Home / Financial Firm (Unknown - Insurer) / Determination 428463
Determination 428463
Offer limited to 80% of building repair costs after burst pipe
Summary
After a burst water pipe damaged the applicants' home, the FSP accepted liability but limited its payment to 80% of building repair costs, citing possible earth movement. AFCA found the FSP had not established an exclusion, required the FSP to repair the property (or cash settle at the applicants' choice) and awarded $1,500 for non-financial loss.
The FSP bears the onus of establishing an exclusion, and the engineering evidence did not establish that earth movement reduced its liability.
Subjects and remedies
home or building damagepay non financial lossrepair or rectify
Text of the determination
Determination
Case No: 428463 Determination Page 1 of 5
Case number: 428463 23 January 2017
1 Overview
1.1 Dispute
The applicants lodged a claim on or about 2 September 2015 on their Home Building
Insurance policy for damage to the property as a result of a burst water pipe.
The FSP accepted liability for the damage but considered there was evidence of
previous movement not related to the leaking pipe and offered to settle the claim for
50% of the costs of repairs. After obtaining a further engineer ’ s report the FSP
increased the offer to 80% of the cost of the building repairs.
The applicants dispute the FSP’s decision and maintain they are entitled to 100% of
the costs of repairs. They also seek compensation for non-financial loss.
1.2 Issues and key findings
Has the applicant established a claim within the terms of the policy?
The applicants have established a claim within the terms of the policy. There is no
dispute that the applicants’ property was damaged as a result of the escape of liquid
which is an insured event under the terms of the policy.
Is the FSP entitled to limit its liability?
The FSP has the onus of establishing the application of an exclusion under the terms
of the policy if it is to limit its liability. The Panel is not satisfied that the FSP has
established a cause of damage which is excluded under the terms of the policy. The
FSP is not entitled to limit its liability.
Are the applicants entitled to compensation for non-financial loss?
The Panel is satisfied the applicants have experienced an unusual degree of
inconvenience and are entitled to compensation for non-financial loss of $1500.
1.3 Determination
This determination is in favour of the applicants.
The FSP is liable to repair the applicants’ property in accordance with the t erms and
conditions of the policy as set out in Section 2.2 of this determination.
Further, the FSP is to pay the applicants $1,500 by way of compensation for non-
financial loss pursuant to paragraph 9.3 of the Terms of Reference.
Case No: 428463 Determination Page 2 of 5
Case No: 428463 Determination Page 3 of 5
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities of the issues involved this dispute has been referred to a
Panel for determination.
The Panel has taken into account all of the information exchanged and is based on
what is fair in the circumstances, having regard to the relevant legal principles, terms
of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 The applicant has established a claim within the terms of the policy
The applicants’ home building policy provides cover for a number of insured events
including the escape of liquid from a fixed pipe.
When the applicant ’s lodged their claim on 2 September 2015 they notified the FSP
that there was a leaking pipe in the bathroom and water was coming up through the
floor.
The plumber subsequently contacted the FSP to advise it they needed to get a
restoration company out to the property to dry the carpets. The plumber sent a report
with extensive photos of the damage to the FSP.
According to the claim notes instead of actioning the matter on 3 September 2015
the FSP cancelled the assessment as its Case Manager had failed to upload the
report or quotes.
A review did not occur until 7 September 2015. The FSP were made aware that there
was rising damp and the possibility of mould developing. It was not until 8 September
2015 that an assessing firm was appointed.
The assessor’s report from CL dated 16 September 2015 whilst acknowledging
liability with respect to the replacement of carpets and associated damage
recommended the appointment of a structural engineer to determine whether
movement in the house was due to the leaking pipe.
The FSP subsequently arranged for an engineer. The engineer’s report from MC S
dated 22 October 2015 concluded that the structural damage to the applicants ’
building was due to “ differential stumps ” that could be due to either settlement as a
result of deterioration of the original stumps or from the relevelling the floor during a
restumping process or differential movement in the foundation caused by variation in
moisture content. MCS considered there was no way of determining the actual
cause.
Case No: 428463 Determination Page 4 of 5
The Panel is satisfied that the report establishes a prima facie claim for damage
sustained as a result of the water leak as is accepted by the FSP. The issue is not
whether the applicants have established a claim under the policy but whether the
FSP can establish an exclusion applies to limit its liability.
