Home / Financial Firm (Unknown - Insurer) / Determination 430588
Determination 430588
Cash settlement amount for home damage claim
Summary
The applicant's home was damaged by ground movement and leaking stormwater pipes. The FSP was entitled to cash settle but its offer of about $30,000 was not fair, and AFCA determined a $50,000 settlement.
The FSP may elect to cash settle under the policy, but the settlement must be fair and include all repair items and additional benefits such as temporary accommodation and debris removal.
Issues
- Claim amount dispute primary · upheld“I am not satisfied the FSP's offer to cash settle the applicant's claim is fair in all the circumstances”
Subjects and remedies
pay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 430588 Determination Page 1 of 9
Case number: 430588 20 January 2017
1 Overview
1.1 Dispute
The applicant lodged a claim in 2011 with the financial services provider (FSP) for
damage to his home, which he believed could be due to storm activity.
After initially denying liability, the FSP accepted the applicant’s claim on 2 October
2012 and agreed to carry out the necessary repairs subject to the applicant repairing
the stormwater pipes. Those repairs were completed by May 2014.
After allowing suitable period for the soil to dry out, the FSP obtained a scope of
works for the relevant repair work as well as quotations for those repairs.
A dispute has arisen as to the scope of works and estimated cost of repairs. Whilst
the FSP has offered to cash settle the applicant’s claim on the basis of the most
competitive quote obtained, the applicant would prefer the FSP to authorise the
repairs rather than cash settle the claim.
1.2 Issues and key findings
Is the FSP entitled to cash settle the claim?
The FSP may elect to repair, replace or compensate an insured the amount it would
cost to repair or replace. As the FSP could not guarantee the repairs due to unrelated
ongoing ground movement it has elected to cash settle the claim.
I accept that the FSP is entitled to cash settle the applicant’s claim .
Is the FSP’s offer of cash settlement fair in all the circumstan ces?
I am not satisfied the FSP’s offer to cash settle the applicant’s claim is fair in all the
circumstances. The offer does not cover all items to be repaired or the additional
benefits under the policy such as temporary accommodation and removal of debris.
Considering the various quotations and allowing for the additional benefits, I
determine a cash settlement of $50,000 fair in all the circumstances.
1.3 Determination
This determination is in favour of the applicant.
The FSP is to pay the applicant the sum of $50,000 in settlement of the applicant’s
claim for the damage sustained in accordance with the terms of the policy.
Case No: 430588 Determination Page 2 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Is the FSP entitled to offer to cash settle the applicant’s claim?
The FSP is entitled to cash settle the applicant’s claim
The policy clearly provides that the FSP can choose the method by which it settles
claims. The FSP can decide whether to repair the home, replace the damaged
portion of the home, or compensate the applicant for the amount it would have cost
the FSP for repair or replacement.
The discretion as to how to settle the claim must be exercised reasonably and
consistent with the principles of utmost good faith. The FSP’s policy provides a
lifetime guarantee on repairs which does not operate where a claim is cash settled.
Effectively, in cash settling a claim the FSP transfers the risk that may arise during
any repair process to an insured. Any offer to cash settle the claim should in my view
take into account the risk as well as additional benefits that may be available under a
policy such as temporary accommodation, architectural fee and removal of rubbish.
There are many reasons why an FSP may choose to cash settle a claim. In the
current dispute, the FSP has noted its repairers are unable to guarantee the work
due to ongoing ground movement w hich is not related to the applicant’s claim.
I have set out particulars of the relevant engineering findings in section 3.2 of this
determination. I do not propose repeating the engineering findings in this section of
the determination.
I accept after considering the evidence from the various engineers and leak detection
specialist who inspected the property that it is difficult to accept that the damage from
the leaking pipe the left back of the home was responsible for all of the observed
damage.
Whilst the FSP has accepted liability for the repair of the applicant’s property caused
by movement to the property, it has done so more as an act of good faith given its
decision in October 2012 rather than based on the further engineering reports
obtained.
I accept in these circumstances that as there is likely to be ongoing ground
movement that the FSP is entitled to elect to cash settle the applicant’s claim rather
than complete the repairs.
Case No: 430588 Determination Page 3 of 9
2.2 Is the FSP’s offer to cash settle the applicant’s claim fair in all the
circumstances?
FSP agreed to pay for the repair of the home
Although the FSP may not be liable for all the damage to the home given the
engineering findings, it has agreed to pay for the repairs to the home.
