Home / Financial Firm (Unknown - Insurer) / Determination 431164
Determination 431164
Claim declined for carport ceiling damage attributed to glue failure
Summary
The applicant's home insurer declined a claim for carport ceiling damage, attributing it to glue failure over time rather than an insured event. AFCA found the applicant had not established an insured event and ordered nothing.
The applicant bears the onus of establishing loss from a covered event, and the evidence supported gradual adhesive failure, which is not covered.
Issues
- Claim denial primary · not upheld“The available information does not establish the damage to the Applicant's carport ceiling was damaged due to an event for which the policy extends cover.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 431164 Determination Page 1 of 3
Case number: 431164 22 July 2016
1 Overview
1.1 Dispute
The Applicant held a Home Building and Contents Insurance Policy (the policy) with
the Financial Services Provider (FSP). The Applicant contacted the FSP on 11
December 2015 to lodge a claim for damage to her carport ceiling.
The FSP has declined the Applicant’s claim on the basis the damage is not due to an
insured event for which cover is provided under the policy. Rather, the damage is
due a failure of the glue (adhesive) failure over time, which is not covered under the
policy.
1.2 Issues and key findings
Is the Applicant entitled to cover for the cost to repair the carport ceiling?
The available information does not establish the damage t o the Applicant’s carport
ceiling (the ceiling) was damaged due to an event for which the policy extends cover.
Accordingly, the Applicant is not entitled to cover for the cost to repair the ceiling
under the claim.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is not obliged to cover the cost to repair the damaged carport ceiling under
the claim.
Case No: 431164 Determination Page 2 of 3
2 Reasons for Determination
2.1 Is the Applicant entitled to cover for the damaged ceiling ?
The ceiling was not damaged due to an event covered under the policy
I have considered all of the available information and am satisfied on the balance of
probabilities it establishes the following:
the Applicant held a current home building and contents insurance policy at the
time of the loss
the policy provides cover for loss or damage arising from the listed insured
events as provided in Product Disclosure Statement (PDS)
the FSP provided and the Applicant received the relevant policy documentation
including the PDS and Certificate of Insurance prior to the date of loss subject
of this claim
the Applicant contacted the FSP on 11 December 2015 to lodge claim for
damage to the ceiling
at lodgment of the claim the Applicant advised the FSP that over time the ceiling
had started to sag on the one side (closest to the fence) and had continued to
increase over the previous few months
the FSP appointed builders ‘G’ who attended the insured property to assess the
damage and completed make safe repairs
G noted some water damage to the ceiling over the garage roller door heads
consistent with swirling moisture over the winter months. Further, noted overall
the ceiling showed signs of glue failure and separation from the ceiling joists
the Applicant appointed three consultants however only one of these
consultants ‘S’ provided a written quote
S formed the view the damage consistent with water damage
the damage was not related to a previous claim where repairs were completed
by builders ‘U’ in 2014 (repairs were related to external eaves).
The Applicant has not established the damage is due to an insured event
I acknowledge the Applicant’s position that she was advised by all three consultants
she appointed that the damage was consistent with ‘water damage’. The available
information shows the FSP’s preferred builder al so acknowledges there was some
water damage evident over/in the area over the roller door heads. I also note of the
three consultants the Applicant appointed only S has provided a quote in which he
maintains it is clear the ceiling gave away due to water damage.
It is therefore not in dispute that there was evidence of some water damage however
in order to establish cover under the policy it must be established on balance the
damage was due to an insured event. S has not made available any supporting
evidence to establish his one-line statement advising the ceiling gave away due to
water damage. Having considered the available information, I find the report and
supporting photographic evidence form G to be the more compelling.
Case No: 431164 Determination Page 3 of 3
This is further supported by the information from the Applicant which establishes the
damage had been occurring over an extended period of time and continued getting
worse over the previous few months. This is consistent with the ceiling slowly giving
away due to glue failure and the ceiling separating from the ceiling joists.
The onus first rests with the Applicant to establish on the balance of probabilities that
the damage claimed was due to an event covered under the policy. The Applicant
acknowledges she could not associate a storm event with the damage and was of
the view the policy was there to cover damage of this nature.
Without compelling evidence to the contrary, I am not satisfied the Applicant has
fulfilled the onus to establish on balance the loss claimed is covered under the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.