Home / Financial Firm (Unknown - Insurer) / Determination 428479

Determination 428479

Water ingress into basement; liability to fix membrane and drains

FirmFinancial Firm (Unknown - Insurer)
Decided2017-07-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for basement water damage and asked the FSP to fix the cause. AFCA found the FSP had accepted the resulting damage under the unknown-defect term and was not liable to fix the membrane or drains.

Under the unknown-defect policy term the insurer pays resulting damage, and the defective parts are covered only if damaged by an insured event, which was not established.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 428479 Determination Page 1 of 8 Case number: 428479 24 July 2017 1 Overview 1.1 Dispute The applicant lodged a claim with the FSP after water entered the basement of her home causing damage in April 2014. The applicant believes storm water runoff from the neighbouring property caused the damage. The FSP declined the claim because it determined the cause of damage was the incorrect installation of the waterproofing membrane in the basement wall. Pursuant to a policy term which deals with damage caused by unknown defects, the FSP offered a cash settlement for the resultant damage only in the sum of $3,530.92 and paid for the cost to pressure clean the applicant‟s stormwater drainage system in the sum of $302.50. The FSP says it is not obliged to cover the costs to rectify the unknown defects being the waterproofing membrane and the agricultural drains. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. The FSP accepted the recommendation but it was not accepted by the applicant. In the circumstances, the dispute has been referred to me for determination . 1.2 Issues and key findings Is the FSP entitled to deny the applicant’s claim? The material provided establishes the FSP has settled the claim pursuant to a policy term which deals with unknown defects. Pursuant to the policy term, the FSP has offered to pay for the resulting damage. The material provided does not establish on the balance of probabilities the unknown defective part or parts were damaged by accident or by an insured event. In these circumstances, on the information provided, the FSP is not liable to fix the neighbour‟s drainage system, the water proofing membrane or the agricultural drains. Pursuant to the FSP‟s policy, the FSP‟s liability in relation to the claim made in April 2014 is limited to payment for the resulting damage. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to take any further action in relation to the claim or the dispute. The FSP is not liable to fix the unknown defective part or parts. Case No: 428479 Determination Page 2 of 8 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. No new material provided after the recommendation The applicant rejected the recommendation and made no new submissions. The applicant said she awaited information from an expert engineer but no further new material was provided after the recommendation. 2.1 Is the FSP entitled to deny the applicant’s claim? Prima facie claim established The applicant must establish on the balance of probabilities that she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. A claim for damage to the property was made on 12 April 2014. It is not in dispute there was heavy rainfall on the three days preceding the claim. Various experts have inspected and photographed the property. It is not in dispute moisture staining was identified in the basement of the property. The FSP‟s policy responds to damage caused by storm and burst pipes, leaks and overflows. The FSP‟s letter dated 10 November 2014 notes the applicant also purchased the optional cover for accidental damage to the home. Having considered the material provided, I am satisfied on the balance of probabilities the applicant has established a prima facie claim. FSP accepted unknown defect caused the damage Once so established, the onus shifts to the FSP to prove on the balance of probabilities that a policy term or an exclusion applies if it seeks to deny or limit its liability for the claim. The FSP offered a cash settlement for the resultant damage only of $3,530.92. The FSP has also paid for the cost to pressure clea n the applicant‟s stormwater drainage system in the sum of $302.50. The FSP says this is extent of its liability to the applicant. It relies on a policy term which says if an unknown defect is the cause of damage it will pay for the resulting damage. The policy term also says if the unknown defect is also damaged by the same incident, the FSP will fix this as well. In respect of the tanking to the basement wall, the FSP says if there was defective construction or design, or if the tanking failed because of an excluded event, the FSP Case No: 428479 Determination Page 3 of 8 is not required to cover the cost to rectify it. It says it is only liable to cover the damage caused by an insured event in accordance with the terms of the policy. FSP’s expert identified three pre -existing issues The FSP relies on a number of reports including two reports from an engineer. The engineer was asked to comment on the cause of water leaching through the basement walls. The engineer inspected and photographed the property. He noted it was constructed by the applicant‟s family building business and was about six years old. A basement slab plan provided by the applicant indicated plans were submitted to the local council in May 2007. The engineer conducted a static water test to confirm surface falls. He found water flowed to the external north-west corner of the basement, water ponded against the western wall, flowed around the northern wall and ran along the edge of the concrete path and brickwork. He noted the water flowed between the concrete edge and brickwork into the underlying soils. The engineer requested the applicant provide a copy of the construction drawings and certificate of compliance for the waterproofing. The certificate of compliance was not ever provided although the applicant provided a basement slab plan to FOS. The applicant said stormwater from the neighbour‟s property caused the damage. The engineer said this was not the source of water into the basement. The engineer identified three pre-existing issues including:  the failure of the water proofing membrane  the incorrect