Home / Financial Firm (Unknown - Insurer) / Determination 431164

Determination 431164

Claim declined for carport ceiling damage attributed to glue failure

FirmFinancial Firm (Unknown - Insurer)
Decided2016-07-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home insurer declined a claim for carport ceiling damage, attributing it to glue failure over time rather than an insured event. AFCA found the applicant had not established an insured event and ordered nothing.

The applicant bears the onus of establishing loss from a covered event, and the evidence supported gradual adhesive failure, which is not covered.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 431164 Determination Page 1 of 3 Case number: 431164 22 July 2016 1 Overview 1.1 Dispute The Applicant held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). The Applicant contacted the FSP on 11 December 2015 to lodge a claim for damage to her carport ceiling. The FSP has declined the Applicant’s claim on the basis the damage is not due to an insured event for which cover is provided under the policy. Rather, the damage is due a failure of the glue (adhesive) failure over time, which is not covered under the policy. 1.2 Issues and key findings Is the Applicant entitled to cover for the cost to repair the carport ceiling? The available information does not establish the damage t o the Applicant’s carport ceiling (the ceiling) was damaged due to an event for which the policy extends cover. Accordingly, the Applicant is not entitled to cover for the cost to repair the ceiling under the claim. 1.3 Determination This Determination is in favour of the FSP. The FSP is not obliged to cover the cost to repair the damaged carport ceiling under the claim. Case No: 431164 Determination Page 2 of 3 2 Reasons for Determination 2.1 Is the Applicant entitled to cover for the damaged ceiling ? The ceiling was not damaged due to an event covered under the policy I have considered all of the available information and am satisfied on the balance of probabilities it establishes the following:  the Applicant held a current home building and contents insurance policy at the time of the loss  the policy provides cover for loss or damage arising from the listed insured events as provided in Product Disclosure Statement (PDS)  the FSP provided and the Applicant received the relevant policy documentation including the PDS and Certificate of Insurance prior to the date of loss subject of this claim  the Applicant contacted the FSP on 11 December 2015 to lodge claim for damage to the ceiling  at lodgment of the claim the Applicant advised the FSP that over time the ceiling had started to sag on the one side (closest to the fence) and had continued to increase over the previous few months  the FSP appointed builders ‘G’ who attended the insured property to assess the damage and completed make safe repairs  G noted some water damage to the ceiling over the garage roller door heads consistent with swirling moisture over the winter months. Further, noted overall the ceiling showed signs of glue failure and separation from the ceiling joists  the Applicant appointed three consultants however only one of these consultants ‘S’ provided a written quote  S formed the view the damage consistent with water damage  the damage was not related to a previous claim where repairs were completed by builders ‘U’ in 2014 (repairs were related to external eaves). The Applicant has not established the damage is due to an insured event I acknowledge the Applicant’s position that she was advised by all three consultants she appointed that the damage was consistent with ‘water damage’. The available information shows the FSP’s preferred builder al so acknowledges there was some water damage evident over/in the area over the roller door heads. I also note of the three consultants the Applicant appointed only S has provided a quote in which he maintains it is clear the ceiling gave away due to water damage. It is therefore not in dispute that there was evidence of some water damage however in order to establish cover under the policy it must be established on balance the damage was due to an insured event. S has not made available any supporting evidence to establish his one-line statement advising the ceiling gave away due to water damage. Having considered the available information, I find the report and supporting photographic evidence form G to be the more compelling. Case No: 431164 Determination Page 3 of 3 This is further supported by the information from the Applicant which establishes the damage had been occurring over an extended period of time and continued getting worse over the previous few months. This is consistent with the ceiling slowly giving away due to glue failure and the ceiling separating from the ceiling joists. The onus first rests with the Applicant to establish on the balance of probabilities that the damage claimed was due to an event covered under the policy. The Applicant acknowledges she could not associate a storm event with the damage and was of the view the policy was there to cover damage of this nature. Without compelling evidence to the contrary, I am not satisfied the Applicant has fulfilled the onus to establish on balance the loss claimed is covered under the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.