Text of the determination
Determination
Case No: 432732 Determination Page 1 of 6
Case number: 432732 1 3 October 2017
1 Overview
1.1 Dispute
The financial services provider (FSP) accepted a claim the applicants made for
property damage under their home insurance policy.
The applicants were dissatisfied with the initial repairs and lodged an earlier FOS
dispute, following which the FSP undertook rectification works. The applicants were
dissatisfied with the rectification works as well, and so this new dispute was lodged.
The case manager provided the parties with a recommendation on the issues in
dispute, finding substantially in favour of the applicants. A copy is attached to this
determination.
The FSP broadly accepted the recommendation but proposed a memorandum of
understanding (MoU) with the applicant, setting out a framework within which
rectification works would be completed. The applicants also broadly accepted the
recommendation but were reluctant to enter into the MoU, so the FSP offered to cash
settle instead. Given the remaining uncertainty, the dispute has proceeded to
determination.
1.2 Issues and key findings
Were the reasons and outcome of the recommendation correct?
I agree with the case manager’s reasons for the recommendation, which are adopted
in this determination. I also agree with the outcome, in that it is substantially in favour
of the applicant.
However, in light of events and submissions made following the recommendation, I
do not agree with the recommended means of addressing that outcome, which was
that the FSP should undertake the necessary work. Instead, I consider a cash
settlement is fair and appropriate in the circumstances.
1.3 Determination
This determination is substantially in favour of the applicants. Within 14 days of the
applicant’s a cceptance, the FSP must pay the applicants $7,362.50, comprising:
a cash settlement (as set out in section 2.2) for repair/rectification work for
which it is reasonably responsible, based on previous quotes, but increased by
25% to cater for likely subsequent cost increases, and contingencies;
compensation of $2,000 for non-financial loss.
Case No: 432732 Determination Page 2 of 6
2 Reasons for determination
2.1 Were the reasons and outcome in the recommendation correct?
I am satisfied that the case manager’s recommendation contains an accurate
summary of the dispute and the issues to be determined.
I agree that the FSP is liable to the applicants for:
1. sealing and painting the driveway
2. removing and replacing the cracked concrete
3. remediation of concrete blistering damage
4. remediation of vehicle stains on the unsealed concrete panels.
I consider the first three items are addressed by WB’s quote of 31 August 2016, and
the fourth item is addressed by WB’s quote of 21 December 2016 , as set out in
section 3.1 below.
The FSP has accepted liability
The FSP has accepted liability for the four items requiring rectification set out above.
The only remaining question is how the FSP might best discharge its liability in the
particular circumstances. In order to meet its obligations under the policy to cover the
applicants for accidental damage, the FSP has the option to repair the damage or
pay the reasonable costs of such repair as a cash settlement.
Because the recommendation obliged the FSP to undertake the repair works rather
than make a cash settlement, the FSP proposed to the applicant an MoU setting out
a framework for completion of those works. The MoU was offered on the
understanding that the tradesperson appointed to perform the repair works would be
best placed to manage the project, and it sought the applicants’ co -operation to allow
the tradesperson to place a skip-bin and port-a-loo where necessary, and limit
access during demolition, pouring, curing, sealing, and painting of concrete.
The MoU proposed a course of action which I accept was intended to be in the
interests of both parties, and give effect to the terms of the recommendation. The
applicants were not comfortable entering into the MoU, and did not do so ; nor were
they obliged to do so. They were concerned the FSP would not follow through on the
obligations as set out in that document.
It is not appropriate to compel the FSP to rectify the damage itself
There is ongoing uncertainty and concern on the part of both parties, and I consider
the relationship between them now has effectively broken down. So while the case
manager recommended that the FSP be required to undertake repair works to
ensure the driveway was restored (as close as reasonably possible) to its pre -
accident condition, this is not likely to be a workable resolution in the circumstances.
