Storm claim for awning and façade denied under wear-and-tear and corrosion exclusions; cash settlement offered
Text of the determination
Determination
Case No: 431561 Determination Page 1 of 5
Case number: 431561 24 October 2016
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under her Business Insurance Policy,
held with the financial service provider (FSP), following damage to the insured
property in a storm.
The FSP has partially accepted the applicant’s claim but has denied the claim
relating to the awning and the balance of the façade of the building on the basis of
exclusions detailed within the policy.
1.2 Issues and key findings
Is the FSP entitled to deny the applicant’s claim for the awning and the balance
of the façade on the basis of exclusions within the policy?
The FSP is entitled to deny the applicant’s claim in regard to the awning and the
balance of the façade of the building on the basis of exclusions within the policy.
Has the FSP met its obligations in respect to the façade under the terms and
conditions of the policy?
The FSP has met its obligations in respect to the façade under the terms and
conditions of the policy.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny the applicant ’s claim for the awning and the balance of
the façade.
The cash settlement offer of $15,262.50 finalises the FSP’s obligations under the
policy in respect to the façade.
The FSP is required to reimburse the applicant the cost of obtaining the expert
report, upon provision by the applicant of an invoice for payment.
The FSP is not required to make any further payments to the applicant.
Case No: 431561 Determination Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
This dispute has been the subject of a recommendation issued by the Service on
30 June 2016.
It was the case manager’s recommendation that the FSP was entitled to deny the
applicant’s claim in relation to the awning and the balance of the façade on the basis
of exclusions within the policy. It was the case manager’s further recommendation
that the cash settlement amount of $15,262.50 was sufficient to meet the FSP’s
obligations in respect to the façade.
The applicant has disputed the recommendation.
A copy of the recommendation is attached to this determination.
2.1 Is the FSP entitled to deny the applicant’s claim in regard to the
awning and the balance of the façade of the building on the basis of
exclusions within the policy?
Coverage of the policy
Th e coverage provided by the applicant’s Business Insurance Policy is detailed
within the Product Disclosure Statement (PDS).
The coverage provided by the policy is for accidental damage suffered to the
building, subject to exclusions which are detailed within the PDS.
The PDS details:
‘ Exclusions
1. …
2. We will not cover You for loss or damage caused by:
(a) wear and tear, gradual deterioration, scratching, marring, developing flaws,
normal upkeep or any gradual cause;
(b) …
(c) corrosion, rust, oxidation, any form of fungus , wet or dry rot, dampness of
atmosphere, variation in temperature, evaporation, disease, shrinkage;
(d) …
(e) Inherent vice or latent defect;
(f) …’
Case No: 431561 Determination Page 3 of 5
It is accepted insurance law that the applicant carries the initial onus to establish that
she has suffered loss and damage which is covered by the terms and conditions of
the policy.
The FSP’s onus to show the basis on which it otherwise seeks to deny the claim,
including the exclusions detailed above, only arises once the applicant has
established that the loss and damage claimed is covered by the terms and conditions
of the policy.
Circumstances of the loss
The applicant says that the insured building suffered loss and damage as a result of
Cyclone Marcia in February 2015.
As stated, the FSP has partially accepted the applicant’s claim. On this basis, I am
satisfied that the applicant has met her onus to establish that she has suffered loss
and damage which is covered by the terms and conditions of the policy.
The onus now transfers to the FSP to show the basis on which it otherwise seeks to
deny the balance of the applicant’s claim.
In this regard, the FSP relies upon the policy exclusions referred to above.
In support of their respective positions, a number of reports have been obtained from
various experts in regard to the cause and the extent of the loss of the insured
building.
I have had the opportunity to carefully consider those reports and the helpful
photographs which have been provided.
It is a fundamental rule of insurance law that subject to the terms of a policy, an
insurer is only liable for losses that are proximately insured against.
Thus, a necessary part of all claims and disputes is the establishment of the
proximate cause of the loss.
It has long been accepted that the proximate cause of the loss is the dominant or
effective or operative cause of the loss, whether or not that cause be the last in time
or the sole cause.
It is further accepted insurance law that if one cause would have led to the loss in
any case and the other would not have done so in the absence of the first, then the
first cause is the proximate cause of the loss.
