Text of the determination
Determination
Case No: 431657 Determination Page 1 of 7
Case number: 431657 20 January 2017
1 Overview
1.1 Dispute
The applicant held a home and contents insurance policy (the policy) for his home
with the financial services provider (FSP). On 24 November 2015, as a result of
liquid leaking from a common wall between a bathroom and a bedroom, the applicant
made a claim under the policy. The FSP’s assessor attended the insured home on 25
November 2015, with the FSP’s contractors then attending to remove plaster from
the bedroom wall on 7 December 2015.
From that point in time, no further rectification, repair or make-right works were
conducted on the applicant’s home, with the applicant not advised for a further two
months that the FSP has declined his claim (on the basis that the claimed damage
was due to defective waterproofing, which was not covered by the policy).
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was substantively in favour of the FSP.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
The FSP was entitled to deny the applicant’s claim because the policy wording had a
clearly stated exclusion, providing that the policy would not cover damage caused by
water escaping from a shower due to defective waterproofing.
Did the applicant suffer loss as a consequence of the FSP’s delay in telling him
that his claim had been declined?
I agree with the case manager’s assessment that the applicant has not shown that
the FSP’s conduct caused him to suffer financial loss.
I am satisfied on the balance of available information in this dispute however, that the
applicant has established that he suffered both consequential (indirect) and non-
financial losses as a result of the FSP’s two month delay in telling him that his claim
had been denied.
1.3 Determination
This determination is partially in favour of the applicant and partially in favour of the
FSP.
Case No: 431657 Determination Page 2 of 7
The FSP was entitled to deny the applicant’s claim. However, the FSP’s delay in
communicating that denial to the applicant did cause him to suffer consequential and
non-financial losses, for which an award of compensation is appropriate . Those
losses and corresponding compensation amounts are as follows:
Consequential loss – being the loss of the opportunity to have an appropriately
qualified relative attend to the required repairs (for a heavily discounted price),
as a consequence of the FSP’s delay in informing the applicant that his claim
had been declined. In the circumstances of this dispute, the amount of $3,300
in compensation is appropriate (being the maximum amount that FOS can
award, under our Terms of Reference, for consequential loss compensation)
Non-financial loss – flowing from the stress caused by the FSP’s conduct in
failing to inform the applicant that his claim had been declined and in failing to
ensure that the works conducted by its contractors (once terminated) were left
in a safe manner. In these circumstances, non-financial loss compensation of
$300 is appropriate.
Should that applicant accept this Determination, within 30 days of its date (above), in
full and final settlement of his dispute, within a further 14 days of that acceptance, the
FSP must pay the applicant a total compensation sum of $3,600 .
Case No: 431657 Determination Page 3 of 7
2 Reasons for determination
2.1 W as the FSP entitled to deny the applicant’s claim under the policy ?
The claimed losses fell within a policy exclusion
The policy excluded cover for loss or damage caused by the sudden and unexpected
escape of liquid from a water main, water pipe, sink, basin, bath or toilet. The policy
also provided that cover was excluded for any loss or damage caused directly or
indirectly by or in connection with defects, wear and tear or a lack of maintenance
(amongst other things).
The balance of information available in this dispute supports a finding that the most
likely cause of the water leaking into the bedroom at the applicant’s home, was
defective waterproofing in the shower area of the adjacent bathroom. On that basis, I
am satisfied that the water damage related loss claimed by the applicant under his
policy, was not covered by the policy on the basis that it fell within the policy
exclusions.
The applicant has not disputed the findings of the FSP’s report, which concluded that
defective waterproofing was the most likely cause of the damage: He has not
provided any contradictory reports of his own.
The FSP was entitled to decline the applicant’s claim under his policy.
The FSP’ s assessor recommended make safe works be undertaken
The available information in this dispute suggests that the FSP’s assessor
recommended make safe works be undertaken to allow for mould treatment to be
effected. It appears that subsequently, after the provision of a plumbing report about
the cause of the leak (on 25 November 2015), the FSP decided to decline the
applicant’s claim , but failed to communicate this to the applicant for quite some time.