The FSP did so in acknowledgement of the possible contribution of the leaking pipe
to the damage to the home.
Quotation for repair of the home
The FSP obtained several scopes of works for the repairs to home, the most recent
by engineer WPB.
The FSP also obtained quotations for the repairs outlined in the scope of works.
Builder JPF provided a quotation of $29,977.09, while builder JLG quoted
$50,853.99. The applicant also obtained a quotation from ACB for $37,600.
None of the quotations provide an allowance for other benefits payable under the
policy such as:
temporary accommodation if the home is unlivable
removal of debris
The FSP’s offer to cash settle the claim for $29,997.09 is based on the quotation
from JPF. That quotation does not include a quote for the footings and stumps which
had heaved, does not allow for the complete removal of the bathroom floor and tiles
or the likely required repairs following the relevelling of the property.
I do not accept that JPF’s quotation is adequate to allow the applicant to repair the
damage to the property as agreed.
In my view, the quotations obtained from the applicant’s builder ACB and from the
FSP’s builder JLG are more appropriate quotations on which to base a cash
settlement.
In my view, it is fair to take an average of the quotations from ACB and JLG which
gives a figure of $44,226.54. Allowing for the likelihood of temporary accommodation
and rubbish removal and the transfer of the risks associated with the repairs, I am
satisfied that a fair figure to cash settle the claim is $50,000.
Case No: 430588 Determination Page 4 of 9
3 Supporting information
3.1 Policy provisions
Product Disclosure Statement – preparation date 20 Feb 2008
‘ Home insurance – What IS covered
Escape of liquid from the following.
Any water main or fixed pipe, gutter or guttering, fixed tank or drain.
…
Temporary accommodation
Following loss or damage insured by this policy, if we are satisfied your home is
unliveable, we will pay any additional costs you incur for similar accommodation until
you are able to live in your home.
The amount we pay you will be based on the market’s weekly rental value of your
home….
Maximum benefit - Up to 20% of the sum insured as shown on your certificate
…
General exclusions applicable to your policy
…
Structural defects or faulty workmanship, settling, shrinkage or expansion.
The action of the sea, erosion, landslide, subsidence or tsunami.
…
Paying your claim
How we pay a claim for your home
Where we pay a claim for your home, we will choose to do one of the following:
• repair your home,
• replace the damaged portion of your home,
• compensate you the amount it would have cost us for repair or replacement.
…’
3.2 Reports referenced
Record Key points
FSP’s leak
detection
specialist (AL)
Report
9 Jan 2012
CCTV inspection of storm water line failed due to breaks,
misaligned joins and blockages, all in the VIC clay sections of
line.
Due to blockages and line appearing to drop away at rear of
house, could not get through to easement point.
Entire storm water line to be completely renewed.
Case No: 430588 Determination Page 5 of 9
FSP’s
engineer (C)
Report
22 Feb 2012
Older dwelling – no doubt it has suffered from past differential
foundation movement – evident from previous patching and
permanent distortions to various door and window frames
Restumping occurred approx. 7 yrs. ago.
Inherent foundation movement will continue to occur, given
original perimeter strip footing most likely under - sized and
shallow founded.
Past leaking of below ground stormwater pipe system possibly
contributed to recent movements and damage.
Recommend re port from plumber
FSP’s
engineer (C)
Report
1 May 2012
AL has completed plumbing investigations report.
Domestic water supply pipe systems all holding pressure – no
leaks.
CCTV inspection of sewer and stormwater pipelines showed all
clear and no signs of faults or leakages
Leaking pipework can be eliminated as possible cause of recent
movement and damage.
Damage reported by applicant to older earthenware pipe join
located away from main dwelling. Highly unlikely this pipe
dislocation contributed to current and ongoing
movement/damage.
Current movement and damage are most likely an extension of
all previous foundation movements – which are expected to
continue until improvements made to general site drainage
issues and shallow foundation support.
FSP’s
engi neer (C)
Report
17 Sep 2012
Since issue of 1 May report, a plumbing report by AL (from Jan
2012) was provided. This predates April 2012 AL report upon
which 1 May report was based.
Jan 2012 report from AL identified numerous cracked and
misaligned joints i n older clay stormwater pipe, which would be
leaking. A partial blockage to drain from debris build up also
noted.
Given differing reports from AL, matter referred back to JM, the
proprietor of AL for further review and clarification.