Put simply, the applicant says that Cyclone Marcia was the proximate cause of the
loss and damage to the awning and the balance of the facade, whereas the FSP
says that wear and tear, gradual deterioration, corrosion, rust and latent defect were
the proximate causes of the loss and damage to the awning and the balance of the
facade.
Having reviewed the exchanged material, I am satisfied that there were significant
maintenance, corrosion, rust, gradual deterioration and latent defect issues at the
property.
Case No: 431561 Determination Page 4 of 5
I am also satisfied that the façade presented in poor condition and that the awning
failure was due to a lack of maintenance and as a result of the significant corrosion
and decline over a period of time.
The attached recommendation includes what I regard as an excellent summary of
some of the exchanged material and I do not propose to repeat that material here,
save that I am satisfied that the FSP has met the onus to establish the application of
the exclusions for wear and tear, gradual deterioration, corrosion, rust and latent
defect.
The exchanged material also has reference to the impact of Cyclone Marcia upon the
damage at the property.
In this regard I note that the engineer engaged by the FSP (S) concluded that
Cyclone Marcia was unlikely a major cause of the damage to the façade and the
canopy.
This was in part based upon the observation that the building next door (part of the
same overall building), which S regarded as well maintained, appeared to have
suffered no damage in comparison to the insured building.
S also concluded that the predominant driver of the damage at the property was the
lack of maintenance.
In respect of the contribution of Cyclone Marcia, the engineer (C) engaged by the
applicant, concluded that a combination of rusted bolts with reduced diameter and
thus reduced capacity, with higher wind loads induced by cyclonic conditions have
been the likely contributing factors to the failed connections, cracked cladding and
sagging awning.
Whilst the applicant has presented a brief statement from a plumbing company to the
effect that the plumber had not recognised any structural issues with the front awning
prior to the Cyclone in February 2015, I am satisfied that the weight of the material
exchanged confirms the lack of maintenance issues apparent in respect of the
insured building.
Further, I am also satisfied that the exchanged material confirms that the building and
immediate area was not in the direct path of Cyclone Marcia and the town was
outside the Category 1 cyclone wind speed area.
Having regard to all of these matters, I am satisfied that the dominant or effective or
operative cause of the loss was the lack of maintenance at the property and this was
the proximate cause of the loss.
The policy provisions (above), specifically exclude loss and damage caused by wear
and tear, gradual deterioration, corrosion, rust and latent defect and as a result of my
finding in respect to the proximate cause, the FSP is entitled to deny t he applicant’s
claim in respect to the awning and the balance of the façade.
On the other hand, I am satisfied that the report provided by the applicant’s engineer
(C) has assisted in the understanding and resolution of this dispute and thus the FSP
should meet the reasonable cost of that report.
Case No: 431561 Determination Page 5 of 5
The applicant is to provide the FSP with an invoice in respect to the cost of the
report.
2.2 Has the FSP met its obligations under the policy, in respect to the
façade of the building?
As stated, the recommendation (attached) detailed that the FSP accepted coverage
for the damaged sections of the asbestos sheeting, which it said was caused by the
Cyclone, but declined to cover for the façade in total. The FSP offered to cash settle
the applicant for the storm related damage. As detailed, the amount offered was
$15,262.50.
The applicant seeks replacement of the entire façade as she says that the works
covered by the FSP’s offer cannot be properly completed and guarantee d to comply
with all current building codes and other statutory requirements.
The applicant maintains that in order to comply with all current building codes and
statutory safety requirements in respect to the removal of asbestos, the entire façade
would need replacement.
The applicant also says that it is a longstanding principle of the Financial
Ombudsman Service that if a damaged section of property cannot be repaired
independently to the rest of that section, then the entire section is considered
damaged.
However, the builder who conducted the original assessment of the property has
provided a quotation confirming that the damaged asbestos would be removed in
accordance with the relevant code of practice.
The applicant has not provided expert evidence to establish that the proposal from
the original builder was not adequate to either comply with the relevant guidelines,
codes or statutory requirements or would not be adequate to replace the damaged
section of the façade.
Given the exchanged material, I am satisfied that the offer made by the FSP is
adequate to meet its obligations under the terms and conditions of the policy.
