The applicants made a home insurance claim for water damage from a leaking fridge hose, which the FSP denied because it said the damage predated the policy. AFCA found the damage occurred during the policy and ordered the FSP to meet the claim, with interest on any cash settlement.

The insured carries the onus of showing the loss occurred during the policy, and the panel found the sudden escape of water was covered and most likely occurred shortly before discovery on 10 February 2016.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 431343 Determination Page 1 of 8 Case number: 431343 22 February 2017 1 Overview 1.1 Dispute This matter involves a claim by the applicants under their Home and Contents Insurance Policy, held with the financial service provider (FSP), following damage to the home. The FSP has denied the applicants’ claim on the basis that the claimed event occurred before the policy was in force and thus the policy does not respond to the claim. 1.2 Issues and key findings Have the applicants established the claimed event occurred during the currency of the policy? The applicants have established that the claimed event occurred during the currency of the policy and thus the FSP is to meet the applicants’ claim under the terms and conditions of the policy. 1.3 Determination This determination is in favour of the applicants. The FSP is required to meet the applicants’ claim under the terms and conditions of the policy and in accordance with this determination. Should the FSP cash settle any aspect of the applicants’ claim, the FSP is to pay interest, in accordance with the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim, to the date the cash settlement payment is made. Case No: 431343 Determination Page 2 of 8 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. 2.1 Have the applicants established the claim is covered by the terms and conditions of the policy? Coverage of the policy The applicants’ Home and Contents Insurance Policy provides coverage in the event of Insured Events which are detailed within the policy. This means that not all loss and damage is automatically covered but rather only loss and damage caused by an Insured Event which is detailed within the policy. The insured event plus the loss and damage must occur during the currency of the policy. The coverage provided by the policy is detailed within the Product Disclosure Statement (PDS). The PDS details: Cover Part 1 – Insured Events This section describes the insured events you are covered for, and the conditions and exclusions that specifically apply to eac h insured event. They should be read with the general exclusions on pages 29-32 … It is accepted insurance law that the insured carries the initial onus to establish that they have suffered loss and damage which is covered by the terms and conditions of Case No: 431343 Determination Page 3 of 8 the policy. This includes showing that the insured event plus the loss and damage occurred during the currency of the policy. Circumstances of the policy and the claim The exchanged material confirms that the policy was incepted over the telephone by the applicants on 29 January 2016. When lodging the claim with the Service the female applicant says that when she noticed the carpet at the home was wet, she called a plumber who found a leak from a pipe at the back of the fridge which he repaired straight away. The exchanged material confirms that the plumber (DP) attended at the home at the applicants’ request on 10 February 2016. Within a subsequent submission to the Service the female applicant says that “… we noticed cupping of the floor boards in front of the fridge the week prior to the 10 th February. This was the first sign of the leak…” The exchanged material includes a number of reports from a variety of different experts. The panel is satisfied that the exchanged material does not enable a precise statement as to the time and date the leak and the damage commenced. However, the panel notes that the policy provides coverage in the event of a sudden and unexpected escape of liquid at the insured address from a pipe. Noting that the leak from a pipe at the back of the fridge was not discovered until 10 February 2016 and there was little warning prior to that, the panel is satisfied that the applicants have established loss from an event covered by the terms of the policy. As stated, the exchanged material includes a number of reports from a variety of different experts. The plumber DP In an undated report DP says that he attended at the applicants’ home on 10 February 2016 and on arrival the female applicant showed him the carpet in the lounge room which was wet. DP described the carpet as very wet the whole length of the wall between the cabinets and that the wet area was starting to extend out into the room in sections. Due to the size of the fridge and the damage to the floorboards beneath, the fridge took a long time to move. DP explained that the hose from the isolation tap to the fridge connection had a split in it and the water was spraying out, approximately one foot in the air. The boards beneath the fridge were wet and warped. Due to the warped/cupped floorboards there were small gaps between the wood that the water was draini ng through. The water then flowed through the sub floor under the hardwood floorboards to the lounge room. DP said that this was why the carpet was wet but there was no visible damage to the pantry. Case No: 431343 Determination Page 4 of 8 DP noticed that there was slight cupping to the floorboards in the kitchen, pantry, dining areas and into the hallway which made DP suspect that the water had travelled further. Within a bucket, DP collected approximately one inch of water over a 45 minute period. DP said he was unable to say when the leak began but he could say that there was no damp smell in the house that he would have expected had the carpet and other building materials been wet for a prolonged period. DP was not present when any floorboards were removed so he