New AL report (Sep 20 12) noted issues with pipe breakages and
misalignments – similar to Jan 2012 report.
Using Sep 2012 AL report plus sewer and stormwater pipe
diagram from relevant authorities, confirmed that:
o an easement runs down southern side of property, and
contains st ormwater barrel drain
o 6 downpipes and 1 surface grate in front of garage connect to
stormwater drainage.
Foundation movement and damage to main dwelling structure in
front South/Eastern corner region & cracking to front veranda not
regarded as due to any leaking storm water drainage – instead
regarded as being due to founding soil movement issues from
external drainage inadequacies (this is after considering lay of
land, general movements, cracking patt erns, and leaking storm
water pipeline locations)
Possible that cracked & misaligned leaking clay stormwater
Case No: 430588 Determination Page 6 of 9
pipework (surrounding North and West sides of dwelling)
contributed to other fresher movements and damage occurring
throughout remaining areas of b uilding
Significant rainfall over 2 - 3 years increased amount of leakage
water from pipes, and affected shrink/swell movements of
foundations
After applicant rectifies all stormwater pipe leaks (and it is
recommended that all clay piping be replaced), a minimum 6
months drying out required before repairs to building considered.
FSP engineer
(F)
Report
11 Feb 2015
Old clay underground stormwater pipework now replaced with
aboveground PVC piping.
All existing sewer pipework in good serviceable condition.
Internal cracking has become progressively worse since re -
stumping 10 years ago.
Foundation soil expected to be highly reactive clay.
Floor levels show 2 distinct general patterns of movement to
floor
Pronounced pattern of settlement around location of mai n
central hallway walls:
o attributed to consolidation settlement and long term
shrinkage drying of reactive clay foundation soils
o also consistent with re - stumping & expected ongoing
differential movements of foundation soils (highly likely
restumping may no t have achieved site - specific founding
depths)
o consistent with info from applicant that cracking to internal
plasterwork is ongoing and worsened since restumping.
o agree with C opinion that cracking to overall building caused
by ongoing differential movemen ts to reactive clay founding
soils
o do not agree with C about cracking to internal plasterwork –
which is considered to related to leaking of pipework but due
to factors listed above
o leaking pipework located external to footprint of enclosing
building envelope and therefore it is not physically possible
for leaking to cause or contribute to damage to internal
plasterwork.
Discernable (but minor) general pattern of movement of floor
toward south - western corner of building
o coincides with cracking to exter nal brickwork
o storm water leakage may have contributed to cracking
damage to misaligned brickwork at this location to return
corner walls only.
o appears previous leaking storm water adjacent to south -
western corner caused localised external foundation soils to
swell and leading to inward rotation of strip footing and
supported brick wall.
F disagrees with C re: cause of remainder of observed external
wall brickwork cracking – F considers this damage due to
differential movements of foundation soils/footing, and not due to
Case No: 430588 Determination Page 7 of 9
leaking storm water pipes.
Differential footing movements are as a result of one or more of
the following factors:
o Long - term/ongoing foundation soil moisture content
variations from seasonal changes
o drought conditions 1997 - 2010 & then retur n to normal rainfall
o very dry/hot conditions in summer of 2012/13 and 2013/14
o tree roots drying (minor)
o poor site drainage (particularly at affected front of dwelling)
o site not being adequately maintained
o previously poorly maintained storm water drainage s ystem.
Photos and floor level plan attached.
Applicant’s
engineer (AC)
Report
10 Oct 2015
Evidence shows restumping of home in 1993.
Floor uneven – the fall observed most towards left back corner
of home.
Stormwater damage observed during 2008 concreting work.
Damage stormwater at left back of home fixed in 2014.
2008 - 2014 water was ponding under subfloor – during heavy
rain a thick layer of water would flow towards road (applicant
photos show this)
Subfloor soil layers must have been affected by water p onding
for many years. The members like stumps must have started
sinking at left back of home, causing differential settling
Although soil reactivity, soil movement, drought and tree roots
contribute to differential settling of a house, in this case the
in fluence of these factors to this home’s differential settling is
considered negligible.
AC has found substantial reasons to say the home’s differential
settling started from left back corner, resulting in cracking in wall.
Remediated above - ground stormwate r pipework has stopped
ponding of water under subfloor, which was observed to be
reasonably dry
AC disagrees with finding in 11 Feb 2015 report from F
regarding contribution of trees and soil reactivity to differential
movement to home.