To date, neither the FSP nor the applicants are aware of a contractor who is willing to
carry out the relevant remediation works. While the applicants have understandably
been waiting for resolution of their dispute to enable all repairs to be finalised, t hey
Case No: 432732 Determination Page 3 of 6
still do have a responsibility to mitigate their losses in the meantime. The applicants
have refused offers of cash settlement, and preferred that the FSP arrange repair
works because they do not have capacity to organise the work. The applicants were
concerned that they could not find a tradesperson to undertake the remaining work
required for the cash settlement offered, but have not obtained any quotes to reflect
and meet their needs.
The applicants also wish to install a security gate across the dri veway as part of
private works. The applicants have not done so before this because they fear having
to replace the concrete onto which the gate would be installed. I consider it is
appropriate and am satisfied the applicants are best placed to coordinate the
tradespeople engaged to perform works where some of the works are not part of
their insurance claim. I am not persuaded that it is fair for the FSP to be held
responsible for coordinating tradespeople, particularly in circumstances where the
applicants have expressed a reluctance to collaborate, and an unwillingness to
assume a role in resolution.
The recommendation said that the FSP was not liable to repair any undamaged
areas, which is correct. However, the practicality of it being required to paint the
entire driveway from the front of the garage in the nearest equivalent paint colour to
the existing concrete, raised a concern on the part of the FSP that it might also be
liable to ensure the newly paint surface adhered to undamaged areas which were not
the subject of the incident, and which it was not obliged to repair.
As well, any offer by the FSP to remedy damage that pre-existed the incident is going
beyond their obligations to the applicant. If the applicants elect to have the concrete
painted as provided for in WB’s quote of 31 August 2016, the FSP is not liable to
compensate the applicant for annual maintenance or pre-existing issues. Wear and
tear is an inevitable consequence of property use, and I do not consider it fair and
reasonable to hold the FSP liable for maintenance costs which would ordinarily be
borne by an owner in the usual course of property ownership.
Cash settlement, adjusted for current value, is reasonable in this case
The cash settlement amount is to be determined based on the previous quotes of the
FSP’s provid er, WB (in the absence of any quotes provided by the applicants) and is
to be paid in accordance with the terms of the policy.
Of the rectification works for which the FSP is liable, the concrete blistering damage
(imperfections the size of five cent pieces) is minor and can be remedied by sealing
and painting the driveway, and so I will consider those items together. The
remediation of concrete blistering damage, sealing and painting the driveway,
removing and replacing the cracked concrete are addressed by WB’s quote of 31
August 2016 for an amount of $3,696.
The remediation of vehicle stains on the unsealed concrete panels is addressed by
WB’s quote of 21 December 2016 for an amount of $594.
Those quotes were only valid for 30 days from the date they were each given. In
order to allow for likely increased costs and contingencies such as further cracks in
the concrete (if any) in the 13 and 9 months respectively that have passed since the
Case No: 432732 Determination Page 4 of 6
quotes elapsed, I consider that it is fair to add a 25% allowance onto the two quoted
amounts. This equals an additional $1,072.50.
The applicant is not entitled to interest on the settlement amount
Section 57 of the Insurance Contracts Act 1984 (Cth) provides that the FSP must pay
interest from the time it was unreasonable for the FSP to have withheld payment.
The FSP has not withheld payment, but has offered cash settlement from an early
stage which has been rejected by the applicants. I do not consider it appropriate to
require the FSP pay statutory interest on the cash settlement required.
Compensation of $2,000 for non-financial loss is appropriate and fair
The insured event occurred on 6 June 2013. The repair works have taken some time
due to delays beyond the FSP’s control, associated with private works (the applicants
chose to arrange installation of a post), tradespeople being unavailable or booked
out, un favourable weather, and the applicants’ concerns about performing work over
the winter months.
However, the fact remains that the applicants have not had full enjoyment of their
driveway, and have suffered considerable upset and inconvenience over a long
period because of the actions of the FSP. I am satisfied the award of $2,000 for non-
financial loss is fair in the circumstances.
The applicants have also suffered a recent burglary and attribute that in part to their
inability to install a security gate. The FSP was not liable for installation of a security
gate in the first place, and it is not reasonable to hold the FSP responsible for the
understandable concern this event caused.
If the FSP has already paid the applicants for the non-financial loss as previously
recommended, it is entitled to deduct $2,000 from the total settlement amount.
