Home / Financial Firm (Unknown - Insurer) / Determination 428538

Determination 428538

Claim denial for storm damage to home and contents

FirmFinancial Firm (Unknown - Insurer)
Decided2016-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The FSP denied a home and contents claim for storm damage, relying on maintenance and deterioration. AFCA found a storm opened the roof and the exclusions did not apply, ordering a new scope of works, claim settlement and $1,500 non-financial loss compensation.

Once the insured establishes a prima facie storm loss, the insurer must prove an exclusion applies, which the FSP did not do on the balance of probabilities.

Issues

Subjects and remedies

disabilityhealth or medicalhome or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 428538 Determination Page 1 of 8 Case number: 428538 22 November 2016 1 Overview 1.1 Dispute The applicant owns a home which was insured under a Home and Contents Insurance Policy (the policy) with the financial services provider (FSP). In November 2015, the applicant went on a holiday. When he returned, he discovered the ceiling and insulation in the lounge room of the home had collapsed. On 7 December 2015, the applicant lodged a claim for the damage. The applicant claims water entered the home as the storm dislodged roof tiles. The FSP denied the claim relying on its assessor‟s report and photographs. It says there was no storm created openings or damage to the roof. It also says the ceiling collapsed because water entered via the deteriorated roof. In conjunction with the deterioration of the grout straps used to secure the internal ceiling lining and grout straps used to fix the linings to the roof framing, it says this was the cause of the damage. As these causes of damage are excluded from cover, the FSP submitted it was entitled to deny the claim. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the applicant. While the applicant accepted the recommendation, the FSP has not responded to the recommendation. In the circumstances, the dispute has been referred to me for determination . 1.2 Issues and key findings Is the FSP entitled do deny the applicant’s claim ? The FSP is not entitled to deny the claim as the material establishes on the balance of probabilities the damage to the home and contents was caused by a storm event in December 2015 and the opening in the roof was caused by this storm. The material provided also establishes on the balance of probabilities the proximate cause of damage was not gradual deterioration and poor maintenance. In the circumstances, the FSP is not entitled to rely on the policy exclusions. Is the applicant entitled to compensation? The FSP is to pay the applicant $1,500 compensation as the material establishes there has been an unusual degree of physical inconvenience and time taken to resolve the situation which would have interfered with the applicant‟s expectation of enjoyment and peace of mind. Case No: 428538 Determination Page 2 of 8 1.3 Determination This determination is in favour of the applicant. If the applicant accepts this determination, then within seven days of acceptance, the FSP is to:  pay the applicant $1,500 compensation  arrange for a new scope of works to be prepared in conjunction with the applicant in relation to the damage to the home and contents caused by the storm event  thereafter forthwith settle the claim in accordance with the terms and conditions of the policy. Case No: 428538 Determination Page 3 of 8 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions . I have taken into account all the material submitted by the parties, both before and after the recommendation although no new material was provided after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. 2.1 Is the FSP entitled t o deny the applicant’s claim ? Damage was caused by storm event in December 2015 The applicant must establish on the balance of probabilities he has suffered a loss caused by storm. This is known as a prima facie claim. The applicant provided a photograph of two tiles which he says were dislodged by a strong wind in the storm event which took place just before he returned from holidays. He says the dislodged tiles allowed the rain to enter the lounge room and soak the ceiling which then collapsed because of its weight. The applicant also provided a photograph of his neighbour‟s wall and gate which he said was blown down on the night of the storm. The FSP‟s assessor provided Bureau of Meteorology (BOM) daily weather observations. The BOM observations show windy conditions from about 2 December 2015. Further, on 5 December and 6 December 2015, rain was recorded at 4.8mm and 11mm respectively. The FSP does not agree the roof tiles were dislodged by wind to provide an opening for storm water to enter. It says the winds were not strong enough to cause the reported damage to the tiles. It relies on an extract from BOM daily weather observations in November 2015 and the Beaufort wind scale. However, the applicant does not claim the storm event occurred in November 2015. The available material indicates windy conditions from about 2 December 2015. According to the Beaufort scale, the winds on 2, 5, 6 and 7 December 2015 would be described as “near gale” winds. While less than “strong gale” winds where slight structural damage occurs, in view of the applicant‟s description of “high winds and willie willies” and the photographs of the damage to the neighbour‟s gate and fence, I am satisfied, on the balance of probabilities, a strong wind occurred in early December 2015 which dislodged the two roof tiles. Further, the FSP‟s assessor reports the damage to the lounge room and contents was caused by a combination of high winds and rainfall although he also identified maintenance issues. I accept the applicant has established a prima facie claim. The opening in the roof was caused by the storm Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. Case No: 428538 Determination Page 4 of 8 The FSP‟s policy provides no cover to the interior of the home or to contents if the damage has not occurred as a result of an opening made by a storm. While the F SP relies on its assessor‟s report there was no storm created openings or damage to the roof cladding, I accept the applicant‟s contention this is because he replaced the two tiles before the assessor attended. The applicant says he told the assessor this and provided the assessor with a copy of the photographs of the missing tiles. The photographs are not referred to in the assessor‟s report. In a letter to FOS, the FSP says the applicant prejudiced the claim by not allowing inspection of the tiles or providing photographs prior to touching the tiles. But the FSP has provided no further specific material from the assessor denying the applicant‟s assertion. In those circumstances, I accept the applicant‟s positive assertion. I have considered the photographs provided by the applicant. The photographs show two dislodged tiles with openings which would allow the rain which fell on 5 and 6 December 2015 to enter the home and damage the home and contents. In the circumstances, I am not satisfied the FSP has established on the balance of probabilities the damage to the interior of the home and contents