Home / Financial Firm (Unknown - Insurer) / Determination 428828
Determination 428828
Limit of liability for power-surge damage to an inclinator and rebuild-to-code claim
Summary
The applicant claimed $71,455.70 to repair an inclinator after a power surge, and the FSP had paid $4,000 net for the PLC. AFCA found the surge damaged only the PLC and backup batteries, and ordered the FSP to meet the additional battery replacement costs, with no figure stated.
Under the policy the rebuild-to-code extension covers only the parts damaged by the covered loss, so pre-existing damage and other standards upgrades are not payable.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to limit its liability to the cost associated with replacing the PLC and the backup batteries.”
- Claim amount dispute secondary · upheld
“The FSP is liable to meet the additional costs associated with the replacement of the backup batteries as per section 2.2.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 428828 Determination Page 1 of 5
Case number: 428828 27 February 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under her Building and Contents Policy held with the
financial services provider (FSP), for the replacement of an inclinator following a
power surge at the applicant’s property on or about 28 November 2013.
The FSP accepts that there has been damage to the inclinator as a result of a power
spike during a storm on or about 28 November 2013, but maintains its liability is
limited to repair or replace those parts of the inclinator damaged by the power spike.
The FSP offered the applicant $4,000 net of the policy excess of $1,000.
The applicant disputes this decision and seeks $71,455.70 being the total cost to
repair the inclinator to current Australian standards.
1.2 Issues and key findings
Has the applicant established a claim within the terms of the policy?
The applicant has established a claim within the terms of the policy for damage
sustained to the inclinator as a result of a power surge spike on or about
28 November 2013.
Is the FSP entitled to limit its liability?
The FSP is entitled to limit its liability to the cost associated with replacing the PLC
and the backup batteries. I am satisfied the FSP has established, on the balance of
probabilities, that the remaining loss or damage was not caused or contributed to by
the power surge.
Insofar as the policy provides for damaged parts to be rebuilt to code, I am satisfied
that this applies to the PLC and backup batteries only.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP has paid the applicant $4,000 net of the policy excess of $1,000 for the
replacement of the PLC. The FSP is liable to meet the additional costs associated
with the replacement of the backup batteries as per section 2.2 of this determination.
The FSP is otherwise entitled to rely upon the terms and conditions of the policy to
refuse payment of the applicant’s claim.
Case No: 428828 Determination Page 2 of 5
2 Reasons for determination
There has been a full exchange of material between the parties with detailed
submissions made on behalf of the applicant by her representative and on behalf of
the FSP.
Both parties have had the opportunity of addressing the issues that arise from the
information exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Has the applicant established a claim within the terms of the policy?
The applicant has established a claim within the terms of the policy
There is no dispute that on or about 28 November 2013 the applica nt’s home was
affected by a power surge. The FSP has accepted that this occurred.
Following the power surge, the applicant’s inclinator developed problems. Again that
is not disputed. Damage was first identified when the door to the inclinator would not
open and the inclinator would not function.
The FSP has accepted liability for the damage sustained to the inclinator as a result
of the power surge. The policy provides cover for physical loss or damage to the
property subject to conditions and exclusions.
I am satisfied the applicant has established a claim within the terms of the policy. The
onus is therefore with the FSP if it seeks to limit its liability based on a condition or
exclusion within the policy.
2.2 Is the FSP entitled to limit its liability?
The FSP maintains that much of the work performed to repair the inclinator by the
applicant’s engineer ‘D’ was unrelated to or a result of the power surge or the
damage to the PLC.
The applicant maintains the report relied on by the FSP was not based on technical
expertise, proper investigation of the damage, or substantiated opinions. The
applicant maintains all the work was required to repair the inclinator to current code
standards.
Report from ALR
The applicant provided a report from ALR dated 19 January 2015. ALR was
requested by the engineer ‘D’ to supply and install a new PLC. The report relates to
the controller design. It considered that the new PLC supplied was designed and
installed in accordance with the relevant design circuit diagrams and would comply
with the relevant Australian standards. The report did not address the additional
repairs.