Upon acceptance by the applicant of this determination, the FSP is to pay the
amount of $15,262.50 to the applicant to meet its obligations under the terms and
conditions of the policy.
Recommendation
Case No: 431561 Recommendation Page 1 of 9
Case number: 431561 30 June 2016
3 Overview
3.1 Dispute
The applicant holds a business insurance policy with the financial services provider
(FSP) and she lodged a claim for damage following Cyclone Marcia.
The FSP partially accepted the claim and offered a cash settlement of $15,000.
The FSP declined cover for damage to the awning and façade of the building
because it believed wear and tear, gradual deterioration, corrosion, rust, and latent
defect caused the damage. These causes are excluded from cover.
3.2 Issue and key findings
Is the FSP liable to repair the awning and façade?
The FSP is not liable for the damage because:
the two proximate causes of the damage are the storm as well as wear and
tear, gradual deterioration, corrosion and rust, which operated in tandem to
cause the damage
damage due to wear and tear, gradual deterioration, corrosion and rust is
excluded under the policy
the Wayne Tank principle applies to allow the FSP to deny the claim
the settlement for the damage to the property caused by the storm is fair in the
circumstances.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is to settle the applicant’s claim in accordance with the terms and conditions
of the policy for the sum of $15,262.50 being the total cost to repair the property.
Case No: 431561 Recommendation Page 2 of 9
4 Reasons for recommendation
4.1 Is the FSP liable to repair the awning and façade?
Applicant has the burden of establishing an insured event
It is accepted insurance law the applicant carries the initial onus to establish the loss
and damage claimed is covered by the terms and conditions of the policy. This is
commonly referred to as a prima facie claim.
The applicant’s policy provides cover for damage caused by sudden, unexpected and
unforeseen circumstances. Although a sudden and unexpected event may have
occurred, the applicant must also establish the event caused this damage.
The applicant claims Cyclone Marcia damaged the property on 20 February 2015.
There is no dispute a storm caused damage to the property. The FSP partially
accepted the claim and offered a cash settlement for some of the damage.
The FSP denied cover for damage to the awning and façade, because it believes the
damage was caused by wear and tear, gradual deterioration, corrosion, rust and
latent defect.
However, the reports by the FSP’s builder, RPF, and the FSP’s engineer, S, confirm
there was evidence of storm related damage to the façade and awning. On balance, I
am satisfied the applicant has established a prima facie claim.
Awning in poor condition at the time of the storm
The applicant made a claim for a deflected awning. The FSP declined coverage for
the awning on the basis of wear and tear, gradual deterioration, corrosion, rust and
latent defect.
The FSP provided a report and photographs by RPF detailing the maintenance
issues at the property. These show:
potential maintenance related damage near the fixing points of the awning
bracing
attending trades would have noticed the maintenance issues required prior to
the cyclone
it is highly unlikely this deflection was event related, rather the result of wear
and tear.
The FSP’s expert, S, detailed the maintenance issues, which show:
structural safety concerns including a failure and loosening of tie rods
a lack of maintenance
deterioration of timber cover sheets
a lack of external overflows and the absence of gutter guards to the box gutter.
The applicant said the property was well maintained prior to the cyclone. The
applicant provided photographs of the façade before the cyclone, which she believes
Case No: 431561 Recommendation Page 3 of 9
shows the façade and canopy were in very good condition with no deflection or
deterioration.
The applicant also said she undertook regular maintenance on the property. The
applicant’s plumber, G&J, said he was responsible for the maintenance to the roof
and did not recognise any structural issues with the front awning prior to the cyclone
in February 2015.
The applicant said this evidence is more compelling than the comments made by an
engineer attending the property eight months after the date of loss, when the
damaged awning and tie-downs had been exposed to the elements for several
months.
The applicant said the FSP’s builder, RPF, who attended soon after the cyclone, did
not notice any maintenance related issues in their first inspection. The applicant said
this is compelling evidence there were no maintenance issues at the property prior to
the storm.
The FSP said the first RPF report was in relation to the asbestos sheeting only,
which is why it did not comment on any pre-existing damage. RPF said in a follow up
report that further maintenance issues were detected upon closer inspection and it
was unlikely these structural items would have been detected at the initial estimator’s
inspection, particularly the internal deflection.