2.2 The FSP is not entitled to limit its liability
The FSP relies upon the exclusions contained in the policy relating to erosion,
vibration, subsidence, landslide, mudslide, collapse, shrinkage or any earth
movement as well as exclusions relating to wear and tear, rust, fading, rising damp,
mould, mildew, corrosion etc. If the FSP is to succeed then it must establish the
application of these exclusions on the balance of probabilities
In the FSP’s initial decision letter of 8 January 2016 it advised the applicant s that it
would accept 50% of the liability for the cost to repair.
In doing so the FSP relied on the report from MCS that there had been previous
repairs and restumping causing movement.
The Panel notes that at best the MCS report considers the damage could be due
either to the settlement as a result of the deterioration of the original stumps or from
the relevelling of the floor or it could be due to the differential movement in the
foundations caused by the variation in moisture content. MCS concedes there is no
way of determining the actual cause.
This MCS report maintains there is evidence that there had been restumping, most
likely within the 10 years the applicants have lived at the property. Other than a
photograph there is no other information provided to support this occurred during the
applicant’s ownership of the property. The applicants maintain there has been no
repairs or restumping.
In the later report from FMG on which the FSP based the offer of 80% of the cost of
repairs the Panel notes FMG identified a general pattern of relative heave or lifting of
the floor.
The applicants provided FMG with a copy of their quarterly water bill which according
to FMG revealed that the burst water supply pipe was leaking water under the house
and at least 630,000 litres of water escaped into the subfloor soils at that time; given
the high reactivity of the soils, FMG concluded that the leaking pipe did cause or
significantly contribute to the observed recent movement and damage through the
house.
FMG also considered given the age and construction of the house some of the
observed movement could be due to a combination of factors over a long period of
time. The Panel agrees that this is possible given the age of the house. The Panel is
not satisfied that the report is sufficient to establish that the liability for the building
repairs should be reduced.
On balance the Panel accepts the proximate cause for the damage is the leaking
water pipe.
Case No: 428463 Determination Page 5 of 5
Settlement of the claim
The policy provides the FSP with a discretion whether to repair, rebuild or cash settle
the applicants for the cost of repairing or rebuilding. Such discretion must be
exercised reasonably and consistent with the principles of utmost good faith. The
FSP must consider the circumstances of the loss and the capacity of the applicants .
The FSP should not transfer the risk associated with the repairs or repair process to
the applicants by cash settling a claim unless it makes allowance for such risk.
The Panel acknowledges that the FSP was unable to complete repairs to the
applicants ’ property until such time as the soil had dried and it is able to determine
the scope of works. In July 2016 an engineer confirmed there was no way to speed
up the drying process and the soil would need to dry naturally. In August 2016 the
FSP observed that the subsoil was still damp and there was mould in the house.
Temporary accommodation was arranged whilst the mould remediation treatment
was completed. As late as December 2016 the applicants had still not returned to the
home as the flooring had to be reinstated following the mould remediation.
The Panel determines within 14 days of acceptance of this determination the FSP
should appoint its engineer to re attend the property to assess the state of the soil. If
the soil has dried out sufficiently the FSP should arrange for a scope of works to
repair the property. The scope of works should be costed and the choice given to the
applicants whether they wish to cash settle the claim or not.
Should the applicants choose not to cash settle the claim, then the Panel is satisfied
that the FSP should complete the repairs in accordance with the scope of works.
2.3 The applicant is entitled to compensation for non-financial loss
Under paragraph 9.3 of the Terms of Reference compensation of up to $3,000 may
be awarded for non-financial loss where an applicant suffers an unusual degree of
inconvenience or delay or loss of enjoyment or peace of mind as a result of pain.
The panel accepts that part of the inconvenience and delay is due to the issues with
the subsoil being damp. This is not the FSP’s fault. The Panel notes however that
there have been delays in responding to the applicants, that the second engineer
FMG was not appointed until after the dispute was lodged with the service and that
the FSP did not act on the mould remediation until September 2016. The remediation
had not been completed by December 2016.
In the Panel’s view the applicants have suffered an unusual degree of inconvenie nce
and loss of enjoyment as result of delays in the claims process. The Panel
determines the FSP pay the applicant’ s $1,500 compensation for non-financial loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.