Storm claim for roof replacement, lower storey, upper storey and mould partly declined or underpaid
Text of the determination
Determination
Case No: 428626 Determination Page 1 of 14
Case number: 428626 28 October 2016
1 Overview
1.1 Dispute
The applicants claim their home was damaged in a storm on 8 December 2014. A
claim was lodged with the FSP for damage to the roof, damage to the upper and
lower levels of the home resulting from water ingress, damage to a couch and
subsequent mould growth.
After a number of assessments, the FSP paid $2,499 for damage to the couch. The
FSP also offered to cover $2,056.34 for internal damage to the upper floor ceilings,
and $9,989.99 towards the cost to replace the roof which offer was rejected by the
applicants. The FSP denies it is liable for the other damage claimed.
The applicants rejected the settlement offers saying the internal damages could not
be repaired for the amount offered, and that the roof required replacement. In
addition, the applicants continue to claim for the cost of mould remediation in the
home and for damage to the lower storey in the home.
1.2 Issues and key findings
Is the FSP entitled to deny the claim to replace the roof?
The FSP is entitled to deny the claim to replace the roof as the weight of the expert
opinion is there was little storm related damage to the roof. Rather, the weight of the
expert opinion is that cracks in the roof largely pre -dated the storm event or the
damage was due to defects, wear and tear or maintenance issues. These latter
causes of damage are excluded from cover. The FSP is only liable to pay the cost to
repair the cracked tiles in the sum of $365.20 subject to payment of the policy excess
of $500.
Is the FSP’s settlement offer for upper storey damage reasonab le?
The FSP has accepted wind driven rain caused water to enter the upper story of the
home causing damage. The material establishes a reasonable offer for damage to
the upper storey is $5,000. This is because the applicants‟ quote is more recent yet
the F SP‟s scope of works is now significantly out of date, no payment has yet been
made to the applicants, there is possible damage not visible at the time of inspection
by the FSP‟s expert and the expert says additional costs may apply once affected
areas have been exposed during repair, a cash settlement places all the risks with
the applicants, the areas of damage in the applicants‟ quote are mostly reflected in
photographs taken by the FSP‟s assessor in May 2016 and some damage to the
kitchen ceiling is prob ably caused by an excluded event (the pipe to the solar panel).
Case No: 428626 Determination Page 2 of 14
Is the FSP entitled to deny the claim for lower storey damage?
The material provided establishes the damage to the lower storey of the home was
caused by stormwater entry to the lower storey of the home because of inadequate
drainage and water barriers to external walls. As these causes of damage are
excluded from cover, the FSP is entitled to decline to indemnify the applicants for the
claimed damage to the lower storey of the home.
Is the FSP liable for mould damage in the home?
The material provided establishes water came into some areas of the upper storey of
the home because of an event for which the FSP accepted liability (wind driven rain
entering the home, as accepted by its experts) and because of a non-insured event
(the solar panel was not properly sealed). The material also establishes both parties
contributed to delay and the FSP‟s expert‟s opinion about the cost of mould
remediation includes known and unknown costs. It is therefore fair in all the
circumstances the FSP make a cash settlement to the applicants for mould
remediation to the kitchen, lounge room and sunroom and contents in the sum of
$10,000.
Are the applicants entitled to compensation?
The material establishes there has been an unusual amount of time taken to resolve
the situation and the FSP‟s conduct and claims handling has interfered with the
applicants‟ expectation of enjoyment or peace of mind. Therefore it is fair in all the
circumstances the FSP pay to the applicants $1,000 compensation.
1.3 Determination
This determination is partly in favour of the applicants.
Should the applicants accept this determination, then within seven days of
acceptance, the FSP is to make the following payments to the applicants:
$365.20 to repair cracked tiles
$5,000 for upper storey damage
$10,000 for mould remediation
$1,000 compensation
The FSP is entitled to deduct $500 excess from the settlement amounts.
Otherwise, the FSP is not obliged to take any further action in relation to the claim or
the dispute.