Although I accept the first RPF report did not comment on maintenance issues, I am
persuaded by the subsequent RPF reports, along with the reports by the FSP’s
engineer S and the applicant’s engineer C, which confirm there were m aintenance
issues at the property prior to the cyclone.
RPF statements will be considered
The applicant said RPF made a prejudicial statement that a local authority
representative commented on repairs needed to the property. The applicant said
FOS should consider RPF’s statement as being false, and should therefore strike out
all evidence provided by RPF. The applicant also believes the impartiality of the S
should be questioned, because it was instructed by RPF.
I have given consideration to the applica nt’s request, however I am not satisfied all
evidence provided by RPF and S should be excluded. As RPF did not provide
evidence to support the claim that a local authority representative commented on
repairs needed at the property, I have not considered this piece of evidence to
determine whether the FSP has established an exclusion applies to the claim.
However, I am not prepared to strike out all submissions made by RPF and S in
relation to findings they came to regarding the cause of the damage following their
own inspection of the property.
Awning damage due to corrosion, wear and tear and gradual deterioration
C said a combination of rusted bolts with reduced diameter, and thus reduced
capacity, with higher wind loads induced by cyclonic conditions, have been the likely
contributing factors to the failed connections, cracked cladding and sagging awning.
Case No: 431561 Recommendation Page 4 of 9
S said the considerable deflection of the front fascia was due to tie rod failures. C
considered the sagging of the awning resulted from the failure o f the tie rod
connection to the façade parapet at a number of locations. C also said the bolts
appeared to have undergone significant corrosion, and the diameter had reduced in
size.
RPF considered it unlikely the cyclone caused the sagging of the awning, but rather it
was the result of long and sustained wear and tear.
In relation to the report by S, the applicant said the inspection took place eight
months after the date of loss and it would be impossible for anyone to confirm
beyond reasonable doubt whether damage existed prior to the cyclone.
At FOS, we must weigh up the available expert evidence and determine on the
balance of probabilities whether there was pre-existing damage.
Based on the report by C, I do not believe the rust on the bolts would ha ve occurred
solely due to the cyclone and eight months of exposure to the weather. I am
persuaded by the FSP’s argument that the reduced diameter of the bolts indicates,
on the balance of probabilities, the rust and corrosion had been ongoing for a
significant period of time prior to the storm event.
Cyclone a proximate cause of damage
The applicant contends the damage to the awning was due to the cyclone. The report
by C states the cyclone contributed to the damage. However, the FSP said the
analysis of the weather conditions shows the cyclone could not have caused the
damage.
S believed it unlikely the cyclone wind loads were a major cause of damage to the
façade and awning. S said the wind speeds of the cyclone when it hit the applicant’s
suburb were fairly low. The report said the suburb was outside the category one
cyclone wind speed area.
The FSP argues there was no evidence of damage to the awning or fascia from
impact, and the claimed event caused only some of the damage to the fascia.
The applicant does not agree with the FSP’s argument that flying debris could not
have caused the damage and is inconsistent with the damage to the asbestos
panels, caused by flying debris and accepted by the FSP. The applicant said the
arguments are incongruent.
The applicant said S did not get onto the awning, so all photos and observations
were made several metres away, and he was therefore unable to view the affected
areas close-up. The applicant said this would affect the level of certainty in
ascertaining the cause of loss and existence of previous damage.
The applicant believes the engineer pre -judged the situation and formed an opinion,
without proper justification, that the damage was pre-existing. The applicant said the
awning has been structurally sound for the 25 years she has owned the property.
Case No: 431561 Recommendation Page 5 of 9
The applicant believes the engineer was not able to conclude on the proximate cause
of the damage because he could not view or inspect a number of critical areas of the
awning, so he had insufficient evidence to make such conclusions.
I considered the description provided by the engineer that the canopy was high risk,
so the photos and inspection took place from the access ladder at various positions
along the canopy edge. I am satisfied, based on the descriptions of damage and
photographs provided, the engineer was able to make adequate findings on the
condition of the canopy from various points along the edge.