Total amount payable by FSP
FSP’s payment obligations Amount
For repair/rectification work as follows :
sealing and painting the driveway
removing and replacing the cracked concrete
remediation of concrete blistering damage
$3,696 .00
remediation of vehicle stains on the unsealed concrete panels $594.00
A dditional 25% on the above for increased costs and contingencies $1,072.50
Compens ation for n on - financial loss $2,000.00
Total $7,362.50
Case No: 432732 Determination Page 5 of 6
3 Supporting information
3.1 Scope of works
Record Key points
FSP’s expert (WB)
Report
25 July 2016
The quality of work is as good as any contractor would do in
my opinion. All lines line up and trowel finish is good, and
matches existing concrete.
The colour is hard to match, because it would have had to
come from the same manufacturer that supplied the
existing concrete with the exact same mix and slump. To
get this same mix, you would need the same concreter that
did the original driveway works and mix, which would
achieve a close result but never an exact match, as
environmental factors have impacted the existing driveway.
The newly laid concrete will fade over time, however the
contrast between new and old areas will always be visible,
with the only other option, is to have the entire surface
painted.
In WB profe ssional opinion, the quality and workmanship of
the newly installed concrete meets current industry
standards.
The recently installed concrete trowel finish and levels
matches as best as possible with existing.
The colour of the recently installed concrete will fade over
time, however, will never perfectly match the existing. For
the complete concrete drive way to colour match, WB
recommends sealing and painting the concrete complete.
However, by painting this concrete driveway will require
annual maintenan ce.
FSP’s expert (WB)
Quotation
31 August 2016
Scope of Works
Concrete Drive way
1. Attempt to neatly cut, remove and dispose section of
cracked concrete drive way, next to the gate opening
(approx. 3.0m x 3.0m).
2. Supply and install new concrete section to affected
area only (approx. 3.0m x 3.0m) to match existing as
close as possible.
3. Seal and paint concrete drive way complete – to
garage door. (WB recommends a non - slip paint)
General
4. Remove all builders debris leaving site clean and tidy
$3,696 inclusive of GST
FSP’s expert (WB)
Quotation
21 December 2016
There are tyre marks visible to the unsealed and sealed
sections of the concrete drive way. WB surface cleaning
contractor, who also attended site on 21/12/2016, suggested
a very good chance of removing tyre marks and what looks
like rust stains from the unsealed sections of concrete
Case No: 432732 Determination Page 6 of 6
driveway. Quote for cleaning these areas included in scope
below. Note: The source of the surface rust stains are
unknown, possibly from fertiliser.
There are two small visib le areas of recent surface
lifting/concrete chipped to the newly installed concrete
sections of concrete driveway. These affected areas were not
visible at the time of the first requested inspection and quoted
date 31/8/2016. WB believes these two visible areas are
caused from grit/stone or an air bubble within the concrete
during the pour and/or trowel finish. WB does not recommend
patching these chipped affected areas, as these affected
areas are small (size of 5cent and 10cent pieces), and
shallow. This is normal wear and tear. In summary, the
concrete drive way is fit for purpose.
Scope of Works
Concrete Drive way
1. Attempt to clean tyre tracks from unsealed sections of
newly installed concrete driveway only, ready for
seal/painting.
General
2. Remove all builders debris leaving site clean and tidy
$594 inclusive of GST
Recommendation
Case No: 432732 Recommendation Page 1 of 7
Case number: 432732 16 November 2016
4 Overview
4.1 Dispute
The applicants held a home insurance policy with the financial services provider
(FSP). The applicants made a claim in June 2013 for damage after a third party
vehicle impacted their fence. The FSP accepted the claim.
The applicants lodged a dispute at the Financial Ombudsman Service (FOS) in
March 2014 after initial repairs were unsuccessful. The dispute closed because the
FSP undertook rectification works.
FOS created a new dispute in March 2016, after the applicants advised FOS
rectification works had not been completed.
The applicants are seeking for the FSP to complete further rectification repairs to
return their driveway to the condition it was in prior to the accident.
