Text of the determination
Determination
Case No: 427697 Determination Page 1 of 9
Case number: 427697 24 October 2016
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his Easy Farm Business
Insurance Policy, held with the financial service provider (FSP), following damage at
the applicant’s home as a result of a weather event.
The FSP partially accepted the applicant’s claim but has denied the balance on the
basis that the loss and damage was caused by a flood event which is specifically
excluded under the terms and conditions of the policy.
1.2 Issues and key findings
Is the FSP entitled to deny the balance of the claim on the basis of the
exclusion within the policy?
The FSP has not established it is entitled to deny the balance of the applicant’s claim
on the basis of an exclusion within the policy.
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to meet the applicant’s claim under the ter ms and conditions of
the policy and in accordance with this determination.
The FSP is required to pay interest on any cash settlement amount in accordance
with the Insurance Contracts Act 1984 (the Act), from the date of denial of the claim
to the date of the cash settlement.
Case No: 427697 Determination Page 2 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
On 14 October 2016 the Panel Chair Ombudsman met with the applicant on site. The
FSP declined the invitation to attend this meeting.
The Panel has used the information obtained at this meeting together with all of the
information exchanged, in the preparation of this determination.
2.1 Is the FSP entitled to rely upon exclusions with the policy to deny
the claim?
Circumstances of the loss
The applicant says that as a result of an extreme weather event in April 2015, there
was damage to the home and contents within the home, damage to the contents
within a shed at the rear of the home, damage to an air conditioning unit located
beside the home and damage to fences surrounding the property.
The FSP has accepted the claim for damage within the shed caused by inundation to
a level of 100 millimetres. The FSP has also accepted the applicant’s claim for food
spoilage and paid the applicant $1,000, the maximum allowable under the policy.
The FSP has denied the balance of the applicant’s claim on the basis of the
exclusions within the policy.
Coverage of the policy
The coverage provided by the applicant’s Easy Farm Business Insurance Policy is
detailed within the Product Disclosure Statement (PDS). The coverage provided is in
respect to defined events, which are detailed within the policy. This means that not all
loss and damage is covered, but rather only loss and damage ca used by a defined
event detailed within the policy.
Section 1 of the policy is relevant for the applicant’s claim in respect to loss and
damage to the shed and its contents, to machinery and to fences.
Section 4 of the policy is relevant to the home, conte nts of the home and the air
conditioner.
Both sections of the policy provide cover for the defined event of Storm or Rainwater
and the PDS details as follows:
Case No: 427697 Determination Page 3 of 9
…..
The coverage provided by the policy is subject to general exclusions which are also
detailed within the PDS.
The PDS details:
Case No: 427697 Determination Page 4 of 9
…..
The panel is satisfied that the flood exclusion applies to both to Section 1 and
Section 4 of the policy and the applicant acknowledges and accepts that the policy
excludes cover in regard to loss and damage caused by flood.
The Supplementary Product Disclosure Statement also carries a General Definition
for flood:
EASYFARM BUSINESS INSURANCE SUPPLEMENTARY PRODUCT DISCLOSURE
STATEMENT
This Supplement ary Product Disclosure Statement, Supplementary (PDS) should be read with the
Easy Farm Business Insurance Product Disclosure Statement and Policy Booklet (PDS), Edition 1
dated 1st June 2003.
These documents together with your current Certificate of Ins urance make up the terms and
conditions of your insurance contract with us. Your current Certificate of Insurance outlines the cover
you have chosen.
Supplementary PDS 1.3
This Supplementary PDS Edi tion 1.3 will apply to all Policies with a commencement date on or
after 19/07/2013 or with a renewal effective date on or after 19/07/2013.
We have made changes to the definition of Flood in your PDS.
General Definitions "Flood" (Page 6 of the PDS)
The words that appear in the Meaning column for "Flood" have been deleted and replaced with the
following:
Flood means the covering of normally dry land by water that has escaped or been released from the
normal confines of any of the following:
(a) a lake (whether or not it has been altered or modified);
(b) a river (whether or not it has been altered or modified);
(c) a creek (whether or not it has been altered or modifie d);
(d) another natural watercourse (whether or not it has been altered or modified);
(e) a reservoir;
(f) a canal;
(g) a dam.
Case No: 427697 Determination Page 5 of 9
It is accepted insurance law that the applicant carries the initial onus to establish that
he has suffered loss and damage which is covered by the terms and conditions of the
policy.
The FSP’s onus is to show the basis on which it otherwise seeks to deny the claim,
including the application of the policy exclusion for flood; however, this only arises
once the applicant has established that the loss and damage claimed is covered by
the terms and conditions of the policy.
On the basis of the material exchanged the panel is satisfied that the applicant has
established a claim under the terms and conditions of the policy for loss and damage
as a result of the defined event of Storm or Rainwater.
This is particularly so, given the evidence from the FSP’s hydrologist to the effect that
there would have been some storm water runoff and given that the FSP accepted the
applicant’s claim in respect to loss and damage as a result of inundation to the level
of 100 millimetres within the shed.