could not say how easy it would have been for water to spread under the floor or what direction it was likely to go in. In conclusion to that report DP said that it was his opinion based on what he saw and more on what he couldn’t smell that this was a recent event and that it would be unreasonable for anyone to think that the owners could have known this was going on as the damage was all concealed beneath the floor or behind the fridge. The FSP has provided the recording of a telephone conversation one of its representatives had with DP on 24 February 2016. The panel has listened to the recording of that telephone conversation. Within the conversation DP says that underneath the fridge was quite saturated, the boards and the carpet and DP assumed it had been happening for quite some time. His personal opinion was that it was at least a couple of months and it could be anything from two months onwards but he was only guessing. DP said that it was definitely more than a couple of weeks he would assume. Indoor Environmental Professional At the request of the applicants NLR attended on site and took air and surface samples which they sent for analysis. The inspection of the home by NLR was conducted on 8 March 2016 and the air and surface samples taken on that date. The analysis provided by a laboratory confirmed the levels of airborne mould and surface mould detected in the samples collected from within the premises was rated as very high on microscopy. NLR confirmed that drying equipment was placed in the premises between 12 February 2016 and 15 February 2016. It was noted that a builder had cut and removed some floorboards on 3 March 2016. As such NLR recorded the flooring details as solid timber glued onto plywood, laid on top of a concrete slab with a plastic vapour barrier sheet placed between the ply and concrete slab. At inspection it was noted that water damage spread to approximately a four metre radius from the source. There was visual cupping and peaking of remaining Case No: 431343 Determination Page 5 of 8 floorboards in place, noticeable in the kitchen, dining, living area and in the hallway along the stairwell. NLR was of the view that the cause of the damaged floorboards was water from the split filter hose tubing, entering under the floorboards. Water travelled through the gaps between the plywood panels and spread through the area in a 24 to 72 hour period from the hose splitting. Further, the V grooves machined into the underside of the hardwood boards, assisted the water travel and vapour to spread and radiate out. NLR concluded that this caused the boards to tent, peak and cup immediately from swelling pressure of trapped moisture. NLR reported that there was a strong mould odour and visual mould growth to the underside of the plywood. On the other hand there was no visual mould on the pine skirting board close to the incident point which NLR said generally appears within three to four days of being exposed to persistent moist conditions. There was an absence of mould genera that grows on high water activity within seven to twelve days, from the surface sample tested on timber boards located directly to the back of the fridge and the pantry side. Also this was not picked up in the air sample taken. There is no sign of wet rot to timber stud base at the back of the fridge. Wet rot being associated with timber being wet for a prolonged period of time. Leak detection test A water pressure test was conducted on or about 15 March 2016 which showed no mains water leak. Termite check The applicants provided the report of a termite check conducted on 28 October 2015. The report indicated that the only location in the home with high moisture levels was in the ensuite in the front of the shower. Apparently a seal needed to be replaced. There was no indication of moisture in the kitchen area. Flooring association The applicants engaged ATFA to inspect the premises and provide a report. ATFA noted they had been advised during removal of the flooring, pre-existing water damage was discovered on the plywood sub floor under the fridge and the FSP concluded that the damage was from an earlier leak. At inspection on 11 March 2016, ATFA noticed that the flooring through the entry was cupping and upon entry into the home it had a dank wet smell to it and was noticeably humid. Case No: 431343 Determination Page 6 of 8 It was also clear to ATFA from the measurements and testing that the flooring had been severely exposed to more recent water and the swelling of both the plywood sub floor and the floorboards indicate a very large amount of water ingress around the position of the refrigerator, which is consistent with the reports from the owner and the observations of the construction services who attended in early March 2016. AFTA considered that while there may have been a previous leak, based on the owner’s observations, current testing and a current appearance of the floor, the condition of the floor is consistent with a severe and more recent major water event. It was considered there may have been a small leak that existed sometime prior to the more recent event causing slight water damage over time to the plywood sheeting under the fridge. However, ATFA considered that more recently this leak or perhaps a different leak from the same appliance has developed and resulted in significant water damage to the floor. ATFA concluded with the commentary that prior to the water damage it was indicated that the flooring was already showing signs of pressure, such as slight picking throughout and that this was most likely due to the flooring expanding after installation. ATFA noted that while under some pressure, however, the flooring was reported to have remained stable for five years prior to the recent reported event and it is expected that there was a small amount of water damage caused by a small leak at the refrigerator over some time prior to more significant recent water affecting the floor. Finally, ATFA concluded that it is expected that the