Case No: 428626 Determination Page 3 of 14
2 Reasons for determination
2.1 Is the FSP’s entitled to deny the claim to replace the roof?
Applicants must establish damage claimed was caused in storm event
The applicants must establish on the balance of probabilities they suffered damage
caused by the storm (as defined in the policy) on 8 December 2014. This is known as
a prima facie claim.
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the damage
claimed.
Various experts have inspected the roof
The applicants lodged a claim the day after the storm event. The FSP‟s file notes
state the applicants advised storm water had come down a hill under the door and
into the home. They also claimed the ceiling in the kitchen leaked.
The FSP arranged for a builder M to attend and inspect the damage on 6 January
2015. M was further advised, during the storm, water flowed into the lower level of
the home entering the shower area, toilet and rear room. He was also told water
leaked through two light fittings in the upper level lounge area.
M notes a contractor applied silicone to two cracked tiles. He said the roof had not
leaked since. M inspected the roof and noted another cracked tile. M repaired it using
silicone. M also cleaned and cleared valleys and gutters of debris which he said
could have been causing water to back up and enter the home.
The applicants said the roof continued to leak so the FSP arranged for another
builder, C, to attend and inspect the damage on 6 March 2015. This report refers to
damage to the lower-level area rooms.
The applicants continued to report the roof was leaking. The FSP‟s file notes indicate
the applicants said the damage was not limited to a few cracked tiles and flashing
had lifted in the storm.
As a result, C attended again and photographed the property and roof on 7 May
2015. C agreed water damage had occurred to the upper level sunroom, lounge and
kitchen ceilings and light fittings. C reported the damage was as a result of water
leaking through the tiled roof areas above during severe storm conditions. However,
C found no evidence of storm related damage to tiled roof areas.
C engaged a qualified roof tiler. C reported the tiler found no evidence of storm
related damage to the common tiles, ridge tiles or pointing. Specifically, the roof
tiler‟s report said:
“This roof has poor back flow, dirty rain channels are causing water to flow over the
side causing leaking. We noted flashing has cracking which has been silicone sealed,
valley has undersized space between valley tray tiles which requires to be cut back to
allow flow of water. Pointing is cracking due to age wear and tear and has been
Case No: 428626 Determination Page 4 of 14
silicone sealed during make safe attendance, also several tiles have been pushed up
and not been re-instated correctly which would contribute to water entry during storm
conditions.”
C scoped the internal work to be done in the sunroom, kitchen and lounge in the
amount of $2,056.34.
The FSP also had a report from a roofer N who found no storm related damage. N
reported:
“On inspection of the above roof we could not find any storm related damage arising
from hail or airborne debris impact - tree damage etc.
We opened sections of the tiled roof by removing several tiles, it was evident that tiles
had back flow due to pitch of roof and debris build up.
Also steel clips were used on this roof to hold tiles down, which in turn caused a drip
due to dirt build-up, there was also leaking on valleys, which were slightly blocked.
Skylights also had build-up of debris which was causing leaking.
There was no sarking installed to the roof when the dwelling was originally constructed.
Storm water has nowhere to go, apart from into the ceiling space….”
The applicants continued to maintain the roof was damaged in the storm and
provided a quote from the roofer H to replace the roof.
In due course, the applicants also provided an email from H about the cause of
damage. H reported the roof showed signs of water ingress in numerous locations. H
also said tiles are dislodged and broken throughout the roof especially around the
valley area. H quoted to replace the roof at a cost of $14,862 plus GST.
H amplified his opinion in an email to the FSP dated 18 December 2015. H described
the significant work required to repair the roof. Because of this, H recommended the
roof be replaced.
As to the cause of damage, H wrote:
“Water ingress is obvious in numerous locations throughout the roof area. Tree debris
has lodged under the lap of the tiles and also the side lap of the tiles causing water to
penetrate especially during storms/windy events. Tiles have also dislodged in many
locations. This dislodgement of the roofing material is certainly a result of numerous
storms. Once tree debris is forcefully lodged in the joins of tiles, they then become
vulnerable to dislodgement via strong wind….”