As a result the panel is satisfied that the onus shifts to the FSP to establish the
application of the policy exclusion of flood, to deny the balance of t he applicant’s
claim.
Weather event
On the basis of the exchanged material the panel is satisfied that the applicant’s
property was subject to a very significant weather event.
The exchanged material confirms that the applicant was home during the entire
period of the loss and damage at the property on 21 April 2015.
The applicant says that on this morning water first entered the property at
approximately 9.30am and came from a north easterly direction and that the source
of the water was the hills above the property.
During this morning the applicant says that his rain gauge filled at least twice and he
recorded over 200 millimetres of rainfall prior to 7.00am, with a further 200
millimetres after this time.
The FSP, via its hydrology report noted that the recorded rainfall data for that location
showed that the peak intensity rainfall between 7.00am and 10.00am on 21 April
2015, was significantly greater than a 100 year Average Recurrent Interval (ARI)
event.
Significantly, the panel notes that the applica nt was onsite at the time and noted the
inundation to the home as having occurred during this peak period, namely at
9.30am.
Further, the assessor who attended the property soon after the storm event, on
behalf of the FSP, reported:
‘The property is situated on the lower edge of a series of hill slopes and during the
violent wind storm and torrential rains water cascaded down the hills and onto the
insured’s property. An excessive volume of water mixed with gravel and silt has
Case No: 427697 Determination Page 6 of 9
washed into the insured’s prop erty and damaged everything from the approached
roadway into the house.’
On the basis of the exchanged material the panel is satisfied that the property was
subject to a significant and severe weather event, resulting in loss and damage.
Notwithstanding the exchanged material referred to above, the FSP maintains the
applicant has been unable to provide any compelling information which determines
the source of the water that inundated the property. In other words, whether the
water came from the policy excluded source of flood, or the policy included source of
storm water run-off.
The FSP maintains that the only available expert investigation establishes there is no
conclusive evidence with which to determine the portion of flow that was directed
towards the dwelling from each potential source (as above), or to suggest that one
mechanism had more effect over the other.
At the outset, the panel is satisfied, as previously noted, that the onus rests with the
FSP to establish the application of the policy exclusion for flood.
The inability to establish the source of the water would suggest that the FSP has
failed to meet its onus to establish that the loss and damage to the home was caused
by flood.
In this regard the panel notes the conclusion of the FSP’s hydro logist, to the effect:
‘According to further detailed analysis of available terrain information, recorded rainfall
data and further hydrologic modelling, it is our opinion that the peak level of inundation
of the dwelling at (the insured address) could have been caused by either stormwater
runoff or by flood waters escaping the confines of the unnamed watercourse at a
location to the north east of the property or a combination of the sources.’
In this regard, it should be noted again that the panel chair ombudsman attended on
site with the applicant on 14 October 2016.
Having had the opportunity to consider numerous flood disputes and the ombudsman
having attended innumerable site meetings, the panel was very conscious of the fact
that this onsite visit, allowing observation of the relevant area and terrain, was
extremely beneficial in consideration of the likely course of events of 21 April 2015.
On site, the panel chair ombudsman observed that the access road to the front
(north) of the property, ran approximately west to east and was approximately one
metre higher than the floor level of the home. The access road sloped upwards from
west to east towards a number of hills.
The assessor ’s Report noted:
‘The home is situated in a small basin surrounded by hi lls and water has come into the
home from the higher grounds.’
Consistent with the applicant’s evidence that water had flowed down from the
northeast, the panel chair ombudsman was satisfied that it was likely water had
flowed down the access road to the front and into the property. In this regard it was
also noted that the gravel driveway to the east of the home was approximately 300
centimetres above the ground level at the front of the home and it was likely that any
Case No: 427697 Determination Page 7 of 9
stormwater or rainwater runoff would have flowed down the gravel driveway and off
into the area at the front of the home.
On the other hand, the FSP’s hydrologist identified that a gully exists between the
home and the nearby hills to the east.
It was the FSP’s hydrologist’s view that the maj ority of runoff that would be generated
from rainfall over the hills would be captured by the gully to the east of the home and
conveyed southwards away from the property and dwelling.
However, when attending on site, the panel chair ombudsman observed that the gully
referred to by the FSP’s hydrologist, commenced from a point approximately f ifty
metres south of the access road which runs in front of the applicant’s home. This
appears to be confirmed by one of the photographs contained in the report from the
FSP’s hydrologist (WP) dated 29 February 2016.
As a result the panel chair ombudsman was satisfied that waters directly to the east
of the home may have been captured by the gully, as suggested by WP, but waters
running down the access road to the front of the property and from the northeast
would not have been captured by the gully and would have flowed towards the home
itself.
The panel notes that WP says, in this regard, that the flow of water from the
northeast observed by the applicant, was water escaping from the watercourse to the
north of the property; accordingly, WP asserted that rather than constituting
stormwater runoff, this was actually water escaping the confines of the watercourse.
If this conclusion is correct then that water would all be categorised as ‘flood’.
However, noting that the applicant observed the inundation of the home at
approximately 9.30am, which was during the period of the heaviest rainfall (between
7.00am and 10.00am), the panel does not accept the conclusions reached by WP in
this regard.
