Home / Financial Firm (Unknown - Insurer) / Determination 432743

Determination 432743

Drainage, waterproofing and loss of rent claims declined

FirmFinancial Firm (Unknown - Insurer)
Decided2016-12-13
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$45,112
SourceAFCA PDF

Summary

The landlord claimed $40,015.78 for drainage and waterproofing works after heavy rain and $5,096.66 for loss of rent, both declined by the FSP. AFCA found the works were improvements, excluded by the seepage and design exclusions, and the property was not uninhabitable, so nothing is payable.

The drainage works were preventative improvements rather than repair of insured damage, and the water seepage and faulty design exclusions also applied.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 432743 Determination Page 1 of 7 Case number: 432743 13 December 2016 1 Overview 1.1 Dispute The applicant holds a Landlord ’s Accidental Damage Residential Building policy with the financial services provider (FSP). The applicant lodged a claim for water damage to the insured property following heavy rain. The FSP accepted the claim for damage to the laundry. The applicant made a further claim for drainage work, and for waterproofing a wall ($40,015.78). The FSP declined the further claim because it said the works were not to deal with accidental damage, but were improvements. As well, it said exclusions relating to defects and faulty design and workmanship, and water seepage, applied. The applicant also claimed for loss of rent ($5,096.66), but the FSP denied that because there was no evidence the property was uninhabitable. The case manager issued a recommendation that the FSP was not required to pay the claims it had declined. The applicant, through their representative, did not accept this. 1.2 Issues and key findings Is the FSP required to cover the drainage and waterproofing claim? The FSP is not required to pay the claim for drainage and waterproofing work because:  the work represents improvements, which are not co vered under the policy  it would be subject, in any case, to the exclusion for water seepage and the exclusion relating to defects, faulty workmanship and design  the FSP did not authorise the work to be undertaken Is the FSP required to cover the loss of rent claim? The FSP is not liable for the loss of rent claim because the property was not uninhabitable. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to pay the declined elements of the applicant’s claim . Case No: 432743 Determination Page 2 of 7 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. 2.1 The FSP is not required to cover the drainage and waterproofing claim It is the applicant’s responsibility to establish that an insured event occurred. If the FSP then declines the claim, it needs to show that an exclusion applies, or that it is otherwise entitled to do so under the terms of the policy. The claims arose from an insured event The applicant’s policy provides cover for ‘ accidental damage ’ . The policy defines this as an ‘ unforeseen and unintended event and includes a series of accidents arising out of the one event ’ . There is no dispute that heavy rains caused damage to the applicant’s property. On that basis, the FSP accepted the claim for water damage to the laundry, and authorised those repairs. Further works to wall and drainage were not to ‘repair, replace or rebuild’ However, the FSP submits the claim for the further works (in respect of the drainage and waterproofing of the block wall) was not to ‘repair, replace or rebuild the damaged part of the building ’, which would fall within the cover offered by the policy. It says, instead, that they were preventative and/or improvement works, which are not covered. The FSP said the invoices from the applicant’s builders, DBC and M, support this. The DBC invoice includes work to cut and remove the concrete slab, excavate a trench, grinding of a block wall and disposal of material. The FSP’s loss assessor, EA, confirmed the view that DBC’s work does not relate to rectification of damage caused by an insured event, but to long overdue improvement of the property. The M invoice relates to installing a waterproof membrane to the wall, which might also reasonably be regarded as an improvement and preventative measure. The applicant maintains the works were not simply upgrades. He says they were, at least in part, to repair damage sustained and so should be covered to that extent. However, he has not identified the precise damage to the walls and drains that needed repair; but rather, points out on several occasions that the large proportion of the cost of the further works was incurred in finding the cause of the problem. Case No: 432743 Determination Page 3 of 7 Under the circumstances, I am satisfied the works can reasonably be regarded as investigation and improvement works to prevent future problems occurring. The policy does not provide cover for this, and so I consider it is reasonable for the FSP to decline the claim for the further works on that basis. Wall and drainage works are excluded in any case Even if there was clear evidence of actual damage to the wall and drains themselves, the FSP submits that the need to waterproof the block wall and install drainage amelioration infrastructure arose because of a defect, faulty workmanship or design. It also said that what occurred was water seepage. The policy specifically excludes cover for l oss or damage ‘caused by, arising fr om or in any way connected with: … (k) faulty workmanship, inherent defect, errors or omissions in design, structural defects and faulty design (l) water seeping or otherwise percolating through a wall, floor or roof…’ EA reported that the specific damage to the property from the heavy rain was minimal and only affected the laundry cupboards and a section of plasterboard wall in the laundry; noting particularly that no sub-ground drainage was damaged by the event. EA identified the problem as water seeping down the allotment and ponding at the block wall, which was waterlogged, allowing the water to seep into the property. EA said the block wall had not been waterproofed at construction, and insufficient drainage was in place to cope with the heavy rain. EA concluded that this represented a design error or omission. However, the applicant says the torrential rain caused damage when water spilled over what was an otherwise effective barrier. He believes there was no defect or problem with the wall, and the drainage was adequate; although elsewhere, the applicant’s representative says it was not immediately obvious where the water was coming from. In the absence of e xpert or other compelling evidence to contradict EA’s fin dings, I am satisfied, on balance, that the water seepage, together with the lack of waterproofing or sufficient drainage to cope with the rain, means the claim for these further works falls within the exclusions relied on by the FSP. That means the FSP would be entitled to decline the claim on that basis, even if the works had been for repairs in the first place. No evidence that the FSP authorised the wall and drainage works The applicant has himself submitted that the works were