has not occurred as a result of an opening made by the storm. Proximate cause of damage not gradual deterioration and poor maintenance The FSP also argues it is entitled to deny the claim in circumstances where the damage was caused by gradual deterioration and poor maintenance. The FSP‟s assessor attended and photographed the insured property on 8 December 2015. The assessor reported the capping tile pointing had deteriorated significantly and in some areas was missing altogether. The assessor said rain entered the areas of deteriorated capping, leaked onto the ceiling below and contributed to the collapse of the lounge ceiling. Photographs taken by the assessor s how areas of deterioration. The assessor recommended the applicant engage a roofer to repair/replace the deteriorated pointing to the ridge and hip cappings to make the roof watertight. The applicant says the roof over the lounge room was in good condition. He says the FSP‟s photographs show the roof over other sections of the home. That is, the photographs are not of the front section of the home where the lounge room is located. He provided a photograph of the “front roof over the lounge” which he says i s “in top condition and also very waterproof.” As for the allegation the gable flashing apron was deteriorated, the applicant relies on an independent roof report. The applicant also provided photographs of gable flashings which he says are firm and watert ight: “good except the paint is a little worn.” The applicant engaged a roofer who provided a report on 23 May 2015 which said: „ Front section of roof is OK – Flashing OK. Tiles/Ridge caps are stable .‟ Case No: 428538 Determination Page 5 of 8 The FSP has not challenged the assertions made by the applicant regarding the location of the photographs taken by the FSP‟s assessor. The FSP has also not challenged the report from the applicant‟s roofer. In the circumstances, I am not satisfied, on the balance of probabilities, the FSP has established rain entered the lounge room via deteriorated capping or flashings over the lounge room. The assessor also identified a contributing factor. He described this as the progressive failure of the grout straps used to secure the linings to the ceiling framing and the weakening of grout straps used to fix the lining to the roof framing. In addition to replacing the tiles before the assessor arrived, the applicant says he cut down the wet ceiling panels by cutting the straps and put the panels outside the home. The applicant says when the storm dislodged the two tiles on the roof, water poured into the lounge ceiling, which became wet and dislodged, and fell down. He says the assessor did not inspect the grout straps. He says as they were wet, the straps weakened and brought down the ceiling. The assessor reported the damage occurred because of a combination of the storm event and the identified maintenance issues. The assessor describes the progressive failure of grout straps (most likely as a result of age) as a contributing factor. While I do not accept the applicant‟s assertion the assessor did not inspect the straps, there are no photographs of the straps to support the assessor‟s contention the straps were aged. The applicant was away from the home when rain entered the home on 5 and 6 December 2015. The applicant describes the ceiling panels as being wet. I accept this contention in view of the fact rainwater would have been falling on the ceiling without th e applicant‟s intervention for two days. In those circumstances, while the assessor describes the failure of the grout straps as a contributing factor, I am not satisfied this was the effective cause of the collapse of the ceiling. Rather, I am satisfied the effective cause of the collapse of the ceiling was the weight of the wet ceiling panels caused by the ingress of water over two days. In all the circumstances, on the material provided, and for the reasons stated, I am not satisfied the FSP is entitled to deny the claim relying on the policy exclusions. Further scope of works to be prepared The FSP‟s assessor provided a scope of works describing the damage to the lounge room. The scope of works is $10,855.21. The assessor also says the carpet to the lounge and dining room were soiled by the shredded fibreglass insulation. The FSP‟s policy provides if the home is damaged by an insured event then the FSP can choose whether it will repair or replace the damaged items or pay the applicant the cost of repairing or replacing the damaged items. The scope of works is nearly a year old. In those circumstances, the FSP is to prepare a further scope of works in conjunction with the applicant in relation to the damage to the home and contents caused by the storm e vent. At its discretion, the FSP can choose to repair the damage or cash settle the applicant. Case No: 428538 Determination Page 6 of 8 If the FSP cash settles, it remains necessary for the amount of the cash settlement to be agreed, based on the scope of works to be prepared by the FSP. FOS encourages the parties to this dispute to resolve any issues which might arise during that process. However, the parties can return to FOS if they are unable to resolve any issues arising from the scope of works and/or the costing of that work. 2.2 Is the applicant entitled to compensation? Compensation is awarded in certain circumstances The Terms of Reference allow FOS to direct the FSP compensate an applicant for non-financial loss where there is an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the a pplicant‟s expectation of enjoyment or peace of mind. The maximum amount of compensation for non-financial loss is $3,000. The material shows the dispute has been ongoing for nearly a year. In the meantime, the applicant, who is an elderly, disabled pensioner, has been living in his home with no repairs and with just the black plastic ceiling the FSP installed. The applicant says the FSP‟s denial of the claim was very upsetting and caused him to attend hospital for heart treatment. Having reviewed the photographs of the home, I accept the applicant‟s living conditions are very difficult and uncomfortable. I also accept the stress of the claim denial coupled with his living conditions could cause deterioration of health. $1,500 compensation is fair in all circumstances I consider it is fair in all the circumstances the FSP pay $1,500 compensation to the applicant as I am satisfied there has been an unusual degree of physical inconvenience and time taken to resolve the situation together with interference with the applicant ‟s expectation of enjoyment and peace of mind Case No: 428538 Determination Page 7 of 8 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in t he FSP‟s Notice of Response . Both the policy document and the Notice have been exchanged with the applicant. 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.4 Other relevant material considered and relied on  Parties‟ submissions, emails and all attachments to submissions including but not limited to: o Photographs. o FSP‟s assessor‟s report . Case No: 428538 Determination Page 8 of 8 o Applicant‟s roofer‟s report . o Material from the Bureau of Meteorology and the Beaufort Scale. o Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.