As a result of discussion and correspondence between H and the FSP, the FSP said
as there was dislodgement of tiles during the heavy storm, it would accept this
component of the repairs to the roof, only. H then provided an amended quote in the
amount of $9,081.81 plus GST.
The FSP offered to make contribution towards the costs to replace the roof by paying
$9,989.99. It said it made this offer even though the offer went beyond what should
have been accepted as storm damage.
The applicants rejected this offer.
Case No: 428626 Determination Page 5 of 14
The FSP then arranged for a further assessment of the cause of damage to the roof.
The builder (S) inspected and photographed the roof on 25 May 2016.
S made a number of observations including:
five years ago, the roof was repainted
subsequently, a solar power system was installed to the eastern and western
planes of the roof
there was no evidence of lead pointing or repairs to tiles
there were numerous tiles displaying cracking to the watercourse edge which
were painted over
there was no sarking installed to the underside of tiles which has allowed the
wind driven rain to access the rear of the ceiling
the lead flashing in the gable to the northern end of the house is degraded and
holding water because of poor initial installation
the main feed cable from the solar panel is directly above the area of the kitchen
ceiling where the damaged plasterboard adjacent to the light fitting is situated
and is fitted poorly such that during heavy rain, capillary action draws the water
along the cable into the rear of the ceiling
the roof sheet adjacent to the satellite dish is deformed so that it is no longer
compliant with manufacturer‟s installation instructions
corrugated sheet metal roofing extends beneath the tiles; there is no transfer
flashing to prevent transfer of moisture into the roof space of bedroom 3
S reported he found no evidence of a storm created opening in the roof surface.
S concluded:
“….water ingress to the ceilings of the residence has occurred as a result of wind
driven rain entering through the tiles during times of intense rainfall and wind activity.
This will not occur during normal to heavy storm conditions. The roof of the Insured‟s
residence shows evidence of maintenance which is the painting which has been
carried out, however the painting is of low standard. The roof surface does require
maintenance work which would be repair to the lead flashings of the Dutch gable and
also replacement of any tiles with damaged water courses. The corrugated sheet metal
roof above bedroom three is pitched under 5º and there is no transfer flashing which
has allowed the ingress of wind driven rain in that area. ”
I have considered S‟s photographs carefully. The photographs support his findings.
The FSP also arranged another report from SR at this same time. Relevantly, SR
reported on findings and observations in the ceiling cavity. SR reported:
5.2 Ceiling cavity
- Inspection concentrated to ceiling above kitchen and Lounge Room as area of
concerned (very low crawl space).
- Pipe passing from ceiling to roof (between roof tiles) to solar panel not properly
sealed (confirmation).
- 'Cool and Cosy' cellulose insulation in place, dry.
- Building materials dry, no visual water staining to frames.
Case No: 428626 Determination Page 6 of 14
- No broken tiles observed.
In response, the applicants provided a report and photographs from a roofer, M.
M roofing service reported:
“I did an inspection on the areas of the roof where leaks are and found a broken
water channel near the valley over the leak near front door I replaced that tile. The
area where the main leak is, is in the kitchen and the solar is not close to this area so
I can't see now the PV solar has anything to do with it. The wiring that is running into
the ceiling area from above the tiles doesn't look to be leaking I removed the tile from
above wiring and checked below it for any signs of leaks and found nothing. I am
sending photos of wiring area, broken water channel and from main leak area.”
The applicants also provided other material about the cost to repair/replace the roof
but the other material does not comment on the cause of damage to the roof.
Weight of expert material is that the roof was not damaged in storm event
M roofing service does not comment on the other observations made by S or others
regarding the state of the roof, and the cause of damage to the roof. Further,
although M identifies a broken water channel M does not describe how the water
channel broke. Specifically, M does not identify it broke during the subject storm. M
describes no other storm damage to the roof.
