Determination 428828

Limit of liability for power-surge damage to an inclinator and rebuild-to-code claim

FirmFinancial Firm (Unknown - Insurer)
Decided2017-04-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$71,456
SourceAFCA PDF

Summary

The applicant claimed $71,455.70 to repair an inclinator after a power surge, and the FSP had paid $4,000 net for the PLC. AFCA found the surge damaged only the PLC and backup batteries, and ordered the FSP to meet the additional battery replacement costs, with no figure stated.

Under the policy the rebuild-to-code extension covers only the parts damaged by the covered loss, so pre-existing damage and other standards upgrades are not payable.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 428828 Determination Page 1 of 5 Case number: 428828 27 February 2017 1 Overview 1.1 Dispute The applicant lodged a claim under her Building and Contents Policy held with the financial services provider (FSP), for the replacement of an inclinator following a power surge at the applicant’s property on or about 28 November 2013. The FSP accepts that there has been damage to the inclinator as a result of a power spike during a storm on or about 28 November 2013, but maintains its liability is limited to repair or replace those parts of the inclinator damaged by the power spike. The FSP offered the applicant $4,000 net of the policy excess of $1,000. The applicant disputes this decision and seeks $71,455.70 being the total cost to repair the inclinator to current Australian standards. 1.2 Issues and key findings Has the applicant established a claim within the terms of the policy? The applicant has established a claim within the terms of the policy for damage sustained to the inclinator as a result of a power surge spike on or about 28 November 2013. Is the FSP entitled to limit its liability? The FSP is entitled to limit its liability to the cost associated with replacing the PLC and the backup batteries. I am satisfied the FSP has established, on the balance of probabilities, that the remaining loss or damage was not caused or contributed to by the power surge. Insofar as the policy provides for damaged parts to be rebuilt to code, I am satisfied that this applies to the PLC and backup batteries only. 1.3 Determination This determination is partially in favour of the applicant. The FSP has paid the applicant $4,000 net of the policy excess of $1,000 for the replacement of the PLC. The FSP is liable to meet the additional costs associated with the replacement of the backup batteries as per section 2.2 of this determination. The FSP is otherwise entitled to rely upon the terms and conditions of the policy to refuse payment of the applicant’s claim. Case No: 428828 Determination Page 2 of 5 2 Reasons for determination There has been a full exchange of material between the parties with detailed submissions made on behalf of the applicant by her representative and on behalf of the FSP. Both parties have had the opportunity of addressing the issues that arise from the information exchanged. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Has the applicant established a claim within the terms of the policy? The applicant has established a claim within the terms of the policy There is no dispute that on or about 28 November 2013 the applica nt’s home was affected by a power surge. The FSP has accepted that this occurred. Following the power surge, the applicant’s inclinator developed problems. Again that is not disputed. Damage was first identified when the door to the inclinator would not open and the inclinator would not function. The FSP has accepted liability for the damage sustained to the inclinator as a result of the power surge. The policy provides cover for physical loss or damage to the property subject to conditions and exclusions. I am satisfied the applicant has established a claim within the terms of the policy. The onus is therefore with the FSP if it seeks to limit its liability based on a condition or exclusion within the policy. 2.2 Is the FSP entitled to limit its liability? The FSP maintains that much of the work performed to repair the inclinator by the applicant’s engineer ‘D’ was unrelated to or a result of the power surge or the damage to the PLC. The applicant maintains the report relied on by the FSP was not based on technical expertise, proper investigation of the damage, or substantiated opinions. The applicant maintains all the work was required to repair the inclinator to current code standards. Report from ALR The applicant provided a report from ALR dated 19 January 2015. ALR was requested by the engineer ‘D’ to supply and install a new PLC. The report relates to the controller design. It considered that the new PLC supplied was designed and installed in accordance with the relevant design circuit diagrams and would comply with the relevant Australian standards. The report did not address the additional repairs. Case No: 428828 Determination Page 3 of 5 Report from D A report dated 23 December 2013 from D noted a number of findings as follows:  the electrical schematics were sub-standard  electrical panel messy and incomplete  safety risk analysis not documented  the three limit switches used