I also considered the submissions made by the FSP regarding the extent of any
cyclone damage. However, on balance, I am satisfied one proximate cause of the
damage was the cyclone. This is based on the report by C, as well as reports on the
extent of cyclone damage to the rest of the building.
Two proximate causes of damage
On balance, I am also satisfied anothe r proximate cause of the damage to the
awning was corrosion of the bolts, which led to the failure of the tie-rods. The extent
of corrosion on the bolts indicates the damage was also due to wear and tear and
gradual deterioration.
Based on the maintenance related issues identified above, I am not satisfied the
awning would have deflected solely due to the cyclonic winds.
I am persuaded by the findings of C, which shows two proximate causes for the
damage. In these circumstances, the FSP is not liable for the damage to the awning,
in accordance with the Wayne Tank principle .
This is an established principle of insurance law, which provides that, where two or
more proximate causes operating independently and concurrently causes the loss,
and at least one cause is excluded while the others are not, the exclusion clause
operates to allow the insurer to deny the claim in its entirety.
In the present case, I am satisfied the storm and the poor pre-existing condition of
the awning (due to wear and tear, gradual deterioration, corrosion and rust) operated
in tandem to cause the damage.
As outlined above, the factors, which led to the poor condition of the awning and
façade, are excluded under the policy. Accordingly, the Wayne Tank principle
operates to entitle the FSP to deny liability for any damage to the awning not related
to the storm.
FSP not obliged to replace entire façade
The FSP accepted coverage for the damaged sections of the asbestos sheeting,
which it said was caused by the cyclone, but declined cover for the façade and
awning structures in total. The FSP offered to cash settle the applicant for the storm
related damage.
The applicant seeks replacement of the entire façade. The reports indicate the
façade has cracks in the external cladding panels, worn, missing or broken external
cladding joiners, and cracks in the façade framing columns.
Case No: 431561 Recommendation Page 6 of 9
C noted horizontal cracking to the external cladding panels at the upper connection
points most likely occurring when the tie rod connection failed. C said a combination
of the rusted bolts and the higher wind loads were both contributing factors to the
failed connections and cracked cladding.
S reported a systematic lack of appropriate maintenance to the fascia, canopy and
FC sheets. S said there were previous repairs to the FC sheets, using ineffective
methods, such as gluing cracked sheets.
The applicant said the QLD Government’s Asbestos Guide confirms the correct
procedure for dealing with cracking asbestos sheets is to seal with glue and/or paint.
The applicant believes this proves the façade was properly maintained.
The applicant said the only evidence to show pre-existing damage to the asbestos
sheets were the cracks, which had been sealed. The applicant submits they were
sealed in accordance with government guidelines and the insured event caused any
further cracks.
I accept the applicant may have maintained the damage to the asbestos sheeting in
accordance with regulations.
However, I am also persuaded by the other findings made by S regarding the
maintenance issues relating to the façade. S observed largely deteriorated cover
sheets, which did not serve their function effectively.
S reported the inconsistent tie-back methods for the canopy tie-rods contributed to
the excessive deflection of the canopy, and any significant wind gusts would result in
fascia movement and cracking of the FC sheets.
S believed it unlikely the cyclone was the major cause of damage, as the
neighbouring building was well maintained and had not suffered any damage.
I have reviewed all reports by the experts and based my findings on those reports.
Although I consider there may have been continuing damage to the property from the
initial claim to the reports provided by S and C, I am satisfied there is compelling
evidence that the awning and façade required maintenance and there was corrosion
of the bolts affixing the awning to the façade.
Therefore, the FSP has established, on the balance of probabilities, the sections of
the façade not accepted were damaged due to wear and tear, gradual deterioration,
corrosion and rust.
Cash settlement offer reasonable
The FSP offered the applicant a cash settlement of $15,262.50, less GST and
excess, based on the RPF scope of works.
Under the terms of the policy, the FSP may settle a claim for damage to the
applicant’s property by arranging for its contractors to repair the damage or by paying
the applicant the cost (to the FSP) of doing so.
It is clear from the terms of the policy the FSP has the discretion to decide which
settlement method to adopt.
Case No: 431561 Recommendation Page 7 of 9
In these circumstances, I consider the FSP acted reasonably in electing to cash
settle the applicant for the estimated cost of carrying out the repairs.
