A company's business insurance claim for awning damage from a truck impact was limited by the FSP to impact damage only. AFCA found the FSP had not proven corrosion or maintenance exclusions, so it must settle the replacement of the awning, pay $240 prop hire and statutory interest, but loss of rent claims were refused.
The insurer bears the onus of proving an exclusion applies, and it did not establish that corrosion or maintenance caused the damage after failing to undertake the inspection its engineer recommended.
Issues
- Claim denial primary · upheld
“As the FSP is not entitled to rely on the policy exclusion, the FSP is to settle the applicant's claim to remove and replace the awning in accordance with the policy terms.”
- Claim amount dispute secondary · not upheld
“Not satisfied the FSP is obliged to pay the applicant for the claim for loss of rent or costs associated with finding a new tenant.”
- Inadequate claim investigation secondary · upheld
“The FSP did not undertake the actions recommended by its engineer and so did not thoroughly inspect the corrosion and extent of corrosion.”
Subjects and remedies
small businesspay claimpay compensationpay interest
Text of the determination
Determination
Case No: 431608 Determination Page 1 of 8
Case number: 431608 23 November 2016
1 Overview
1.1 Dispute
The applicant held a Business Insurance Policy with the financial service provider
(FSP). A truck collided with the awning of the insured property. The FSP ‟s builder
attended to make-safe the awning and engaged an engineer.
Relying on the engineer‟s opinion, t he FSP says it is not liable for the wear and tear
issues with the awning and paid the applicant the amount for the damage it says was
directly caused by the truck impact.
The applicant says the awning was not new, however its structure would not have
been compromised had the truck not collided with the awning. It says the amount
paid is insufficient and makes other claims consequent upon the damage to the
awning.
1.2 Issue and key findings
Is the FSP entitled to limit its liability for the damage to the awning?
On the material provided, the FSP has not established on the balance of probabilities
the impact did not cause any moveme nt of the steel structure. Further, the FSP did
not undertake the actions recommended by its engineer and so did not thoroughly
inspect the corrosion and extent of corrosion to establish on the balance of
probabilities this was the cause of damage.
Although parts of the structure of the awning were corroded, the material provided
does not establish on the balance of probabilities the claimed damage was caused
by or arose from the corrosion and/or maintenance or defects issues.
In these circumstances, the FSP is not entitled to rely on policy exclusions to limit its
liability for the damage to the awning.
1.3 Determination
This determination is substantially in favour of the applicant.
Within 14 days of acceptance of this determination by the applicant, the FSP is to
prepare a scope of works in conjunction with the applicant in relation to the costs to
remove and replace the awning new for old. At its discretion, the FSP can choose to
replace the awning as the awning has been removed. Alternatively, the FSP can
cash settle the applicant the reasonable costs of removal and replacement of the
Case No: 431608 Determination Page 2 of 8
awning pursuant to the policy terms and conditions less the amount paid by the FSP
to the applicant already.
Subject to proof of payment, the FSP is also to pay the applicant:
$240 (prop hire)
statutory interest on $4,840 (the claimed removal costs of the awning)
statutory interest on $240, both to be paid from the date of payment by the
applicant until settlement by the FSP.
The FSP is otherwise not obliged to take any further action or make any further
payment to the applicant in relation to the claim or the dispute.
Case No: 431608 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the FSP entitled to limit its liability for the damage to the awning?
Impact damage to the awning was caused by the truck
The applicant must show on the balance of probabilities it has suffered a loss caused
by an event to which the policy responds. This is known as a prima facie claim.
The FSP says there is no dispute the policy responds to the impact damage caused
by the vehicle. I am satisfied the applicant has established a prima facie claim.
FSP must establish damage caused by lack of maintenance or defects
The dispute is whether the FSP is entitled to limit its liability to what it says is the
impact related damage or if the FSP is required to replace the awning completely.
The onus rests with the FSP to establish on the balance of probabilities an exclusion
applies if it seeks to deny or limit its liability for the loss.
The applicant provided quotes from two builders. The applicant contends both
builders support its contention the truck‟s impact resulted in the requirement to
replace the entire awning. One quote says:
„ Existing awning is beyond repair due to the movement of the steel structure from
impact damage”‟.
Relying on this, the applicant submits the awning cannot be repaired. It admits the
awning required maintenance but submits, had the truck not impacted the awning, it
would not need to be replaced. In further support, the applicant contends the FSP‟s
builder provided a quote to repair the damage rather than effect repairs as the builder
knew the awning was not repairable because of the truck impact.
The FSP submits it is entitled to rely on its engineer‟s report which limits the impact
damage to the front face signage and a section of the soffit lining. It says it has fully
indemnified the applicant in relation to impact damage. The FSP submits if the
awning needed to be completely replaced it was not because of the low speed
impact by the truck but because of corrosion and maintenance related issues.
