Earthquake, storm and lightning building damage claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2016-10-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for building cracking and roof damage after an earthquake, storm and lightning event. AFCA found the proximate cause was differential footing movement and structural defects, so the FSP was entitled to deny the claim and had not unreasonably delayed it.

The applicant must first prove a loss caused by a listed event, and the dominant cause here was excluded footing movement and structural inadequacy.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 427291 Determination Page 1 of 6 Case number: 427291 4 October 2016 1 Overview 1.1 Dispute The applicant lodged a claim under his home building and contents insurance policy, held with the financial services provider (FSP), for damage sustained to the property because of an earthquake, storm or lightning, which struck a neighbouring tree. The FSP denied liability for the claim on the basis the damage had occurred because of differential footing movement and structural issues. 1.2 Issues and key findings Was the FSP entitled to deny the claim? The applicant has failed to establish the damage sustained to the property was caused by an event listed under the policy i.e. earthquake, storm or lightning. The damage sustained to the property was a result of events excluded under the policy or not covered. Did the FSP cause unreasonable delays in assessing the claim? The FSP has handled the claim within reasonable timeframes. It also accepted emergency make safe works and rectification works required, bearing in mind the policy most likely will not respond to the claim. The applicant is not entitled to an award of compensation. 1.3 Determination This Determination is in favour of the FSP. The FSP is entitled to deny the applicant ‟s claim. The FSP is not required to pay any compensation. Case No: 427291 Determination Page 2 of 6 2 Reasons for determination 2.1 Was the FSP entitled to deny the claim? The applicant is required to establish a claim under the policy The onus of proof rests on the applicant to establish, on the balance of probabilities, he has suffered a loss caused by an insured risk. Once the applicant has established the loss was caused by a risk insured against under the policy, the onus then shifts to the FSP to show, the loss falls within an exclusion clause of the policy or else is otherwise not covered. Damage to the building was not caused by the earthquake When the applicant initially lodged a claim with the FSP he was unsure whether the damage sustained to the property was caused by an earthquake in the previous year or a lightning strike which burnt a neighbouring tree. The applicant informed the FSP‟s builder , T:  lightning strike across the road hit a tree and the vibrations caused the ceiling in the lounge room to start to collapse  roof was sagging above the lounge room  rear brick wall of the house was damaged  cracking to the brickwork had worsened over the summer months  ground in the back yard had cracked badly As a result, the FSP engaged a consulting engineer (F), to inspect the property and report. F noted the ground near the cracked rear brick wall and the entire rear ground was dry and cracked. F was satisfied the cracking to various sections of the building was not caused by an earthquake or storm and was a result of differential footing movement over a period of time due to varying moisture levels in the soils, drying effects of the nearby trees, long drought in Victoria, etc. Based on the available evidence, the extent of the cracking in the property and also the condition of the rear yard, I am satisfied the FSP is not liable for the cracking damage sustained to the various sections of the brickwork and ceiling of the property as this damage was due to differential footing movement. Damage to roof was not caused by strong winds The applicant believes the damage to the roof, splitting of the hip rafter and subsequent resultant damage was caused by severe weather events in January 2014. He is of the view the loss may be related to high winds experienced in the area. Case No: 427291 Determination Page 3 of 6 The applicant presented a letter from the Bureau of Meteorology (BOM) confirming thunderstorms and strong winds were experienced in the subject area on 16 January 2014. F obtained further details about the weather events in January 2014 and notes:  The closest BOM recording station which records wind speeds is approximately five kilometres away from the subject site.  The highest recorded gust wind speed in January 2014 at the nearest BOM site was 81 km/hr, measured on 5th January 2014. The wind-speed on the 28th January 2014 of 59km/hr was the second highest wind-speed for the month.  the highest wind-speed in January 2014 was not reported as having caused any damage.  