4.2 Issues and key findings
What is the FSP’s liability for the current driveway damage?
It is fair in these circumstances for the FSP to undertake the required repair works to
ensure the driveway is restored (as close as reasonably possible) to its pre-accident
condition. Further details of this restoration is outlined in Section 3.3 of this
recommendation.
Are the applicants entitled to compensation?
The FSP is not required to pay for the security fence as compensation. However, t he
FSP’s actions in handling this claim have caused the applicants stress and loss of
enjoyment of their driveway. Accordingly, the FSP must pay the applicants $2,000 in
non-financial loss compensation.
4.3 Recommendation
This recommendation is substantially in favour of the applicants. If both parties
accept this recommendation, the FSP must:
undertake the work outlined in section 3.3
pay the applicants $2,000 in non-financial loss compensation.
Case No: 432732 Recommendation Page 2 of 7
5 Reasons for recommendation
5.1 What is the FSP’s liability for the current driveway damage ?
The initial rectification work was not satisfactory
In June 2014, the FSP commenced rectification of the damaged driveway. Broadly,
the FSP completed the initial rectification work, except for the sealing and painting of
the driveway.
The applicants raised an issue to the FSP regarding the quality of the initial
rectification work. The FSP assessed the damage and agreed the initial rectification
work was not satisfactory. Relevantly in August 2016, the FSP’s loss adjustor
confirmed the following issues with the FSP’s work:
the concrete colour does not match
a crack in one of the concrete panels
blistering in three places after the repairer had been working at dusk (the
applicants refer to this as concrete bubbles).
In addition, the applicants are seeking the FSP complete the following work:
repair or remove the concrete so that the vehicle stains are no longer present
the concrete paint should match the existing front presentation of the property
(façade). If not, the entire façade should be repainted to create a uniform
appearance.
FSP seeks to cash settle the dispu te in line with WB’s quote
In attempting to resolve the dispute, the FSP agreed to rectify the colour of, and
crack in, the concrete.
The FSP relies on the terms and conditions of the policy to say it is entitled to choose
whether to cash settle or repair the claim. The FSP says it has chosen to cash settle
the applicants the amount of $3,696 as per builder WB’s quote of 31 August 2016.
WB’s quote does not address concrete blistering or vehicle stains
The applicants assert the blistering was caused by the FSP’s builder laying the
concrete in the evening while there was rain.
The FSP does not dispute the applicant’s assertion. In fact, the FSP’s loss adjustor
presents a position consistent with the applicant. However, the FSP says it is not
obliged to rectify this work, because the applicants previously agreed to forego this
aspect of their dispute.
In their dealings with FOS, the applicants maintain the blistering is to be repaired.
Given this, I do not accept the applicants have foregone this aspect of their dispute.
As the concrete blistering was not present prior to the accident, and based on the
submissions of the parties, I find concrete blistering is most likely caused by the
FSP’s builder. For this reason, the FSP is responsible to rectify the co ncrete
blistering.
Case No: 432732 Recommendation Page 3 of 7
With regard to the vehicle stains on the driveway, the FSP claim note on 23 May
2015 states:
“While I am in favour of the painting being cash settled, I don’t believe the insured will do this.
Shane - can you put it to her that we cannot wait 3 months for the painting to be completed and that
in that time oil/grease etc on the new concrete could potentially cause issues with any new paint that
is applied. As such, we either authorise the works now or we will c/s the paint. Can you let me know
what she says - it may need to go back to [FSP] if she refuses either of these .”
The claim notes show the FSP’s builder (CS) spoke to the applicants who in turn
advised they would not allow the painting to take place until after the winter period. In
response, on 26 May 2015 the FSP placed the file in abeyance until September
2015. This action by the FSP was inconsistent with its claim note dated 23 May 2015.
Additionally, the applicants say CS did not advise them of be negative impacts the
delay may cause to the concrete. This is significant, particularly because the FSP
was clearly on notice that CS “could not wait 3 months for the painting to be
completed”.
The FSP was aware that stains could occur (as well as issues with painting) prior to
its decision to wait three months before doing the works. Therefore, it is my view that
the FSP should remediate any stains that are now present on the unsealed concrete
panels.