Having considered numerous disputes involving similar weather events, the panel is
aware that the greatest stormwater runoff occurs contemporaneously with the heavy
rainfall and that overland flow from rising watercourses invariably occurs at a later
time.
Given that the flow of water onto the applicant’s property was contemporaneous with
the heaviest period of rainfall, the panel is satisfied contrary to WP’s conclusion
above that, rather than the water from the northeast being water escaping the
confines of the watercourse, that this water was more likely stormwater runoff.
Further, the panel chair ombudsman observed that at the front of the home there was
a brick porch of one brick depth. However, the bricks appeared to have sunk into the
ground and were in fact only approximately a half brick above the height of the
ground. In this regard, the panel notes that WP does not appear to have provided
any photographs showing the level of bricks at the front of the home, but only the
side and back of the home.
Further, the whole area to the front of the home is at a lower level to not only the
gravel drive to the east of the home but also the front yard of the home and the
access road to the north of the home.
Case No: 427697 Determination Page 8 of 9
In addition to the brick porch there was also a step up of one brick in height to the
floor level of the home.
As a result of the bricks of the front porch being partially sunk into the ground this
means that the floor level of the home was at a height of approximately one and a
half bricks above the ground level at the front of the home.
On site, the applicant showed the panel chair ombudsman the water mark on the
front door frame at approximately 175 millimetres. This means that the inundation to
this level was approximately 250 to 300 millimetres above the ground level in front of
the home.
The exchanged material confirms that in excess of 453 mm of rain was recorded in a
24 hour period.
Give the ferocity of the weather event combined with the terrain around the property,
including the slope down of the access road from east to west at the north of the
property, the panel is satisfied that the home was likely inundated above the floor
level by stormwater runoff. The panel is certainly not satisfied that the FSP has met
its onus to establish the application of the exclusion for flood damage in respect to
the damage to the home and its contents, the air conditioner and the shed.
WP was far from absolute in its conclusions regarding the circumstances leading to
the loss. Within the original report, WP stated:
‘It is unlikely the depth of local stormwater runoff would have been sufficient to cause
the over dash floor inundation of the dwelling. It is likely that water escaping the
unnamed watercourse at a point north of the property flowed south across (the road to
the front of the applicant’s property) and towards the dwelling, in causing the
inundation above floor levels.’ (Emphasis added)
The panel is not satisfied that the equ ivocal nature of WP’s conclusion reaches the
standard of proof required for the FSP to establish the application of the exclusion for
flood upon which it seeks to rely.
The FSP has argued the application of the Wayne Tank principle but given the
finding that the panel is satisfied that the home was inundated with stormwater runoff
rather than flood, the panel is also satisfied that the Wayne Tank principle has no
application to the circumstances of the applicant’s loss. The stormwater runoff
preceded in time, any potential later arrival of water from the watercourse.
Having reviewed all of the available material the panel is satisfied that the FSP is to
meet the applicant’s claim, under the terms of the policy, for damage to the home
and the home contents as a result of inundation of water, within the home, to the
level of 175mm.
On the other hand the panel has given consideration to the effect of water from the
unnamed watercourse to the west of the property and its impact on the fences at the
northwest corner of the property and the southwest corner of the property.
Having reviewed the exchanged material, the panel is satisfied the damage to the
fences at these two points was caused when water has come out of the unnamed
watercourse and covered the land in the area of the fences causing damage to the
fences.
Case No: 427697 Determination Page 9 of 9
As such, the FSP has established the basis of the application of the flood exclusion
in respect to damage to the fences.
Conclusion
Having considered all of the exchanges material, the panel is satisfied that the
applicant has established that the interior of the home and contents, the air
conditioner and the interior of the shed were impacted by the inundation of
stormwater runoff.
In addition the panel is not satisfied that the FSP has met its onus to establish the
application of the flood exclusion in respect to these areas.
The result is that the FSP is to meet to applicant’s claim for the home and contents,
under the terms of the policy, to the level of inundation to 175 millimetres.
The FSP is to also meet the applicant’s claim in respect to the damage to the air
conditioning unit.
In respect to the inundation in the shed, as noted above the FSP has met the
applicant’s claim for inundation to the level of 100 millimetres.
Within the second report provided by WP, it notes that the floor level of the shed is
the same level as the home. The panel notes that the applicant does not agree and
having attended on site the panel chair ombudsman is in agreement with the
applicant’s observation.
Following the site visit, the panel is satisfied that the whole block slopes downwards
from the front (the north) to the rear (the south) and the floor level of the shed is
slightly lower than the floor level of the home by approximately 150 millimetres.
In the circumstances, the panel is satisfied that it is fair that the FSP meet the
applicant’s claim, under the terms of the policy, in respect of the impact to the shed
and its contents to the level of 200 millimetres of inundation (that being an additional
100 millimetres above, that damage already accepted by the FSP).
The parties are encouraged to work together to reach a satisfactory resolve of the
calculation of the payments to be made given the terms of the policy and under the
terms of this determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.