In his recommendation for this dispute, the FOS case manager observed that it is
unclear why, on 7 December 2015, after it appears that the FSP had decided to
decline the claim, the FSP’s contractor s attended the applicant’s home and
commenced work on the common wall between the bathroom and the bedroom. I
a gree with the case manager’s observation that the reasons why the FSP’s
contractors did this are opaque. It appears that there was a communication
breakdown between the FSP and its contractors, with the contractors not informed of
the FSP’s change of position regarding the applicant’s claim until after they had
commenced work on the wall.
What is clear however, is that no one advised the applicant that his claim had been
denied or why. In these circumstances and given the proximity to Christmas, it is
perfectly understandable why the applicant assumed that his claim had been
accepted and that the contractors would return after the end of year break.
Case No: 431657 Determination Page 4 of 7
2.2 Has the applicant suffered loss as a consequence of the FSP’s
conduct?
The work by the FSP’s contractor s did not cause additional costs
The FSP’s contractors failed to complete the scope of works by not sealing up the
plasterboard that they had removed to effect anti-mould treatment. However, I am not
satisfied that in and of itself, this caused the applica nt to incur additional direct costs
(financial loss), as the removal of the plaster from the bedroom wall to effect anti-
mould treatment would have been required in any event to effect the repair works
being contemplated by the applicant. The applicant has not disputed this.
The FSP’s unreasonable delay in notifying the applicant of the decline of his
claim caused him to suffer consequential (indirect financial) loss
The FOS case manager in his recommendation found that the applicant had failed to
establish that the FSP’s two month delay in notifying the applicant of the decline of
his claim, had caused him to suffer loss.
Having independently reviewed the available information in this dispute, I am
satisfied that the applicant has established that he suffered indirect financial loss
(being increased remediation costs) as a consequence of the FSP’s conduct. I am
also satisfied that these losses cannot be characterised as direct losses. Those
losses were not directly caused by the conduct of the FSP, but rather, were one step
removed, being as a consequence of the FSP’s conduct.
As noted above, g iven that the FSP’s contractors had attended the applicant’s home
and commenced work, the applicant had reasonably assumed that his claim would
be accepted and the contractors would return after the Christmas break. After the
contractors had not returned, he had heard nothing more from the FSP and a period
of two months had passed, the applicant called the FSP to ask when the repair works
would be completed. It was only then that the applicant was informed that his claim
had been denied.
The applicant has provided information that is, in my view, sufficient to show that in
December 2015 through to January 2016, he did have the opportunity of having a
holidaying (and appropriately qualified and experienced) relative, conduct the repairs
for him at a very competitive price. The applicant says that he lost that opportunity
as a result of the delay by the FSP (as the relative is no longer available, has
changed occupations and lives some distance away). He says that he is now facing
significant increased costs to complete the remediation works (approximately
$10,000 more) and has provided corroborative evidence. I am persuaded by the
applicant’s submissions and supportive information in this regard. I note further, that
throughout the life of this dispute, the applicant’s position and arguments in relation
to his losses have remained unchanged and consistent.
The applicant also says that the delay also caused significant inconvenience for the
applic ant’s family (non-financial loss), as with the bedroom wall removed and pipes
exposed, the bedroom was not safe and in the circumstances, was hazardous, for its
occupant (the applicant’s child).
Case No: 431657 Determination Page 5 of 7
The information available in this dispute s upports a conclusion that the FSP had
decided to decline the applicant’s claim in December 201 5 (before the Christmas
break) and that it was due to the decline decision that the tradespeople
commissioned by the FSP abruptly left the applicant’s home. I am satisfied that a
combination of the FSP’s delay in communicating that decline decision to the
applicant and the applicant’s lack of follow up with the FSP until after his relative was
no longer available, did cause the applicant to lose the opportunity of having his
relative conduct the repairs at a discount price.
In making that observation, I consider that while the applicant could be argued to
have contributed to his loss by not following up with the FSP (had he done so earlier,
his relative may have still been availab le to do some of the work), in the
circumstances, it is only fair that the weight of responsibility for his loss must rest with
the FSP. The FSP was obliged to communicate the decline of his claim to the
applicant in a timely manner and failed to do so. In these circumstances an award
for consequential loss of $3,300 is appropriate.
The exclusion on cover for consequential loss in the policy is inapplicable
Clause 36 on page 77 of the Product Disclosure Statement for the policy provides
that the FSP will not provide cover for consequential losses. However that clause
relates to consequential losses arising from a claimed event, rather than
consequential losses arising from the conduct of the FSP.