Given the errors of the FSP or its agents caused the blistering and vehicle staining to
the concrete, WB’s quote should address these issues. Given WB’s quote does not,
it should not be relied upon as the sole basis to settle this dispute.
It is fair in the circumstances for the FSP to repair the property
The FSP relies on the terms and conditions of the policy to say it is entitled to choose
whether to cash settle or repair the claim. The FSP says it has chosen to cash settle
the applicants as per WB’s quote.
Generally, a FSP is entitled to rely on its policy provisions to choose whether it will
repair or cash settle a claim.
However, in the particular circumstances of this dispute, I do not believe the FSP’s
cash settlement will fairly discharge the FSP’s liability for the claim. This is because:
For the reasons set out above, WB’s quote does not encompass all of the
remediation works required.
The required scope of works are not straight forward and may require
adjustment depending on whether the stains and blistering can be repaired
through patching, sealing and painting, or whether new concrete is required to
the poured.
FOS has not been presented with sufficient information to assess whether the
sealing and painting of unsealed concrete panels (left unsealed since May
2015) will be able to occur to an appropriate standard consistent with the
existing concrete panels.
Case No: 432732 Recommendation Page 4 of 7
WB is not prepared to do the repairs. At this time, neither the FSP nor the
applicants are aware of a contractor who is willing to carry out the relevant
remediation works.
Accordingly, the fair outcome is for the FSP to undertake remediation works to
ensure the driveway is restored (as close as reasonably possible) to its pre -accident
condition. This work is outlined in Section 3.3 of this recommendation.
FSP is not required to paint the façade to create a uniform appearance
The applicants assert if the FSP cannot reasonably match the existing paint cover of
their driveway, it should paint the façade to create a uniform appearance.
Reviewing the policy, it clearly states the FSP is entitled to use the nearest available
equivalent material if the original material cannot be used. Additionally, the policy
also says the FSP will not repair any part of the home that has not been damaged.
The FSP is entitled to settle the claim in accordance with these policy conditions.
That is:
the FSP is entitled to paint the driveway in the nearest equivalent paint colour to
the existing concrete
given the façade is not damaged, the FSP is not required to paint the façade to
create a uniform appearance.
5.2 Are the applicants entitled to compensation?
FSP is not required to pay to install a security fence at the property
The applicants say once the repairs were completed, they wished to install a security
fence at the foot of the driveway. Given the FSP’s handling of the claim, the
applicants seek for the FSP to pay for the security fence.
While I find the FSP’s handling of the claim is deficient, the FSP is not required to
pay for the security fence. This is because:
The security fence is an enhancement to the home and the applicants were
always going to incur this cost.
In any event, the available information is insufficient to establish the applicants
suffered a consequential financial loss for which they should be compensated.
Non-financial loss compensation of $2,000 is warranted
Under its Terms of Reference, FOS may consider awarding compensation for non-
financial loss where there has been an unusual extent of physical inconvenience,
time taken to resolve the situation or interference with the applicants ’ expectation of
enjoyment or peace of mind.
It is clear that the applicants have not had the enjoyment of their driveway for a
period of years and have suffered stress and inconvenience due to delays in
rectification repairs. For this reason, the applicants are awarded $2,000 in non-
financial loss.
Case No: 432732 Recommendation Page 5 of 7
6 Supporting information
6.1 Product disclosure statement
“What we will pay for
We will cover you for accidental loss or damage to your home occurring during the period of
insurance.
How we will settle your claim:
We will at our option:
1. repair or rebuild the damaged part of your home to the same condition as when it was new;
2. pay (including, if we choose, to you) the reasonable cost to repair or rebuild the damaged part of
your home to the same condition as when it was new; subject to the following limitations :
1. if rebuilding does not commence within six months of the date of loss or damage, unless we agree
otherwise in writing, our liability will be limited to the amount it would have cost to repair or rebuild
your home at the date of accidental loss or damage.
2. where it is not possible to use the original materials, we will use the nearest available equivalent.