Case No: 428828 Determination Page 3 of 5
Report from D
A report dated 23 December 2013 from D noted a number of findings as follows:
the electrical schematics were sub-standard
electrical panel messy and incomplete
safety risk analysis not documented
the three limit switches used for the safety power cut off circuit are not safety
rated limit switches
the top level limit switch shows damage to the roller mechanism
the slack rope limit switch is not mounted for positive guided operation
all limit switches should be replaced as part of an overall system upgrade
the contactors currently used to power the variable speed drive are not safety
rated contactors
the thermal overload designed to monitor the electric current to the braking
resistors is not the safest operation
the electrical cable ducting is in the panel is too small
the current ventilation system for the electrical panel does not appear to be sized
correctly
backup batteries located at the bottom of the panel are out of charge and show
extensive case extension/deformation damage which can be as a result of
exposure to abnormal voltage or currents
there is currently no emergency stop push button
the circuit providing power to the car door lift, car door internal light and TV
monitoring does not appear to be protected by a Residual Current Device
(RCD)
the up indicator in the inclinator, the ground level send indicator and top level call
indicator do not work
the motor cowling covering the rotating shaft at the back of the motor is missing
from the motor and should be replaced.
Much of the damage identified by D clearly pre-exists the events resulting in the
power surge in November 2013.
In a subsequent report D advised that the underlying issues with the inclinator
needed to be addressed to bring the inclinator up to current Australian standards.
I am satisfied that the information exchanged confirms the repairs to the inclinator are
required to bring the inclinator up to current standards.
Report from KA
The FSP provided a report from KA. It is a detailed report and includes a review of
the report from D.
KA does not dispute the finding reported by ‘D’. KA considered the only damage
attributable to abnormal voltages or currents (power surge) was the damage to the
PLC.
Case No: 428828 Determination Page 4 of 5
KA did not believe power surge was the cause of the other electrical failure. He
considered such electrical parts are either worn due to general usage or the items
were not electrical items.
I note that whilst KA rejected a view that majority of the damage was caused due to
the power surge, he did concede that damage to the backup batteries located at the
bottom of the panel could have been damaged as a result of a possible overvoltage.
Whilst he commented that most likely this was a result of an internal failure of the DC
supply regulator, he has not explained why he considered this to be the case.
Damage to PLC and backup batteries due to power surge
I accept that the majority of the damage was not caused by the power surge. I accept
however that the damage to the PLC and backup batteries can be attributed to the
power surge. I am satisfied that the information exchanged supports this finding .
The FSP is not liable to rebuild the inclinator to code
The policy provides that after a covered loss (in this case after the loss caused by the
power surge), the FSP will pay the necessary costs of conforming to any law or to
any ordinance that requires or regulates:
the repair, replacement or rebuilding or demolition of the damaged portion of your
house or other permanent structures made necessary by the covered loss.
The applicant whilst acknowledging that exclusions relating to wear and tear, gradual
deterioration and general maintenance works may apply, argues that the FSP has
failed to give adequate consideration to the extension for covered loss available
under the indemnity for rebuilding to code.
The applicant argues based on a supplementary report from D dated 21 August 2014
that in addition to the repairs to the PLC, it was required to replace or modify the
design in order to comply with the relevant industry standards of the various
components identified at its earlier report.
I accept that repairs were required to the inclinator to bring the various components
up to the necessary Australian standards.
I accept that whilst there are multiple issues with the inclinator, some of which impact
on the safe operation of the inclinator, there is no evidence linking these issues with
the power surge.
The information presented suggests that there had been longstanding issues with the
inclinator which pre-dated the power surge.
I accept that it was necessary to replace the PLC with a PLC that was compliant with
code.
I accept that the PLC has been replaced. By replacing the PLC (and the backup
batteries) this meets the requirement of the policy provision to repair/rebuild the
damaged portion of the structure (the inclinator). The PLC was replaced with a
compliant PLC. The other parts of the structure were not damaged by the power
surge. It was not necessary to repair/replace them to make the PLC compliant.
Case No: 428828 Determination Page 5 of 5
I do not accept that the indemnity provision relating to rebuild/repair requires in these
circumstances the FSP to do anything more than rebuild or replace the PLC and
batteries to meet with the current standards. I do not accept that the provision
requires the FSP to repair the pre-existing damage to the inclinator.