Home / Financial Firm (Unknown - Insurer) / Determination 427974
Determination 427974
Ceiling collapse and roof framing damage claim declined
Summary
The applicant's ceiling collapsed and the FSP denied the claim, attributing it to long-term subsidence and roof framing failure. AFCA upheld the denial of the roof and ceiling claim but required the FSP to repair carpet and ceiling damage caused by its make-safe contractor.
Damage from long-term subsidence and deterioration is not an insured event under the policy, and the proximate cause of the ceiling collapse was not a covered storm event.
Issues
- Claim denial primary · not upheld
“the FSP is not liable for the damage to the applicant's roof, ceiling or contents items”
- Repairs or contractors secondary · upheld
“the FSP is required to indemnify the applicant for the damage to the carpet and the remainder of the ceiling caused by its make safe contractor”
Subjects and remedies
home or building damagerepair or rectify
Text of the determination
Determination
Case No: 427974 Determination Page 1 of 6
Case number: 427974 6 January 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy after the ceiling of his
open plan living area collapsed in November 2015. The applicant considers the
collapse occurred as a result of water entry during a storm.
During the course of assessing the claim, the FSP‟s engineer (JH) identified
structural issues with the roof at the property. JH advised that these iss ues had
arisen as a result of long-term subsidence of the concrete footings at the property,
together with the inadequate construction of the roof framing .
The FSP denied the applicant‟s claim on the basis that the collapse of the ceiling was
not caused by a single storm at the property (or by any other event insured against
under the policy). Based on JH‟s advice, the FSP says the collapse occurred due to
the longstanding issues affecting the roof framing.
The applicant disputes the FSP‟ s denial of his claim. He also seeks compensation for
additional damage to the property caused by the FSP‟s contractors while undertaking
make safe repairs.
1.2 Issues and key findings
Is the FSP liable for the claimed damage?
The FSP is not liable for the damage to the roof framing as this damage was caused
by long-term subsidence, together with the manner in which the roof framework was
constructed. Damage caused in this manner is not covered under the policy.
The FSP is not liable for damage resulting from the collapse of the ceiling as, on the
balance of probabilities, this damage occurred as a consequence of the failure of the
roof framing.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is not liable for the damage to the applicant‟s roof, ceiling or contents items.
However, the FSP is required to indemnify the applicant for the damage to the carpet
and the remainder of the ceiling caused by its make safe contractor (as outlined in
section 2.1 below).
Case No: 427974 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP liable for the claimed damage?
Policy provide cover for insured events subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant ‟ s policy provides cover for damage caused by the events listed in the
policy (including the insured event of storm), subject to the conditions and exclusions
set out in the policy.
The policy states that an „insured event‟ is a single event, accident or occurrence
which the policyholder did not intend or expect to happen.
The policy contains general exclusions for loss or damage caused by:
earth movement (other than landslide or subsidence in certain specified
circumstances); or
wear, tear, corrosion or gradual deterioration.
The FSP does not dispute that damage to the applicant‟s property occurred as a
result of the ceiling collapse.
However, the FSP will only be liable for the claimed damage if the proximate cause
of the damage (that is, the real, effective or dominant cause) was one of the events
insured against under the policy.
Damage to roof framing was not caused by an insured event
After the applicant lodged his claim, the FSP appointed a builder (HR) to assess the
claim and undertake repairs.
However, on attending the property, HR advised that he was unable to deal with the
claim, due to the extent of the damage to the timber roof framing. The FSP‟s claim
notes reflect that HR advised that the roof line main timber to the entire house was
sagging.
The replacement builder (AB) appointed by the FSP confirmed that there were major
structural issues with the roof framing, which had resulted in the entire southern end
of the roof dropping by approximately 50 millimetres. AB recommended that an
engineer be appointed to determine the cause of these issues.
The FSP‟s engineer (JH) concluded that the failure of the roof framing had occurred
as a result of long-term subsidence of the concrete stumps supporting the house,
together with inadequate construction of the roofing framework. In particular, JH
advised that:
Case No: 427974 Determination Page 3 of 6
subsidence of the concrete stumps had been occurring over a number of years,
which had caused the internal wall supporting the ridge strut to drop;
the subsidence of the wall in turn caused the ridge strut to drop, resulting in the
rafters pushing the top of the external front wall outwards; and
the movement of the external front wall, compounded by the inadequate bearing
of the combined strutting and hanging beam, ultimately caused this beam to
detach.
I consider that, as an engineer, JH is appropriately qualified to determine the cause
of the damage to the roof at the applicant‟s property. Having carefully reviewed JH‟s
report, I consider it provides a logical and rational explanation as to how the damage
occurred, which is consistent with the observed facts.
JH‟s report clearly outlines the mechanism by which the damage occurred and
includes a number of photographs which support his conclusions.
Among other matters, these photographs confirm that several strutting beams had
twisted, the combined strutting and hanging beam had detached from its support
(and a second beam was on the verge of collapse) and the hip rafter had split.
Floor level surveys carried out by JH showed a fall of approximately 24 millimetres
from the front of the house to the internal wall supporting the ridge strut. This
supports JH‟s conclusion that subsidence had occurred in this area.