I have carefully considered all the material and photographs provided about storm
damage to the roof. I am not satisfied the preponderance of the expert material
establishes on the balance of probabilities the roof must be replaced because it was
damaged in the storm on 8 December 2014. The FSP provided reports
contemporaneous with the storm event. Aside from three broken tiles which were
either repaired or replaced, the FSP‟s reports establish no storm damage to the roof.
While the report provided by H says there are a number of tiles dislodged and broken
throughout the roof, and H says the roofing material was dislodged as a result of
numerous storms, H does not specifically identify the claimed damage was caused in
the storm on 8 December 2014.
H stands alone in his opinion the tiles were dislodged by storm(s). His causation
report is almost 12 months after the storm event. For the reasons stated above, I do
not accept the recent report from M roofing assists the applicants regarding storm
damage to the roof.
In March 2016, the FSP offered to settle the roof claim as per the revised quotation
from H. The applicants rejected this offer. After receiving the further expert reports in
May 2016, and upon review of material, in its Notice of Response the FSP has not
re-put the offer. Rather, the FSP says the roof has not been damaged by a single
one off storm event and is not covered under the policy.
I am satisfied the preponderance of the expert opinion establishes there was little
storm related damage to the roof. Rather, the weight of the expert opinion is that
cracks in the roof largely pre-dated the storm event or the damage was due to
defects or wear and tear or maintenance issues. These latter causes of damage are
excluded from cover.
Case No: 428626 Determination Page 7 of 14
M‟s report shows the cost to repair the cracked tiles was $365.20. The policy excess
is $500. In the circumstances, I am satisfied the FSP is entitled to deny the claim to
replace the roof.
2.2 Is the FSP’s settlement offer for upper storey damage reasonable?
FSP accepted water entry caused by wind driven rain
The applicants must establish on the balance of probabilities the upper storey
damage was caused by the storm event on 8 December 2014.
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the damage.
Relying on expert reports, the FSP submits the most likely cause of water entry is
wind driven rain. As such it says the internal plaster ceiling damage is covered under
the storm event in the policy.
The FSP‟s builder C provided a scope of works for repairs in the upper level
sunroom, kitchen and ceilings in the lounge/kitchen/dining/passage in the amount of
$2,056.34. C also noted there was possible damage not visible at the time of
inspection and additional costs may apply once affected areas have been exposed
during repair work. Relying on the scope of works from C, the FSP offered to cover
the damage to the upper floor ceilings in the amount of $2,056.34.
The applicants were not satisfied with the offer. The applicants obtained a quote from
A Interiors in the sum of $6,050. A‟s quote includes works as per the quotation from
the FSP‟s builder C but also includes works outside C‟s scope for a bedroom and
front room. A makes no comment about how the damage is caused by storm.
When the FSP‟s builder, M, attended the premises the applicants advised water had
leaked through two light fittings in the upper level lounge area. M photographed the
upper level living room light fitting where water had dripped through and noted it was
still operational. M took photographs of the upper level living room and kitchen but
made no further observation about storm damage.
When C attended on 6 March 2015 the focus was in relation to the lower-level rooms.
C attended again on 7 May 2015 and confirmed damage had occurred to the upper
level sunroom, lounge and kitchen ceilings and light fittings. C reported ceiling
material was water stained, sections were breaking down and the light fitting was
water affected and beyond repair.
C said the damage was as a result of water entry through the tiled roof during severe
storm conditions. C found no evidence of storm related damaged to the roof. C
arranged make safe repairs to the roof and recommended the applicants seek the
services of a qualified roof tiler to carry out maintenance related repairs.
When the FSP‟s internal assessor inspected the home on 25 May 2016, the assessor
took photographs which showed water damage in the kitchen, lounge, front sun
room, hallway and bedroom 3. The assessor made no comment about causation.