AC believes that b roken stormwater pipe in left back corner
caused ponding in subfloor at this location, and layers of soil lost
load bearing ability due to long term absorption of extra
moisture. (strength of soil comes from friction between soil
particles – when pore wate r is present in pores/voids of soil,
pore water pressure pushes particles apart and reduces load
bearing capacity of soil.)
Most of the major external and internal defects/damage
observed around home started with differential settling of home.
Estimated cost of repairs to observed/photographed damage -
$37,600.
Photos attached.
Case No: 430588 Determination Page 8 of 9
FSP’s
engineer
(WPB)
Report
5 May 2016
Home in fair to poor condition for its age. Moderate to severe
cracks to brick veneer on all sides of home (particularly front and
rear walls).
Movement between brickwork and window frames, and in roof
guttering at south re - entrant corner of home.
Concrete slab at front of home severely cracked, and settled in
area (applicant advises settled portion of slab is extension
constructed after t he smaller, unsettled portion at front door).
3 moderate cracks observed in pavement at rear – not
structurally significant and likely shrinkage cracks.
Front and back doors jam on closing – misalignment apparent in
front door with gap formed in upper corn er
Inside home, noticeable drops and high points in floor level –
likely caused by differential movement of stumps.
Slight to moderate cracks in various areas of home – incl
eastern corner of bedroom 1;NE and SW sides of bedroom 2;
between doorframes in la undry; above door and window frames
in kitchen; on south wall of dining room; on majority of walls in
lounge; in hallway.
Patterning of racking widespread and not isolated to one area.
Built - in wardrobe of bedroom 1 has separated and leaning out
from wall
Some wall tiles in bathroom cracked, splashback tiles in kitchen
separated along grout line.
WPB’s opinion that home has experience differential ground
movement over an extended period of time
Given severity of damage, plausible that damage has been
made w orse by previous or current pipe leaks and wetting of
subfloor.
Recommend leak testing be done on all pipework (stormwater,
water and sewer pipes), and rectify any leaks or blockages
found
Allow ground moisture levels underneath home to stabilise prior
to remedial works (4 - 6 months recommended), then reassess
soil conditions and damage.
Photos and Scope of Works for repairs attached.
FSP’s builder
(JLG)
Quotation
23 May 2016
Total cost of repairs based on WPB scope of works $47,042
FSP’s builder
(JPF)
Quotation
17 May 2016
Total cost of repairs based on WPB scope of works $27,300
FSP engineer
(WPB)
Memo
1 June 2016
Response to questions from applicant (though FSP):
o Damage to all walls included in May 2016 report, incl western
wall. Assumed that lean wo uld stabilise once ground moisture
levels normalise (so no make - safe required). Included as part
Case No: 430588 Determination Page 9 of 9
of repairs to re - entrant southern corner.
o Confirm a small section of floating timber floorboards near
bathroom uneven and creaked – from stumps settling below.
Packing of stumps (included in SOW in May 2016 report
should address this)
o Damage to vinyl flooring to kitchen observed but not included
in May 2016 report
o Slight bow in hallway/laundry plaster wall should have been
included as part of repairs noted in May 2016 report –
although expected that re - levelling or stumps will address this.
o Cannot comment on deflections of wall studs (non - invasive
inspection only). Deflection only observed to plaster wall, and
should be repaired as part of scope of works. Recommend
builder inspect wall studs once plaster is removed to confirm.
o No roof report perform due to workplace health and safety.
Cannot comme nt on any damaged roof beams.
FSP’s plumber
(SP)
Inspection
reports
12 & 17 May
2016
Pressure test at 350Kpa of hot and cold water pipes - No
pressure loss over 15 mins
CCTV inspections of property’s below ground sewer drainage –
found all drainage in ser viceable condition – no defects
detected.
Approx 30m of 90mm below ground and suspended stormwater
drainage pipes servicing property. Storm water inspections were
carried out via subfloor area – images show no leaks.
FSP’s builder
(JLG)
Revised
quotation
22 Jul 2016
Total cost of repairs based on WPB scope of works (including
allowance for items noted in WPB’s 1 Jun memo) $50,853.99
FSP’s builder
(JPF)
Revised
Quotation
19 Jul 2016
Total cost of repairs based on WPB scope of works (including
changes in 1 Jun memo) $29,977.09
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.