59km/hr equates to 16.3m/s which is significantly less than the minimum ultimate design wind speed as specified in the Australian Standards. I am satisfied that there is a lack of evidence that the strong winds caused damage to the roof. Damage to the roof was not caused by lightning The applicant says the FSP should have sought evidence from a lightning expert to assess whether the lightning strike to the neighbouring tree could have caused damage to the roof. I am, however, satisfied the onus remains with the applicant to first establish the damage was caused by an event insured under the policy i.e. lightning. The F SP‟s appointed b uilder noted that there was no visible water staining on the plaster or the insulation. However, above the ceiling there was damage evident to the roof structure. The hip rafter over the lounge has split and dropped causing the corner of the roof to partially collapse. The report from the fire department confirmed the debris from the subject tree had caused damage to the neighbouring property. However, there is no information the applicant‟s property sustained damage from the debris of the burnt tree. F provided further information that the issues with the roof were related to inadequate roof framing and also the following:  Cracked, broken and structurally failed hip beams  Dislodged roof rafters indicating inadequate frame fixing.  Presence of Barrup Trusses, which are often retrofitted where structural elements are found to be undersized, under-strengthened or deflecting excessively.  Evidence that the footings are not adequate given the magnitude of the differential in the levels measured across the floor and the nature of the damage to the structure.  Differential footing movement as a result of differential soil moisture content variations of the underlying clay foundation soils.  Abnormal moisture conditions at the site, caused by several factors including the presence of trees close to the building.  Inadequate roof framing. Case No: 427291 Determination Page 4 of 6 Even though the home building was constructed according to the relevant building codes at the time of construction, F says the installed footings are not expected to restrict differential movement to the same extent as those installed to current standards. The applicant appointed his own expert K. Whilst indicating the lightning may have contributed to the damage sustained to the roof, K identified various issues with the structure of the property, including poor construction detailing, together with footing and wall movements. As stated, the applicant carries the onus to establish that the loss and damage at the home was caused by a listed event, covered under the terms of the policy. This means that the applicant must establish that the proximate cause of the loss and damage is a listed event covered by the policy. The listed events covered by the policy include earthquake, storm and lightning. It is well established that the proximate cause is the effective or dominant or operative cause of the loss. If there are several causes operating, then each must be viewed for its impact. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Whilst the applicant‟s expert K indicated the lightning may have contributed to the damage sustained to the roof, he was clearly of the view that the significant design and construction issues meant that the roof structure failed and was inadequate for roof loading. Upon carefully reviewing the expert findings, I am satisfied on the balance of probabilities, the proximate cause of the damage to the roof was the resultant effects of the differential footing movement due to ground movement and structural iss ues with the building and the roof. The FSP is therefore entitled to deny liability for the claim. Did the FSP cause unreasonable delays in assessing the claim? The applicant has raised concerns regarding delays and the FSP has apologised for the delay and states it awaited the engineer‟s report to make a final decision on its liability for the subject claim. I am satisfied the FSP was entitled to review its expert F‟s findings before it made an informed decision about the claim. Once it received the report, the claim was declined soon after. Even though the claim was declined, the FSP agreed to reimburse the applicant‟s engineer K‟s charges. Some delays were experienced reimbursing the amount. FSP took immediate action as soon as the applicant notified it or the experts the make safe repairs required rectification or additional works. Case No: 427291 Determination Page 5 of 6 Considering all of the above, I am satisfied the FSP has handled the claim in a reasonable manner and the applicant is not entitled to any compensation. Case No: 427291 Determination Page 6 of 6 3 Supporting information 3.1 FOS Approach As advised to the parties, Financial Ombudsman Service (FOS) has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Applicant For ease of reference, the applicant and his representative have been referred to as the „ applicant ‟. 3.3 Claim lodgement “ Loss Date 11/02/ 2014 01: 31 PM Notice Date 13/02/2014 01:39 PM … Description There was an earthquake and we basically got the end of it, "the tremor" which has caused the ground to move. The stomps under the house are sinking, there are cracks on the ceilings and crack on the outside brick wall. The house is shifting because of the sinking stomps.”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.