Determination 427974

Ceiling collapse and roof framing damage claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2017-02-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's ceiling collapsed and the FSP denied the claim, attributing it to long-term subsidence and roof framing failure. AFCA upheld the denial of the roof and ceiling claim but required the FSP to repair carpet and ceiling damage caused by its make-safe contractor.

Damage from long-term subsidence and deterioration is not an insured event under the policy, and the proximate cause of the ceiling collapse was not a covered storm event.

Issues

Subjects and remedies

home or building damagerepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 427974 Determination Page 1 of 6 Case number: 427974 6 January 2017 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy after the ceiling of his open plan living area collapsed in November 2015. The applicant considers the collapse occurred as a result of water entry during a storm. During the course of assessing the claim, the FSP‟s engineer (JH) identified structural issues with the roof at the property. JH advised that these iss ues had arisen as a result of long-term subsidence of the concrete footings at the property, together with the inadequate construction of the roof framing . The FSP denied the applicant‟s claim on the basis that the collapse of the ceiling was not caused by a single storm at the property (or by any other event insured against under the policy). Based on JH‟s advice, the FSP says the collapse occurred due to the longstanding issues affecting the roof framing. The applicant disputes the FSP‟ s denial of his claim. He also seeks compensation for additional damage to the property caused by the FSP‟s contractors while undertaking make safe repairs. 1.2 Issues and key findings Is the FSP liable for the claimed damage? The FSP is not liable for the damage to the roof framing as this damage was caused by long-term subsidence, together with the manner in which the roof framework was constructed. Damage caused in this manner is not covered under the policy. The FSP is not liable for damage resulting from the collapse of the ceiling as, on the balance of probabilities, this damage occurred as a consequence of the failure of the roof framing. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not liable for the damage to the applicant‟s roof, ceiling or contents items. However, the FSP is required to indemnify the applicant for the damage to the carpet and the remainder of the ceiling caused by its make safe contractor (as outlined in section 2.1 below). Case No: 427974 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP liable for the claimed damage? Policy provide cover for insured events subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant ‟ s policy provides cover for damage caused by the events listed in the policy (including the insured event of storm), subject to the conditions and exclusions set out in the policy. The policy states that an „insured event‟ is a single event, accident or occurrence which the policyholder did not intend or expect to happen. The policy contains general exclusions for loss or damage caused by:  earth movement (other than landslide or subsidence in certain specified circumstances); or  wear, tear, corrosion or gradual deterioration. The FSP does not dispute that damage to the applicant‟s property occurred as a result of the ceiling collapse. However, the FSP will only be liable for the claimed damage if the proximate cause of the damage (that is, the real, effective or dominant cause) was one of the events insured against under the policy. Damage to roof framing was not caused by an insured event After the applicant lodged his claim, the FSP appointed a builder (HR) to assess the claim and undertake repairs. However, on attending the property, HR advised that he was unable to deal with the claim, due to the extent of the damage to the timber roof framing. The FSP‟s claim notes reflect that HR advised that the roof line main timber to the entire house was sagging. The replacement builder (AB) appointed by the FSP confirmed that there were major structural issues with the roof framing, which had resulted in the entire southern end of the roof dropping by approximately 50 millimetres. AB recommended that an engineer be appointed to determine the cause of these issues. The FSP‟s engineer (JH) concluded that the failure of the roof framing had occurred as a result of long-term subsidence of the concrete stumps supporting the house, together with inadequate construction of the roofing framework. In particular, JH advised that: Case No: 427974 Determination Page 3 of 6  subsidence of the concrete stumps had been occurring over a number of years, which had caused the internal wall supporting the ridge strut to drop;  the subsidence of the wall in turn caused the ridge strut to drop, resulting in the rafters pushing the top of the external front wall outwards; and  the movement of the external front wall, compounded by the inadequate bearing of the combined strutting and hanging beam, ultimately caused this beam to detach. I consider that, as an engineer, JH is appropriately qualified to determine the cause of the damage to the roof at the applicant‟s property. Having carefully reviewed JH‟s report, I consider it provides a logical and rational explanation as to how the damage occurred, which is consistent with the observed facts. JH‟s report clearly outlines the mechanism by which the damage occurred and includes a number of photographs which support his conclusions. Among other matters, these photographs confirm that several strutting beams had twisted, the combined strutting and hanging beam had detached from its support (and a second beam was on the verge of collapse) and the hip rafter had split. Floor level surveys carried out by JH showed a fall of approximately 24 millimetres from the front of the house to the internal wall supporting the ridge strut. This supports JH‟s conclusion that subsidence had occurred in this area. FSP is not liable for damage to roof framing The applicant has not directly disputed JH‟s findings as to the cause of damage to the roof frami ng, although he has questioned several specific aspects of JH‟s report. The