FSP is not liable for damage to roof framing
The applicant has not directly disputed JH‟s findings as to the cause of damage to
the roof frami ng, although he has questioned several specific aspects of JH‟s report.
The applicant has also queried whether, to the extent that the damage was caused
by subsidence, it would be covered under the policy.
As outlined above, the policy only provides cover for damage caused by one or more
of the specific insured events listed in the policy. In the case of subsidence, cover is
only provided for damage caused by subsidence which occurs within 72 hours of
(and directly because of) a storm, flood, earthquake or explosion.
In his report, JH confirmed that the subsidence of the concrete footings which led to
the failure of the roof framing occurred over an extended period of time. JH expressly
noted that there was n o evidence of any “recent” movement to the concrete stumps
(as would be expected had the damage been caused by a single storm or other
insured event).
On this basis, the FSP is not liable for the damage to the roof framing.
Parties disagree as to cause of ceiling collapse
The FSP‟s engineer (JH) concluded that the collapse of the ceiling in the open plan
living area had occurred as a further consequence of the damage to the roof framing
outlined above.
Case No: 427974 Determination Page 4 of 6
In his report, JH advised that the detachment of the combined hanging and strutting
beam led to a loss of support for the ceiling joists which caused them to deflect,
resulting in the collapse of the ceiling.
JH ‟s report includes a photograph which shows a significant variation between
adjacent ceiling joists, when measured with a straight edge. This variation was
evident in the ceilings at both ends of the house.
The applicant disputes JH‟s findings as to the cause of the damage to the ceiling. He
says the FSP has unreasonably focussed on the structural issues with the roof,
whereas the collapse of the ceiling was a separate and unrelated issue caused by
water entry during a storm.
The applicant has provided a brief report from the builder (MR) he engaged to repair
the ceiling. In his report, MR states that:
the damage to the ceiling occurred as a result of water damage; and
there was no evidence of recent movement in the roof structure or cracking to
the roof tiles.
MR‟s report does not provide any further explanation or include any other information
(such as photographs) in support of his conclusion. Nor does MR address the
findings of the FSP‟s engineer (JH) regarding the observed damage to the roof
framing, as shown in the photographs included in JH‟s report.
FSP is not liable for damage caused by ceiling collapse
Having carefully reviewed the available information, I consider that the collapse of the
ceiling occurred in circumstances which are not covered under the policy.
The explanation provided by the FSP‟s engineer (JH) that the collapse of the ce iling
occurred due to a loss of support for the ceiling joists (as a consequence of the
failure of the roof framing) is consistent with the observed facts.
The report provided by the applicant‟s builder (MR) does not contain sufficient
information to refut e JH‟s findings as to the cause of the damage.
On this basis, I am satisfied that the collapse of the ceiling was caused in the manner
outlined by JH. Accordingly, the FSP is not liable for the resulting damage because
the collapse was not caused by a storm (or by any other event insured against under
the policy).
While the FSP‟s builder (AB) confirmed there was evidence of water entry to the
timber roof frame members directly below the ridge capping tiles, he considered that
the water entry issues were “minor” and had not caused the collapse of the ceiling.
The applicant says that the first builder who attended the property advised him that
the ceiling had collapsed due to water damage.
However, assuming that the applicant is referring to HR (who arranged the make
safe), then his recollection is inconsistent with the FSP‟s claim notes, which reflect
that HR advised that “the entire house ceiling was sagging” due to the failure of the
roof framing.
Case No: 427974 Determination Page 5 of 6
The applicant has been unable to identify exactly when the relevant water entry
occurred. Meteorological records confirm there was no storm on the date the ceiling
collapsed (or during the prior week).
While the applicant recalls finding a damp patch on the carpet on his return from
holidays in early October 2015, it is not clear that water entry on or around this date
would have led to the collapse of the ceiling some eight weeks later.
In any event, even if the collapse was caused by water entry during a single storm
event, the available information indicates that the proximate cause of the damage
was the deteriorated condition of the roof.
The FSP‟s builder (AB) reported that the areas of water entry under the ridge capping
tiles had occurred as a result of the breakdown of the pointing to the capping tiles.
AB‟s report includes a close -up, colour photograph which clearly shows the
deteriorated condition of the tiles with missing sections of the pointing clearly evident.
On this basis, I consider that, even if the collapse of the ceiling occurred as a result
of water damage, the proximate cause of the collapse was the gradual deterioration
of the ridge capping tiles (whether in the ordinary course of events and/or as a result
of the subsidence and other movement issues identified by JH). Damage caused in
this manner is not covered under the policy.
For the reasons outlined above, the FSP is not liable for the damage to the
applicant‟s home and contents resulting from the collapse of the ceiling.
FSP is required to rectify damage caused by its contractors
The applicant says the FSP‟s contractors placed a greasy board on the carpet in the
course of installing props to the roof framework as part of the make safe repairs.
The applicants also wants the FSP to repair the holes which were cut in the
undamaged section of the ceiling so the props could be installed.
The FSP has confirmed it is willing to repair the ceiling and restore the damaged
carpet. Accordingly, the FSP should arrange for these repairs (or cash settle the
applicant for the reasonable cost of doing so).
Case No: 427974 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a FOS recommendation issued on 7 June 2016. The
recommendation was rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only