Case No: 428626 Determination Page 8 of 14
The internal assessor made arrangements for S to provide a report. S inspected the
property on 25 May 2016 and relevantly noted:
minor watermarking to the ceiling of the lounge and kitchen area
minor discoloration to the first floor ceilings consistent with water ingress
watermarking and discoloration to the plasterboard ceiling to the area around the
light fitting in the kitchen
no evidence of water ingress or markings to the ceilings adjacent to the
downlights in the lounge room
repair work in a bedroom at the rear of the house
S also concluded water ingress to the ceilings of the home had occurred as a result
of wind driven rain entering through the tiles during times of intense rainfall and wind
activity. However, S‟s scope of works focused on work required to the roof.
Expert material also establishes water came into the kitchen via pipe
S also commented on the role of the main feed cable from the solar panels
depositing water in the rear of the ceiling. It is noted M found no signs of leaks in the
cable at the time of his inspection. But S‟s opinion is supported by SR who inspected
the ceiling above the kitchen and lounge area and confirmed the pipe to the solar
panel was not properly sealed.
S‟s report explains how the main feed cable caused water to come into the kitchen
during storms, which establishes a prima facie claim. However, the applicants‟ expert
rebuts this explanation because he says the main leak in the kitchen is not close to
the solar panels and he found no leaking in the wiring from the solar panels.
SR confirmed the pipe to the solar panel was not properly sealed which supports S‟s
opinion. In these circumstances, while a prima facie claim may be established, I am
satisfied the material provided establishes the proximate cause of water coming into
the kitchen in this way during storms is because the pipe to the solar panel was not
properly sealed. This is a defect or structural fault or faulty workmanship. These
causes of damage are excluded from cover.
A reasonable offer for damage to the upper storey is $5,000
Taking all these matters into account, I am not satisfied the FSP‟s offer for damage to
the upper storey is reasonable. I consider it is fair in all the circumstances a
reasonable offer for damage to the upper storey is $5,000.
In making this determination, the matters I have taken into account include:
While FSP was willing to cash settle based on C‟s scope of works and quot ation,
no payment has yet been made to the applicants
C‟s scope is now significantly out of date (May 2015)
C noted there was possible damage not visible at the time of inspection and
additional costs may apply once affected areas have been exposed during repair
a cash settlement places all the risks with the applicants
the quote provided by A is more recent (April 2016)
the areas of damage described by A are mostly (but not entirely) reflected in
photographs taken by the FSP‟s assessor in May 2016
Case No: 428626 Determination Page 9 of 14
some damage to the kitchen ceiling is probably caused by an excluded event (the
pipe to the solar panel)
2.3 Is the FSP’s entitled to deny the claim for lower storey damage?
Expert evidence establishes lower storey damage caused by excluded events
The applicants claim the lower storey of the home was damaged in the storm.
When M inspected the home on 6 January 2015, he was told heavy rain caused
water to flow down the side hill from the backyard into the lower level of the home
entering the shower area, toilet and rear room. Photographs show the side of the
home where water flowed downhill through a door into the lower level of the home.
It is clear from discussions with C, at the inspection on 6 March 2015, the female
applicant was aware she was to engage a qualified tradesman to carry out drainage
modifications to the external areas of the home to prevent further storm water entry
to lower level areas.
At that inspection, C found no evidence of storm related damage but did note wear
and tear issues in rooms in the lower level area.
C‟s reported as follows:
soil levels were above the slab level at the rear of the home
there was inadequate drainage to rear right hand side of the home, and
no waterproof membrane was installed to the external wall below ground level
Because of these issues, C concluded large volumes of surface water were travelling
from the rear yard of the property, flooding and backing up against the rear and right
side elevation external walls and seeping into the lower levels of the home causing
flooding during severe storm conditions.
C took photographs which corroborate his findings. C concluded:
“The cause of storm water entry to lower level internal areas of the property is due to
inadequate draining and water barrier to external walls.”
As it contended there was no damage caused by an insured event, the FSP advised
the applicants it would not cover this aspect of the claim.