applicant has also queried whether, to the extent that the damage was caused by subsidence, it would be covered under the policy. As outlined above, the policy only provides cover for damage caused by one or more of the specific insured events listed in the policy. In the case of subsidence, cover is only provided for damage caused by subsidence which occurs within 72 hours of (and directly because of) a storm, flood, earthquake or explosion. In his report, JH confirmed that the subsidence of the concrete footings which led to the failure of the roof framing occurred over an extended period of time. JH expressly noted that there was n o evidence of any “recent” movement to the concrete stumps (as would be expected had the damage been caused by a single storm or other insured event). On this basis, the FSP is not liable for the damage to the roof framing. Parties disagree as to cause of ceiling collapse The FSP‟s engineer (JH) concluded that the collapse of the ceiling in the open plan living area had occurred as a further consequence of the damage to the roof framing outlined above. Case No: 427974 Determination Page 4 of 6 In his report, JH advised that the detachment of the combined hanging and strutting beam led to a loss of support for the ceiling joists which caused them to deflect, resulting in the collapse of the ceiling. JH ‟s report includes a photograph which shows a significant variation between adjacent ceiling joists, when measured with a straight edge. This variation was evident in the ceilings at both ends of the house. The applicant disputes JH‟s findings as to the cause of the damage to the ceiling. He says the FSP has unreasonably focussed on the structural issues with the roof, whereas the collapse of the ceiling was a separate and unrelated issue caused by water entry during a storm. The applicant has provided a brief report from the builder (MR) he engaged to repair the ceiling. In his report, MR states that:  the damage to the ceiling occurred as a result of water damage; and  there was no evidence of recent movement in the roof structure or cracking to the roof tiles. MR‟s report does not provide any further explanation or include any other information (such as photographs) in support of his conclusion. Nor does MR address the findings of the FSP‟s engineer (JH) regarding the observed damage to the roof framing, as shown in the photographs included in JH‟s report. FSP is not liable for damage caused by ceiling collapse Having carefully reviewed the available information, I consider that the collapse of the ceiling occurred in circumstances which are not covered under the policy. The explanation provided by the FSP‟s engineer (JH) that the collapse of the ce iling occurred due to a loss of support for the ceiling joists (as a consequence of the failure of the roof framing) is consistent with the observed facts. The report provided by the applicant‟s builder (MR) does not contain sufficient information to refut e JH‟s findings as to the cause of the damage. On this basis, I am satisfied that the collapse of the ceiling was caused in the manner outlined by JH. Accordingly, the FSP is not liable for the resulting damage because the collapse was not caused by a storm (or by any other event insured against under the policy). While the FSP‟s builder (AB) confirmed there was evidence of water entry to the timber roof frame members directly below the ridge capping tiles, he considered that the water entry issues were “minor” and had not caused the collapse of the ceiling. The applicant says that the first builder who attended the property advised him that the ceiling had collapsed due to water damage. However, assuming that the applicant is referring to HR (who arranged the make safe), then his recollection is inconsistent with the FSP‟s claim notes, which reflect that HR advised that “the entire house ceiling was sagging” due to the failure of the roof framing. Case No: 427974 Determination Page 5 of 6 The applicant has been unable to identify exactly when the relevant water entry occurred. Meteorological records confirm there was no storm on the date the ceiling collapsed (or during the prior week). While the applicant recalls finding a damp patch on the carpet on his return from holidays in early October 2015, it is not clear that water entry on or around this date would have led to the collapse of the ceiling some eight weeks later. In any event, even if the collapse was caused by water entry during a single storm event, the available information indicates that the proximate cause of the damage was the deteriorated condition of the roof. The FSP‟s builder (AB) reported that the areas of water entry under the ridge capping tiles had occurred as a result of the breakdown of the pointing to the capping tiles. AB‟s report includes a close -up, colour photograph which clearly shows the deteriorated condition of the tiles with missing sections of the pointing clearly evident. On this basis, I consider that, even if the collapse of the ceiling occurred as a result of water damage, the proximate cause of the collapse was the gradual deterioration of the ridge capping tiles (whether in the ordinary course of events and/or as a result of the subsidence and other movement issues identified by JH). Damage caused in this manner is not covered under the policy. For the reasons outlined above, the FSP is not liable for the damage to the applicant‟s home and contents resulting from the collapse of the ceiling. FSP is required to rectify damage caused by its contractors The applicant says the FSP‟s contractors placed a greasy board on the carpet in the course of installing props to the roof framework as part of the make safe repairs. The applicants also wants the FSP to repair the holes which were cut in the undamaged section of the ceiling so the props could be installed. The FSP has confirmed it is willing to repair the ceiling and restore the damaged carpet. Accordingly, the FSP should arrange for these repairs (or cash settle the applicant for the reasonable cost of doing so). Case No: 427974 Determination Page 6 of 6 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a FOS recommendation issued on 7 June 2016. The recommendation was rejected by the applicant. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.