concrete surface level of the pathway external to and next to the basement wall  the incorrect installation of agricultural drains which directed water into the building envelope. The engineer said the source of the water was from the incorrect concrete surface of the path. He said if the membrane had been correctly installed, any subterranean water would be directed to the agricultural drain and not through the basement brickwork. The engineer concluded water entered the basement because of the failure of the water proofing membrane/tanking to the basement area. The engineer said each time it rains, water would come in against the brick wall adjacent to the basement wall. The engineer did not observe a specific event to explain the cause of the failure of the water proofing membrane. He said a plausible cause of the failure was due to the incorrect installation of the membrane when it was constructed. P lumbers’ reports identify neighbour’s defective stormwater drainage system The applicant contended the damage was caused by water coming from the neighbouring property. The applicant relied on a report from a plumber who inspected the neighbour‟s below ground stormwater drainage system and found major defects. The plumber said stormwater was exiting the drainage system and Case No: 428479 Determination Page 4 of 8 because of this and poorly maintained concrete paths, during heavy rainfall, water discharged onto the applicant‟s property. The applicant also provided a detailed report and photographs from another pl umber (RQ). In addition to the FSP‟s expert reports, RQ reviewed the local council stormwater drainage plan showing the storm water drain and associated pits at the rear of the property. It is agreed between the experts there is a substantial downward slope from the north-west corner at the front of the property to the south-west corner at the rear of the property. RQ made a number of observations about the neighbour‟s property, lie of the land, drainage system, and proximity to the claimed damage, and co ncluded, as the neighbour‟s stormwater drain was blocked, the applicant received all of the neighbour‟s stormwater. RQ concluded that due to the three days rain in April 2014, this was “a final trigger” for the rain water intrusion into the applicant‟s pro perty. He said the rain water would have been building up from the neighbour‟s property. RQ disagrees with some aspects of the FSP‟s engineer‟s report. Relevantly, he disagrees about the source of the water into the basement. RQ says as the path is a 3 to 5 fall this would carry most of the water to the rear of the property. Further, RQ says the gap between the path and the wall of the house is insufficient to discharge the quantity of rainwater which is soaking through the wall. However, RQ was not able to comment on how the drains were or should have been installed. And, without seeing the water proofing membrane installation, he was unable to comment upon the membrane either. In short, it is RQ‟s opinion as the stormwater drain age in the neighbouring property is defective, when there is substantial rainfall, it flows into the applicant‟s property, finds its way below the concrete path, and discharges against the external wall and into the applicant‟s basement. Membrane expert and plumber identified membrane overwhelmed by water The applicant also provided a report from a water proofing membrane expert. This expert said he inspected the property in a dry period and in September 2016 after extensive rain. He read all the reports provided by the applicant and also viewed “approved structural drawings.” These drawings were not identified or provided. The membrane expert said water was coming into the basement of the applicant‟s property because of the drainage issues next door and the water was coming from below the concrete path. He was also of the opinion the lack of caulking where the concrete abutted the brick face was too minimal to allow the amount of water and moisture damage he saw at the applicant‟s property. However, he said: „ I believe the water ingress is also overwhelming the membrane that was applied by (the applicant‟s husband) at the time of construction. As there are no images of their Case No: 428479 Determination Page 5 of 8 membrane or any way of viewing it, I am unable to comment on its installation/application further .‟ This conclusion is not dissimilar to conclusions drawn by the plumber who inspected the property both for the applicant and the FSP. In a report dated 23 August 2014, the plumber wrote: „ We believe water discharging from the neighbouring property has entered the insured‟s property and found a weakness within the tanking membrane of the brick wall servicing the basement area. As a result, water ingress has occurred creating sighted damages to the internal brick wall of the basement area .‟ Expert opinions differ about the cause of damage The FSP‟s engineer provided a lengthy report rebutting RQ‟s opinion. He said there was inadequate testing to substantiate the claims and conclusions within the report. The FSP‟s engineer also reiterates and provides further information regarding his opinion about the incorrect surface fall of the path, the gap between the path and the wall of the house and the quality of the membrane seen in photographs taken by the plumber. Relying on this further informat ion, the FSP‟s engineer says the installation of the agricultural drain below the top of the foundations is a breach of the applicable Building Code and Australian Standards. The FSP engineer concludes: „… regardless of the source of the water, had the wat er proofing membrane been installed correctly and not failed, water from any source would not be entering the basement area and causing the said damage. The source of the water does not have any bearing on the proximate cause of the damage. ‟ Experts did not review construction drawings or compliance reports RQ‟s report lists all the documents he viewed. Like the FSP‟s engineer, he did not see the construction drawings. RQ was told when the applicant‟s husband built the house, the husband built a structural wall of double brick with an 80mm reinforced concrete infill in the cavity of the brickwork. RQ was also told there was application of two coats of bituminous waterproofing membrane to the outside of the brick wall in question and that the