. Further, the report did not address one of the issues in dispute. Case No: 433119 Determination Page 14 of 15 While the panel acknowledges the complexity of the dispute and the efforts made by the adjuster to address the applicants’ many issues, i n all the circumstances of the claim and the dispute, the panel considers there has been an unusual amount of time taken to resolve the situation and the F SP’s conduct has interfered with the applicants ’ expectation of enjoyment or peace of mind. Fair the FSP pay $1,500 compensation to the applicants The panel is satisfied it is fair in all the circumstances the FSP pay to the applicants $1,500 compensation. FOS may decide the FSP contributes to the professional costs incurred by an applicant in the course of the dispute. The material provided shows the applicants have sought payment of expert reports from the FSP. The FSP required invoices proving the costs of the expert reports. It is not clear from the material provided whether the invoices have been provided or whether some of the claimed expert reports have been paid by the FSP. Fair the FSP pay the cost of the applicants’ expert reports The panel co nsiders it is fair in all the circumstances the applicants’ expert reports are paid by the FSP. This is because the dispute was complex and the applicants genuinely required expert assistance. Within 14 days of acceptance of this determination by the applicants, the applicants must provide to the FSP the invoices from their experts for expert reports. Within 7 days of provision of the invoices, the FSP is to pay the expert reports or reimburse the applicants for the cost of the reports. Statutory interest is to be paid on these amounts from the date the reports were paid for until the date of settlement. Case No: 433119 Determination Page 15 of 15 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination by a panel. The panel consists of an ombudsman and two panel members with extensive experience in insurance industry matters and consumer complaints. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties. The policy document has been exchanged with the applicants. 3.3 Other relevant material considered and relied on  Parties’ submissions, emails , reports, invoices, photographs and all attachments to all submissions  Correspondence between the parties