3. we will not repair or rebuild or pay to repair or rebuild any part of your home which has not been
physically damaged.
Rebuilding may take place at a different site provided we agree in writing.
We will also cover you for the cost of complying with any government or local authority regulations
or by-laws, which arises solely as a result of repairing or rebuildin g the damaged part of your home.”
6.2 Timeline of events
Date Action
0 6 - 06 - 2013 Claim lodged for driveway.
29 - 11 - 2013 Applicants accept scope of works to repair driveway.
10 - 12 - 2013 FSP commences concrete repairs to driveway.
11 - 02 - 2014 Applicants advise FSP that FSP contractor caused damage to the concrete during
repairs.
21 - 02 - 2014 Applicants lodge original dispute with FOS.
18 - 07 - 2014 FOS closes original dispute, as FSP authorised concrete repairs.
19 - 09 - 2014 Applicants advise FSP their additional works outside the insurance claim should be
addressed by end of the week.
0 4 - 11 - 2014 FSP loss adjustor advises FSP concrete repairer cannot commence works until
January 2015.
10 - 02 - 2015 FSP builder liaise with applicants about the pigment information of the conc rete and
as such it cannot be remixed at this time.
21 - 02 - 201 5 FSP internal email advises driveway will not be able to be exactly matched due to
original details of coloured concrete not being ava ilable.
Case No: 432732 Recommendation Page 6 of 7
23 - 02 - 2015 Applicants authorise repair works to commence.
24 - 03 - 2015 Rectification repairs placed on hold due to applicants seeking concrete specifications
for private work to be done at the property.
15 - 05 - 2015 FSP repairer states the repair works have been completed.
26 - 05 - 2015
Applicants informs FSP, through its repairer, to complete repairs rat her than cash
settle the claim. FSP places fi le in abeyance until September 2015 to allow concrete
to fully cure and for weather to clear.
0 1 - 09 - 2015 FSP repairer advise s it will liais e with applicants to book repairs in for December
2015.
17 - 11 - 2015 Applicants advise FSP they seek colour match or entire concrete area to be painted to
create uniform appearance.
25 - 11 - 2015 FSP builder provides quote totalling $2,760 to prepare, seal and paint concrete.
26 - 11 - 2015 FSP loss adjustor advises paint colour was a custom tint and it may need to paint th e
entire area to create uniform appearance .
03 - 12 - 2015
Applicants email FSP saying:
the supplier advised the paint colour could be matched close, but it was not
guaranteed. Applicants request FSP to repaint whole conc rete area if paint does
not match.
there is a rise in the concrete which may affect the operation of a security gate the
are looking to install.
they expect compensation if the installation costs increase due to the rise.
16 - 06 - 2016 New dispute at FOS opened.
24 - 06 - 2016 FSP allocates loss adjustor to visit property to view applicants’ concerns with the
driveway.
30 - 06 - 2016
FSP loss adjustor emails FSP advising it has visited the property and provides
remarks relating to visual inspection. Notes obvious mismatch bet ween old and new
driveway panels.
25 - 07 - 2016 Applicants request FSP loss adjustor attends the property with them present to
discuss their concerns.
27 - 07 - 2016
WB provides report stating that repairs as good as any contractor would do. Advises
contrast betwe en new and old areas will always be visible and the only other option to
have the entire surface painted.
19 - 08 - 2016
FSP loss adjustor provides report of driveway damage. States:
driveway repaired to reasonable standard.
would have expected trades to achieve a more consistent colour match.
Crack on existing panel requires repair.
Blisters in three plac es need to be rectified.
Case No: 432732 Recommendation Page 7 of 7
6.3 How this dispute should be settled
The FSP is required to undertake the required repair works to ensure the driveway is
restored (as close as reasonably possible) to its pre-accident condition. This work
includes:
sealing and painting the driveway as outlined in WB’s quote
removing and replacing the cracked concrete as outlined in WB’s quote
remediation of concrete blistering damage
remediation of vehicle stains on the unsealed concrete panels.
Additionally, the FSP is required to pay the applicants’ $2,000 non -financial loss
compensation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.