diagnostic, remedial and preventative, but says they were undertaken at the request of the FSP. He says he conferred personally with EA’s representative when he attended at the property, and debated possible water sources apart from storm water, and EA agreed the cause of the problem needed to be determined. He maintains that the works were done ‘in consultation with and the approval of the insurer’s representative’. Case No: 432743 Determination Page 4 of 7 I consider it reasonable, under the circumstances, to expect that the conversations between the applicant and EA would cover points such as finding the cause of the problem, and the importance of fixing it; but that does not mean that EA was approving or authorising the works in any formal professional capacity, either on behalf of the FSP or otherwise. I also do not accept that the absence of any call by EA or the FSP for the remedial works to stop can reasonably be regarded as tacit approval or acceptance of liability for the costs the applicant had already decided to incur. The FSP very clearly denies that it or EA authorised any works at the property apart from the repairs to the laundry. It points out that the applicant had already instructed tradesmen and commenced exploratory work before EA inspected the property. This is confirmed in EA’s report of March 2015. EA notes that by the time of its involvement, trenches had already been dug around the property, and it was possible to see that the retaining walls had not been waterproofed, and no provision had been made to construct drainage that would channel the sub-ground water seepage away from the property. EA’s report also records that the applicant had said that he would have to have done the work in any case to prevent further problems. EA said it advised the applicant that it was unlikely indemnity would be granted for the additional works, and this is supported by the comments in both reports indicating concerns about cover. It has also said that if it had assessed or authorised the further works, then there would have been a formal repair work approval in place (such as the one that exists for the laundry repairs). I have not seen anything which confirms that authorisation had been given at any time for the works. Based on the available information, and in the absence of compelling evidence to support the ap plicant’s assertion, I am not satisfied that either the FSP or EA authorised him to undertake the work, or made any representation as to the cover available under the policy for that work. I appreciate that the applicant has felt inconvenienced and incurred costs in dealing with the issues at the property, and in pursuing this dispute. However, I do not consider that is something the FSP can reasonably be held responsible for, since I cannot see that it has acted unfairly in its handling of the matter. I would also point out that this is a service which is free to consumers, and the applicant would have been welcome to come directly to us without having engaged a representative. 2.2 The FSP is not required to cover the loss of rent claim Policy only covers loss of rent if the property is uninhabitable The applicant offered a rent rebate to the tenants, reducing the rent by 50 per cent for several months while the works were being undertaken. The applicant claimed loss of rent for that period. The policy covers loss of rent if the insured building ‘is a tenanted property under a lease and becomes uninhabitable following loss or damage’ arising from an insured event. Case No: 432743 Determination Page 5 of 7 The FSP said the minor water damage to the laundry did not render the property uninhabitab le. This is supported by EA’s assessment, and it is not disputed that the tenants did, in fact, remain in occupation while the repairs were being competed. Based on the available evidence, I am satisfied that the property was not uninhabitable, and so the FSP is not obliged under the policy to pay the loss of rent claim. It is worth confirming that the claim is not otherwise payable as a ‘consequential loss’. This is because the policy only covers consequential loss if it falls within 2 specific ‘loss of rent’ categories: one of which relates to rent default by tenants, and the other, which does not apply in this case, for the reasons above. Case No: 432743 Determination Page 6 of 7 3 Supporting information 3.1 Experts’ reports Record Key points FSP’s expert (EA) Report 05 - 03 - 15  Resultant damage from event is minimal and involves laundry cupboards, and preparing and painting one section of plasterboard wall in laundry.  Caus e of damage from wat er seeping down the allotment at the rear, ponding at the block wall.  During heavy rain, the back of the block wall became waterlogged and water seeped into the adjoining laundry and to bedroom and lounge.  The block wall is not waterproofed and insufficient drainage is in place to cope with these instanc es.  Appears claim is excluded due to water seeping or ot herwise percolating through a wall, floor or roof.  Insured had already commenced work to investigate and rectify the drainage issues. FSP’s expert (EA) Report 05 - 06 - 15  The work described in DBC invoice does not relat e to rectification of damage caused by an insured event, but to long overdue improvement of the property.  The policy only responds to the cost to repair the laundry area.  None of the damage in the laundry would render the dwelling uninhabit able for the loss of rent claim.  The rent rebate the ap plicant negotiated with the tenant relates to the tenant’s reduced enjoyment of quiet possession of the premises, which did not render the property uninhabitable.  Inadequately constructed block wall is a design error or omission. FSP’s expert (EA) Letter 27 - 06 - 16  The applicant’s broker authorised the applicant to proc eed with work to establish the extent of damage to the property.  By the time EA was involved, trenches had been dug, which established that during construction of the extension before the applicant’s purchase of the property, the retaining walls had not been wat erproofed, and there was no drainage to channel sub - ground water seepage away from the property.  The only apparent damage to the property was to panels of laundry cupboards and a section of wall in the laundry, with a repair cost of $2,860.  These repairs were authorised and the applicant accepted the work.  EA did not authorise the sub - ground runoff and waterproofing works to proceed.  EA said it advised the applicant no indemnit y was likely to be granted for the additional claim. Applicant’s expert (DBC)  Cut and remove concrete slab, excavate trenc h around block wall under house, excavate trench outside building foot print to allow Case No: 432743 Determination Page 7 of 7 Invoice 27 - 04 - 15 stormwat er pit and stormwater c onnection, grinding of block wall and footing smooth as per waterproofer’s instruction, dispose all excavated dirt, rock and miscellaneous material, pump water out of trenches, backfill trenches with gravel.  Invoice amount $35, 089. 43. Applicant’s expert (M) Invoice 30 - 04 - 15  Wall seal invoice $691.20.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.