The applicant believes the damaged sheets cannot be replaced without replacing the
entire façade. She says all asbestos sheets require replacing in accordance with the
QLD Government Asbestos Guide for safely handling asbestos. The applicant
argued that if a damaged section of property cannot be repaired independently to the
rest of that section, the entire section is considered damaged.
RPF said the quotation for the removal of the damaged asbestos sheeting was made
taking into account all relevant standards and guidelines. There is no evidence to
show RPF is not qualified to provide an adequate estimate for the safe removal of
asbestos. I am satisfied, on balance, the quoted works are reasonable.
I am not persuaded the presence of asbestos requires the entire façade to be
replaced. Although the regulations provided show great care must be taken when
removing asbestos, there is no evidence to indicate the quote by RPF does not
comply with all regulations.
In the absence of any report or quote to contradict the quotation provided by RFP, I
must accept the RPF quote as being fair and reasonable.
Case No: 431561 Recommendation Page 8 of 9
5 Supporting information
5.1 Expert reports
Record Key points
FSP’s expert (RPF )
Report
20.05. 15
Caus e of damage to front façade due to impact damage from
Cyclone Marcia.
No maintenance issues/ prior damage found.
Damaged sections of façade sheeting need replacement.
Scope of works to repair $9, 286.75.
FSP’s expert (S )
Engineering r eport
16. 10 . 15
The façade presented in poor condition.
Considerable deflection of the canopy.
The façade does not meet service requirements from a structural
safety perspective.
Tie - rod connections have failed rendering canopy structure
unserviceable.
Evidence of s ystematic lack of appropriate maint enance to fascia,
canopy and FC sheets.
Timber cover sheets largely det eriorated and not functioning
effectively.
Inconsistent tie - back methods of canopy tie - rods contribut ed
directly to excessive deflection of the canopy .
It is unlikely the Cyclone Marcia wind loads were the major cause
of damage to the façade and canopy.
Predominant driver of the fascia and canopy failure is due to lack
of quality planned and urgent maintenance.
FSP’s expert (RPF )
Quotation
22.10 . 15
Revised scope of works for $15,262.50 to cover all result ant
damage from Cyclone Marcia.
Revised pricing submitted after engineers report confirmed no
further event related damage need be submitted.
FSP’s expert (RPF )
Email r eport
23.03. 16
Confirmed the quote allows for removal of only the damaged
asbestos sheeting, but this conforms with all relevant standards
and guidelines.
Details fascia maintenance concerns and structural serviceability
issues.
All building components and materials observed well pas t any
normal life expectancy.
Wind gusts through Biloela at time of damage were low. The wind
speeds would cause minimal up lift or impact damage.
FSP’s expert (S )
Email r eport
28.03. 16
Analysis of wind speeds for Biloela at time of incident was 60km/h.
Applicant’s expert (VB )
Quotation
Removal and replacement of awning $23, 980.
Case No: 431561 Recommendation Page 9 of 9
28.10. 15
Applicant’s expert (C )
Report
November 15
The awning had deflected at a number of tie rods.
Tie rod connections to the façade parapet have failed for some tie
down rods.
The bolts appear to have undergone significant corrosion and the
diameter has reduced in size.
Cracks observed in multiple external cladding panels could be
allowing water ingre ss.
Sagging of awning result ed from failure of the tie rod connection to
the façade parapet at a number of locations.
Cracking to the external cladding panels most likely occurred when
the tie rod connection failed.
A combination of rusted bolts with redu ced diamet er and thus
reduced capacity, with higher wind loads induc ed by cyclonic
conditions have been the likely contributing factors to the failed
connections, cracked cladding and sagging awning.
Applicant’s expert (G&J )
Email
Undated
No evidence of structural issues with front awning prior to cyclone
Marcia event in February 2015.
Applicant’s expert (BoM )
20.11. 15
Report
Description of tropical cyclone Marcia.
Cyclone Marcia impacted the town of Biloela on 20 February 2015.
5.2 Key information
Policy wording.
Claim notes.
QLD Government asbestos removal guidelines.
Correspondence between parties.
Parties’ submissions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.