amount of damage caused and the speed in which it became noticeable, was more than what could have been caused by a slow leak overtime. FSP engineers The FSP engaged engineers (C) who conducted an inspection of the property on 1 March 2016. C inspected the base of the floorboard and the top of the plywood and did not observe any evidence of long term moisture exposure such as decay. However, C reviewed July 2012 rental photographs from a property website of the insureds’ residence and noted that the timber floorboards adjacent to the bi folding doors were distorted. As confirmed by the report from DP, C was of the view that the water supply line behind the fridge was leaking water onto the flooring within the fridge area and it was C’s opinion that the water seeped through the gaps in the floorboards into the plywood sub strata, but contained by the vapour barrier between the plywood and the slab. Case No: 431343 Determination Page 7 of 8 The water then saturated the plywood in the vicinity of the fridge (lounge room, hallway, pantry, kitchen and dining room), C was of the view that the saturated plywood transferred moisture to the floorboards for a period of at least two weeks. It was C’s opinion that some deformation of the flooring existed prior to the claimed February 2016 escape of liquid event and it was C’s opinion that the cupping to the pool room and bar was not the result of the escape of liquid event due to the distance between the leak and the pool room and bar. Property services report At the request of the FSP, OPS attended at the property on 4 March 2016. Following inspection, OPS was of the view that the degree of damage and saturation in the timber boards is consistent with damage from long term moisture exposure. Water damage was evident towards the centre of the room where water appeared to have tracked via channels between the sub floor timbers. The damage sighted was consistent with what would be expected due to prolonged exposure to moisture such as a slow leak over a period of months. Construction services Construction services company RCS attended at the premises on 8 March 2016 at the request of the FSP. It appears that RCS originally attended on 3 February 2016 to cut and remove some of the floorboards. RCS advised that once they started to lift the peaked/damaged timber floor, it was obvious that moisture and dampness had travelled further than was evident at their initial inspection. RCS found that water had spread from the fridge space into the area of the dining room, however, they were unable to determine whether all of the existing damage had been caused by the leaking fridge. When the damaged section of floor was removed RCS exposed a large amount of mould and decay on the ply underlay in the fridge area, as well as a section in the dining room area. The presence of mould and the poor condition of the ply underlay suggests the moisture has been present for an extended period of time. RCS noted that the concrete slab below the black plastic membrane was also very damp in these areas. Finally RCS was unable to give an accurate time as to when damage to the floor could have started, but in RCS’s opinion it appears as though the moisture has been present for many weeks, possibly months. Case No: 431343 Determination Page 8 of 8 Discussion The panel is satisfied that it is clear from the exchanged material that it is not possible to establish the precise date or the precise time of which the damage has occurred at the applicants’ home. The exchanged material does confirm that the date on which the applicants called the plumber (DP) and notified the FSP was 10 February 2016. Noting that DP has advised that the carpet in the lounge room area was very wet the whole length of the wall between the cabinets and the wet area was starting to extend out into the room, the panel accepts that 10 February 2016 was the date on which the applicants’ became aware of the leak. Given that the applicants have two young children and their toys were kept on the cabinets in the lounge room in the area of the carpet, the panel accepts that the applicants would not have allowed their children to be exposed to the wet carpet once they became aware that there was a leak and the carpets were wet. Having reviewed the exchanged material the panel prefers the view that the damage as result of the pipe at the rear of the fridge likely occurred in the immediate period prior to its discovery on 10 February 2016. Whilst the opinions of the various experts in this regard vary, the panel accepts the observations from NLR in respect to the absence of visual mould at the time of their inspection and the conclusion that water spread through the area in the 24 to 72 hour period from the hose splitting. The panel also accepts the commentary from ATFA to the effect that the damage was unlikely to have been caused by a slow leak over time. The panel is not convinced that this conclusion is contradicted by the rental photographs which refer only to slight warping near the kitchen doors – an area which the inspections in general, support as being within the area of damage from the leaking hose. The panel is of the view that the seemingly premature removal of the mitigation devices – the heat mats and dryers – has contributed to the further spread of damage throughout the entirety of the ground floor. This view is consistent with the comment from RCS that when they lifted the floor, it was obvious that moisture and dampness had travelled further tha n was evident on initial inspection. It is also consistent with the flooring association’s comment that when comparing photographs taken 12 February 2016, to assessment soon afterwards, the floor had begun to show significant signs of water ingress. As a result, the panel is satisfied that the damage to the entire lower floor area, occurred during the period of policy coverage. The result is that the FSP is required to meet the applicants’ claim for the entire lower floor area under the terms and conditions of the policy.