I am satisfied, in this case that the consequential losses incurred by the applicant
arose solely from the conduct of the FSP in delaying notification of the claim decline
to him (rather than the claimed event). That is, the policy wording and exclusion for
consequential losses, does not cover the circumstances of the applicant’s loss,
meaning that the compensation awarded to him above remains valid and appropriate
(and clause 9.3 of the FOS Terms of Reference relating to exclusions for
consequential loss is inapplicable).
The applicant suffered non-financial loss
I am satisfied that the way in which the FSP’s trades people left the insured home
(with incomplete and unsafe works), in addition to the FSP’s delay in communicating
the decline of his claim to the applicant, would have caused a degree of stress and
inconvenience to the applicant, particularly given the time of year. In the
circumstances of this dispute an award of $300 in non-financial loss compensation is
appropriate, to compensate the applicant for that aggregate stress and
inconvenience.
Case No: 431657 Determination Page 6 of 7
3 Supporting information
3.1 Background to the applicant’s claimed losses
Consequential loss
The FSP’s contractor priced the total repairs to the applicant’s p roperty arising from
the claim at $12,242.51. The applicant says that he had the period of December
2015 to January 2016 inclusive in which he could have arranged repairs for a total
cost of $2,456.50 by his brother in law (PB).
The applicant says, as a result of the FSP’s delay in notifying him that his claim had
been denied, the applicant has lost the opportunity to have the repairs done by PB at
the lower cost. The applicant says he has suffered a financial loss of $9,786.01 as a
result of the FSP’s delay.
In support of this contention, the applicant says that:
“ I was able to engage a licensed builder in late December 2015 and early January
2016. The licensed builders name is [PB]. He lives in Lismore NSW (over an hour
away) and is a family member who was able to attend my property on his holidays
and complete work at the trade cost of materials. [PB] is now back at his own work
(he has since changed his line of work) and unable to complete work on my property,
which has directly cost me almost ten thousand dollars. PLEASE SEE ATTACHED
LETTER AND QUOTE. The quote obtained from [the FSP’s contracto r] is
$12,242.51.
The quote from PB is $1556.50.
I spoke to PB further to confirm the quote did not include the cost of the labour or
materials of the following trades, but I have included details: Waterproofing $600.
Plumber (to check pipe work 1 hour) $100. Plasterer (1 hours work) $100. Electrician
to connect power to the bedroom (1 hour) $100.
The total cost to me would have been $2456.50 ”
The applicant provided a copy of an undated letter from PB saying that he was
prepared to do the work, but that he is no longer able to. The applicant has also
provided an undated quote on PB’s letterhead for the $1,556.50 referred to above.
The applicant has in his post recommendation submissions explained why PB can no
longer do the work. I am persuaded by these explanations. I note that the quantum
of the works required (as evidenced by the size of the FSP’s contractor’s quote) is
not menial and would take several days of full- time work. Given PB’s changed
circumstances, it is understandable why he is no longer willing or available to
conduct the works.
Non-financial loss
The applicant stated that the plasterboard which was removed by the FSP’s
contractors remained exposed. The applicant describes the situation as follows:
“On the 7 th of December 2015 I received phone calls from multiple trades who later that
day attended my property and commenced work. One worker walked out of the
bedroom with the phone in his hand looking confused and stated “ that’s all I’m
authorized to do today”.
Case No: 431657 Determination Page 7 of 7
I then entered the bedroom and observed ¾ of my bedroom wall removed, pipes
exposed, part of stud removed, sharp nails exposed and mould on the carpet. I
engaged in a further conversation about my claim with the worker and he stated “we'll
have to remove the hallway wall too, but we won’t get to that today” and “ these pipes
will get hot so be careful of the little ones before we come back and fix it up ”
Obviously, no further work to seal up the hole was undertaken and to exacerbate
things further, there was a two month delay before the applicant was advised that his
claim under the policy had been denied by the FSP. The applicant only discovered
the status of his claim after he contacted the FSP to follow up on the further works.
The applicant was, understandably, under the impression that the claim had been
accepted up until this point.
In my view, I consider that the applicant would have experienced stress and
inconvenience, beyond what I would expect to be tolerated by a customer, as a result
of the incomplete and unsafe works and the unreasonable delay in being notified that
his claim had been denied. I consider an award of $300 to be appropriate non-
financial loss compensation in the circumstances.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.