The FSP also submits its builder was not able to conduct the repairs as it could not
warrant the repairs due to the maintenance issues identified with the awning. It says
it is satisfied from the reports obtained the damage caused by the truck is repairable.
The FSP arranged for a builder to inspect and photograph the impact damage a few
weeks after the impact. The builder said the damage was minimal but consistent with
the impact. The builder removed the collapsed section of the lining and installed four
props to the street edge of the awning.
The builder noted the structural steel outriggers which support the awning frame to
the facade brickwork were offset from the brickwork but the builder could not confirm
if this was due to the impact or whether it was an age-related issue. The builder
engaged an engineer for advice.
Case No: 431608 Determination Page 4 of 8
The FSP‟s engineer inspected and photographed the awning on 29 October 20 15.
The engineer examined the tie rod anchorages and brickwork behind them “as far as
possible from ground level” and considered the impact did not cause any movement
of the anchorages or cracking of the brickwork into which the anchorages extend.
The engineer also noted the bottom flanges of the channel beams (referred to by him
as PFC‟s) which form the perimeter of the awning, the tie rods and ends of the
anchorages were corroded. The engineer agreed the vehicle impact had damaged
the front signage and soffit lining. The engineer thought the truck may have also
damaged the PFC to which the front signage is fixed, but could not confirm this until
the signage was removed. The engineer was concerned about the corrosion noted in
his report which he said may have compromised strength. In view of the corrosion,
he recommended parts of the awning be stripped off so the PFC‟s could be inspected
and the extent of the corrosion ascertained.
FSP did not take steps recommended by its engineer
The FSP also relies on a n email from the engineer‟s office. The email is not from the
engineer who actually inspected the awning. The writer of the email looked through
the file and photographs and noted the damage was not consistent with the truck
travelling at low speed. However, the email confirms:
„ We can only provide an opinion on the structure from what we can physically see, and
we have recommended other steps to do in our report. ‟
The FSP did not undertake the other steps recommended by the FSP. As it did not
strip off the various parts recommended by the engineer, the PFC‟s and other parts
were not inspected and the extent of the corrosion ascertained. Rather, the
engineer‟s observations in his report are made “as far as possible from ground level”.
In order to succeed, the FSP must establish on the balance of probabilities the
damage claimed was caused by or arises out of corrosion, gradual deterioration,
wear and tear or obvious existing defects or lack of maintenance.
The FSP‟s builder says the structural steel outriggers are offset from the brickwork.
The applicant‟s expert says the awning cannot be repaired due to the movement of
the steel structure from impact damage . The FSP‟s engineer did not make this
finding but says he examined from ground level only. In these circumstances, I am
not persuaded on the balance of probabilities the FSP has established the impact did
not cause any movement of the steel structure.
Furthermore, the FSP‟s engineer‟s opinion mainly addresses his concern about the
corrosion of the structure. He made certain recommendations and offered to further
inspect once the corroded members had been exposed. However, the FSP did not
undertake the actions recommended by its engineer and so did not thoroughly
inspect the corrosion and extent of corrosion.
In these circumstances, considering all the material provided, although I accept parts
of the structure of the awning were corroded before the impact, I am not satisfied the
FSP has established on the balance of probabilities the claimed damage was caused
by or arose from the corrosion and/or maintenance or defects issues.
Case No: 431608 Determination Page 5 of 8
FSP to settle the applicant’s claim in accordance with policy terms
As the FSP is not entitled to rely on the policy exclusion, the FSP is to settle the
applicant‟s claim t o remove and replace the awning in accordance with the policy
terms and conditions. The policy outlines how the claim should be settled.
The applicant claims $28,173.66 summarised as follows:
Awning replacement $18,480 including GST
Prop hire $240
Awning removal $4,840
Loss of Rent $5,356
Leasing costs – new tenant $2,291.66
Total $31,207.66 including GST
Less payment made by FSP $3,034.
FSP to prepare a scope of works to replace the awning or cash settle
The applicant provided two quotes to remove and replace the awning. One was
obtained in December 2015 in the amount of $19,580 including GST. The other
quote was obtained in January 2016 in the amount of $16,800 plus GST.
The FSP has not challenged the applicant‟s quotations.
The FSP is entitled to decide whether it will pay the cost of removing and replacing
the awning or cash settle the applicant taking into account the amount paid already
by the FSP to the applicant.
The quotations are nearly a year old. In those circumstances, the FSP is to prepare a
further scope of works in conjunction with the applicant in relation to the costs to
remove and replace the awning new for old. At its discretion, the FSP can choose to
replace the awning or cash settle the applicant the reasonable costs of removal and
replacement of the awning pursuant to the policy terms and conditions (taking into
account the amount paid already).