The applicants have not presented any expert material to rebut the FSP‟s material.
In the absence of rebuttal material from the applicants, I am satisfied the FSP is
entitled to rely on the expert evidence it obtained.
The applicants must establish on the balance of probabilities the lower storey
damage was caused by the storm event on 8 December 2014. The applicants
describe damage caused in the storm. However, the material provided establishes
the proximate cause of the stormwater entry to the lower storey of the home was
inadequate drainage and inadequate water barriers. The policy terms clearly
provided these causes of damage are excluded from cover.
Case No: 428626 Determination Page 10 of 14
On the information provided, I am satisfied the FSP has established on the balance
of probabilities the lower storey damage is caused by excluded events. It is therefore
entitled to decline cover for damage to the lower storey of the home.
2.4 Is the FSP liable for mould damage in the home?
Fair in all the circumstances the FSP pay $10,000 towards mould remediation
The applicants also claim mould is coming through the plasterboard in many places
in the home and cannot be repaired until the roof is replaced. The applicants
provided photographs of mould damage described as “pictures of the mould in the
roof.”
The FSP says the mould growth has occurred as a result of the time taken to attend
to the repairs identified by C. Further, the FSP contends extensive delays occurred
while the applicants obtained their own reports. Relying on expert material, the FSP
also contends mould growth in some areas of the house was not caused by an
insured event or by the storm event.
The FSP‟s file notes dated 9 February 2016 show first mention of the mould issue by
the applicants. A mould inspection report was conducted by SR on 25 May 2016.
SR inspected and photographed the home, used a moisture meter to take
measurements and accessed the ceiling space through a manhole in the hallway.
Visual mould growth to the building and to contents was confirmed.
SR noted the builder S was to confirm the cause of damage. As set out earlier in this
determination, S accepted water had come into the home as a result of wind driven
rain entering through the roof tiles during times of intense rainfall and wind activity.
SR also suspected water came into the kitchen and lounge room because the pipe to
the solar panel was not properly sealed. This finding was also made by S.
As for all other rooms and areas, SR concluded:
“Mould damage cause by other moisture issues, suspected dew point problems,
previous water damaged event in Bathroom and limited cross-flow ventilation (see
floor- plan layout of house). …..”
In the absence of expert evidence to the contrary, I am satisfied mould damage
identified by SR in the other rooms and areas as identified by SR in the floor plan
layout of the house was not caused by an insured event or by the storm event.
SR concluded the areas primarily affected by storm water ingress in the
November/December 2014 storms was the kitchen/dining room, lounge room and
sunroom.
While the FSP contends it is not liable to indemnify the applicants because the mould
growth in these areas could be attributed to the water entry from the roof where the
solar panel cable entered the ceiling, the FSP did not take into account the opinions
of both S and C who accepted water had come into the home as a result of wind
driven rain entering through the roof tiles during times of intense rainfall and wind.
Case No: 428626 Determination Page 11 of 14
The FSP also submitted mould growth in the kitchen, lounge and sunroom occurred
because of delays by the applicants in obtaining their own reports and attending to
repairs. The material establishes there was delay caused by the applicants in
providing a report from H about the cause of damage to the roof.
However, the material also establishes C inspected the home and prepared a scope
of damage for internal damage in May 2015 and yet a formal offer to sett le was not
made until 10 March 2016.
SR estimated mould remediation to the kitchen, lounge room and sunroom and
contents was $14,592.60.
The applicants have provided no material in relation to the extent or cost of mould
remediation.
In the absence of rebuttal material, I accept SR‟s opinion about the cost of mould
remediation. However, I also note SR‟s scope of works and quotation does not take
into account the cost of vacant occupancy during mould remediation (up to 7 days),
hidden mould and building restoration works.
On the material provided, I am satisfied water came into the home because of an
event for which the FSP accepted liability (wind driven rain entering the home as
accepted by S and C) and because of a non-insured event (the solar panel was not
properly sealed as reported by S and SR). As set out above, I am also satisfied both
parties have contributed to delay. Further, SR‟s opinion about the cost of mould
remediation includes known and unknown costs.