for the safety power cut off circuit are not safety rated limit switches  the top level limit switch shows damage to the roller mechanism  the slack rope limit switch is not mounted for positive guided operation  all limit switches should be replaced as part of an overall system upgrade  the contactors currently used to power the variable speed drive are not safety rated contactors  the thermal overload designed to monitor the electric current to the braking resistors is not the safest operation  the electrical cable ducting is in the panel is too small  the current ventilation system for the electrical panel does not appear to be sized correctly  backup batteries located at the bottom of the panel are out of charge and show extensive case extension/deformation damage which can be as a result of exposure to abnormal voltage or currents  there is currently no emergency stop push button  the circuit providing power to the car door lift, car door internal light and TV monitoring does not appear to be protected by a Residual Current Device (RCD)  the up indicator in the inclinator, the ground level send indicator and top level call indicator do not work  the motor cowling covering the rotating shaft at the back of the motor is missing from the motor and should be replaced. Much of the damage identified by D clearly pre-exists the events resulting in the power surge in November 2013. In a subsequent report D advised that the underlying issues with the inclinator needed to be addressed to bring the inclinator up to current Australian standards. I am satisfied that the information exchanged confirms the repairs to the inclinator are required to bring the inclinator up to current standards. Report from KA The FSP provided a report from KA. It is a detailed report and includes a review of the report from D. KA does not dispute the finding reported by ‘D’. KA considered the only damage attributable to abnormal voltages or currents (power surge) was the damage to the PLC. Case No: 428828 Determination Page 4 of 5 KA did not believe power surge was the cause of the other electrical failure. He considered such electrical parts are either worn due to general usage or the items were not electrical items. I note that whilst KA rejected a view that majority of the damage was caused due to the power surge, he did concede that damage to the backup batteries located at the bottom of the panel could have been damaged as a result of a possible overvoltage. Whilst he commented that most likely this was a result of an internal failure of the DC supply regulator, he has not explained why he considered this to be the case. Damage to PLC and backup batteries due to power surge I accept that the majority of the damage was not caused by the power surge. I accept however that the damage to the PLC and backup batteries can be attributed to the power surge. I am satisfied that the information exchanged supports this finding . The FSP is not liable to rebuild the inclinator to code The policy provides that after a covered loss (in this case after the loss caused by the power surge), the FSP will pay the necessary costs of conforming to any law or to any ordinance that requires or regulates:  the repair, replacement or rebuilding or demolition of the damaged portion of your house or other permanent structures made necessary by the covered loss. The applicant whilst acknowledging that exclusions relating to wear and tear, gradual deterioration and general maintenance works may apply, argues that the FSP has failed to give adequate consideration to the extension for covered loss available under the indemnity for rebuilding to code. The applicant argues based on a supplementary report from D dated 21 August 2014 that in addition to the repairs to the PLC, it was required to replace or modify the design in order to comply with the relevant industry standards of the various components identified at its earlier report. I accept that repairs were required to the inclinator to bring the various components up to the necessary Australian standards. I accept that whilst there are multiple issues with the inclinator, some of which impact on the safe operation of the inclinator, there is no evidence linking these issues with the power surge. The information presented suggests that there had been longstanding issues with the inclinator which pre-dated the power surge. I accept that it was necessary to replace the PLC with a PLC that was compliant with code. I accept that the PLC has been replaced. By replacing the PLC (and the backup batteries) this meets the requirement of the policy provision to repair/rebuild the damaged portion of the structure (the inclinator). The PLC was replaced with a compliant PLC. The other parts of the structure were not damaged by the power surge. It was not necessary to repair/replace them to make the PLC compliant. Case No: 428828 Determination Page 5 of 5 I do not accept that the indemnity provision relating to rebuild/repair requires in these circumstances the FSP to do anything more than rebuild or replace the PLC and batteries to meet with the current standards. I do not accept that the provision requires the FSP to repair the pre-existing damage to the inclinator.