If the FSP cash settles, it remains necessary for the amount of the cash settlement to
be agreed, based on the scope of works to be prepared by the FSP. FOS
encourages the parties to this dispute to resolve any issues which might arise during
that process. However, the parties can return to FOS if they are unable to resolve
any issues arising from the scope of works and/or the costing of that work.
Subject to proof of payment, FSP to pay applicant statutory interest on $4,840
On 22 April 2016, the applicant says he removed the awning at a cost of $4,840. He
submits this had to be done as it was difficult to find a replacement tenant with the
props supporting the awnings in place.
The quotes relied on by the applicant to replace the awning include the cost of
demolishing the existing awning and removing all rubbish and leaving the site clean.
In these circumstances, as long as the FSP indemnifies the applicant for the cost to
demolish and remove the awning, in addition to the costs of replacement, I am not
satisfied the applicant is entitled to the separate costs of removal of the awning.
However, I am satisfied it may have been difficult to find a new tenant with the props
supporting the awnings in place.
Case No: 431608 Determination Page 6 of 8
Therefore, it is fair in all the circumstances the FSP pay to the applicant statutory
interest on $4,840 from the time the applicant paid for the awning demolition until
payment by the FSP. The applicant is to provide the FSP with proof of payment of
the tax invoice dated 2 May 2016.
Subject to proof of payment, FSP to pay applicant $240 and interest
In March 2016, the FSP stopped paying the cost of prop hire which supported the
awning and kept it safe. The applicant provided invoices showing the cost of prop
hire in the sum of $240 from 18 March 2016 until 22 April 2016.
I am satisfied the cost of prop hire was necessary in the circumstances. The FSP is
to reimburse the applicant $240. The FSP is also to pay statutory interest on $240
from the time the applicant paid for the prop hire until payment by the FSP. The
applicant is to provide the FSP with proof of payment of the prop hire.
Claim for loss of rent and costs of finding a new tenant not established by
lease terms or photographs
The applicant claims his tenant‟s business was adversely affected because of the
props holding the awning. As a result, he says the tenant vacated the property on 19
February 2016. The tax invoice from the app licant‟s agent confirms the tenant
vacated 19 February 2016.
The applicant says the property was vacant until 1 May 2016 and claims loss of rent
during this period. The applicant also claims $2,291.66 being the costs associated
with finding a new tenant.
The FSP submitted the applicant must establish the insured event was the direct
cause of the loss. The FSP accepted minor damage to the awning only. It did not
accept it was liable to replace the awning. If it was liable, it accepted it was obliged to
replace the awning on a new for old basis.
The FSP also submitted the minor impact damage did not make the property un-
tenantable and the additional benefits in the policy do not apply as the FSP had not
accepted the claim for replacement of the awning. It did not otherwise address the
quantum of the applicant‟s claim.
The FSP‟s policy provides cover for a reduction in the applicant‟s business revenue
or increased costs of working as a result of damage to property caused by any of the
insured events. Revenue includes rental income.
The FSP‟s schedule shows the insured building was occupied by a solicitor and by a
light and lamp fittings shop.
The material provided by the applicant shows it entered a commercial lease on 26
February 2015 with tenants. The premises were to be used only as a showroom for a
lighting business and residence. The term of the lease was 10 months commencing
on 20 April 2015 and ending on 19 February 2016. The option clause shows the
landlord offered a renewal of the lease for the furthe r term of “nil years.”
The material provided by the applicant‟s agent shows the tenant vacated the property
at the end of the lease on 19 February 2016. In view of the option clause in the lease,
Case No: 431608 Determination Page 7 of 8
I am not satisfied there was a reasonable expectation of the tenants extending the
lease or the applicant intended to offer a renewal of the lease to the tenants at the
end of the lease on 19 February 2016.
In addition, I have reviewed the photographs taken of the premises by the FSP‟s
builder and engineer. Although I accept it may have been difficult to find a new tenant
with the props supporting the awnings in place, having considered the photographs,
the material provided is insufficiently compelling to establish the props negatively
impacted the business of the tenant causing the tenant to vacate the property.
On the material provided, and for the reasons stated, I am not satisfied the FSP is
obliged to pay the applicant for the claim for loss of rent or costs associated in finding
a new tenant.
Case No: 431608 Determination Page 8 of 8
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is a company and represented by a company director. Reference to
the applicant in this determination includes both the company and company director.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP‟s Notice s of Response dated
29 March, 7 June and 12 August 2016. Both the policy document and the Notices
have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties‟ submissions, emails and photographs .
Correspondence between the parties.
Business Insurance Schedule and policy.
FSP‟s policy and claims screens .
Report from the FSP‟s builder .
Report and email from the FSP‟s engineer.
Invoices and quotes (various) from the applicant.
Commercial lease dated 26 February 2016.