husband also installed an agricultural drain pipe below the top of the foundations for this wall. Similar information was passed on to the FSP‟s engineer. However, the FSP‟s engineer did not view the construction drawings and certificate of compliance for the waterproofing (despite his request). The engineer says the claimed wall structure will allow water penetration and absorption hence the need for appropriate waterproofing and drainage systems. RQ advised the applicant the engineer‟s opinion was without proof and onl y supposition. He says the statement cannot be confirmed without proper investigation. Case No: 428479 Determination Page 6 of 8 RG reiterates the exceptional rain water intrusion from the neighbouring property played a major part in the cause of the rain water intrusion and had it not occurred the minor amount of water that would have been in the vicinity of the wall would not have entered the basement. The applicant provided to FOS a document called basement slab plan and structural details. The document is date stamped received by the local council in May 2007. The applicant says the structural plan rebuts the various facts relied on by the engineer and clearly demonstrates there is no structural fault in the property. FSP not liable to fix neighbour’s stormwater system The applicant wants the FSP to stop water coming into the basement and fix the cause of damage. In submissions to FOS, she says the local council advised her the neighbours had connected their stormwater to the council stormwater pit. A plumbing certificate was to be provided. The issue to be decided is the effective or dominant cause of the damage to the insured property. The applicant contends the effective cause of the damage is the inadequate stormwater provisions made by their neighbours. The FSP says wherever the water is coming from, had the water proofing membrane been installed properly, water would not have entered the basement and caused the damage. The FSP is not obliged pursuant to any policy term to fix the neighbour‟s stormwater system. In any event, the material provided establishes the neighbours have undertaken work to their stormwater system as required by the local council. Material does not establish insured event damaged the membrane or drain The FSP has accepted the defect which it says was the cause of the damage was unknown and therefore has offered to pay for the resulting damage. The FSP‟s policy provides if the unknown defective part is also damaged by the same incident, it will fix this as well. In this dispute, the unknown defective part or parts referred to by the FSP are the waterproof membrane and the agricultural drain. On the material provided, I am not satisfied the water proofing membrane or agricultural drain were accidentally damaged or damaged by an insured event. Rather, even the applicant‟s experts say the water ingress is overwhelming the membrane and therefore causing damage in the basement, none of the applicant‟s experts say any insured event has damaged the membrane or the agricultural drain. The applicant‟s experts make the point the FSP‟s engineer cannot comment on the installation or application of the membrane as there are no images of it or it cannot be viewed. Both RQ and the applicant contend the FSP‟s engineer‟s opinion about the cause of the water ingress being the defective membrane is only supposition. Case No: 428479 Determination Page 7 of 8 However, the engineer specifically comments on a photograph taken by the plumber which shows the membrane applied to the brickwork and says (for the reasons stated in the engineer‟s second report) the photograph supports his contention that the water proofing membrane is inadequate. Moreover, the FSP‟s engineer asked the applicant to provide relevant documentation, but this material was not provided to him. A basement slab plan has been provided to FOS. Although the plan describes the membrane, no material was provided about how the plan was actually implemented and/or how the membrane was actually applied. FSP not liable to indemnify applicant for anything more than resulting damage Having considered the material provided, I am satisfied the FSP has complied with the policy terms and conditions. The FSP has accepted an unknown defect was the cause of the damage. It has accepted it will pay for the resulting damage. Although the policy provides if the unknown defective part is also damaged by the same incident, the FSP will fix this as well, the material provided does not establish the membrane or the agricultural drains were damaged by accident or by any insured event. In the circumstances, on the material provided, the FSP is not obliged to fix the membrane or the agricultural drains. The FSP‟s expert also identified the concrete surface level of the path next to the basement wall was incorrect. I am not satisfied this is an unknown defect. But in any event, whatever the role of the concrete surface level of the path, the FSP has accepted it is liable for the resulting damage in the basement. In short, even if it were accepted the neighbour‟s stormwater drains were defective and inundate d the applicant‟s property in April 2014, the FSP has pursuant to a policy term which deals with unknown defects. Pursuant to the policy term, the FSP has accepted it will pay for the resulting damage. The material provided does not establish the unknown defective parts were damaged by accident, by the rain event in 2014 or by the neighbour‟s leaking pipes. In the circumstances, on the information provided, and for the reasons stated, pursuant to the claim made in April 2014, the FSP is not liable to indemnify the applicant for anything further over and above payment of the resulting damage. Case No: 428479 Determination Page 8 of 8 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the m aterial provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.3 Relevant policy extracts The relevant policy extracts are referred to in correspondence between the parties and in the FSP‟s Notice of Response dated 3 March 2016. Both the policy document and the Notice have been exchanged with the applicant. 3.4 Other relevant material considered and relied on  Parties‟ submissions including emails, photographs, reports, basement slab plan and all attachm ents to submissions.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.