Taking all these matters into account, I consider it is fair in all the circumstances the
FSP make a cash settlement to the applicants for mould remediation to the kitchen,
lounge room and sunroom and contents in the sum of $10,000.
2.5 Are the applicants entitled to compensation?
FOS may award compensation in some circumstances
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the applicant‟s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
Fair in all the circumstances the FSP pay to the applicants $1,000
A timeline is included in the FSP‟s Notice of Response. I have also considered the
FSP‟s claims notes. Having considered the material provided, I am satisfied both
parties contributed to delay. For example, many months passed between t he FSP‟s
request for the causation report from H and the provision of that material.
However, I also consider the FSP did not manage the claim proactively. Delays
occurred after the claim was first lodged in appointing both M and C to inspect the
Case No: 428626 Determination Page 12 of 14
premises and provide a scope of works. Further, the FSP could have been more
proactive in its approach to the claim. For example, rather than contacting the
applicants‟ roofer to confirm the cause and extent of damage, the FSP waited a
further two months before taking this action. And, although the applicants complained
about the claims decision, and mould was in the roof on 9 February 2016, an offer to
settle the claim was not made until 10 March 2016 and a mould inspection did not
take place until 25 May 2016.
In the circumstances of this dispute, I consider there has been an unusual amount of
time taken to resolve the situation and the FSP‟s conduct and claims handling has
interfered with the applicants‟ expectation of enjoyment or peace of mind.
I am satisfied it is fair in all the circumstances the FSP pay to the applicants $1,000
compensation for non-financial loss.
Case No: 428626 Determination Page 13 of 14
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The words and phrases appearing in bold and italic print throughout this PDS have
special meanings as set out in the glossary below:
Storm • A violent wind including a tornado or named cyclone; or
• rain, hail or snow of unusual volume, force or duration.
Storm
What is covered
Your building and/or contents are covered for loss or damage caused by storm.
What is not covered
Your building and/or contents are not covered under this Insured Event for:
• loss or damage caused by wind, rain, hail or snow which entered an ordinarily fully
enclosed part of your building through an opening not created by the storm. This
includes but is not limited to:
– an open window or door; and
– any opening made for the purpose of any renovation, repair or maintenance work,
including where tarpaulins or other fixings have been set up.
Your building and/or contents are not covered under this Insured Event for loss or
damage as described in the General Exclusions listed on pages 75 to 78.
…
Case No: 428626 Determination Page 14 of 14
General Exclusions
The following general exclusions apply to all sections of this policy excluding:
• Domestic Workers‟ Compensation Cover; and
• Portable Contents Cover
Under this policy there is no cover provided for any loss, damage or liability caused
directly or indirectly by or in any way connected with:
1. defects, structural or design faults, faulty workmanship or faulty design;
…
4. wear and tear and lack of maintenance, including rust, corrosion and deterioration
(except in some instances relating to the Insured Events „Escape of liquid‟ and „Legal
liability‟ claims);
5. water, including rainwater, after it has disappeared beneath the surface of the land
at your insured address;
…
8. subsidence or landslide (except in the case of the Insured Events „Earthquake‟ and
„Explosion‟ claims);
…
13. mould, toxic mould, mildew, wet or dry rot, rising damp or dampness;
…
16. rats, mice and other vermin and insects including but not limited to cockroaches,
termites, flies, moths, lice or bedbugs;
…
33. the costs of obtaining a matching finish to any materials used to repair, rebuild or
replace your building and/or contents that are lost or damaged by an Insured Event in
order to align them with the finish of any undamaged parts of your building and/or
contents;
…
35. gradual loss or damage of any kind;
3.3 Other relevant material considered and relied on
Parties‟ submissions, emails, letters, quote s, invoices, reports, scopes of works
and photographs
Correspondence between the parties