Earthquake, storm and lightning building damage claim declined
Summary
The applicant claimed for building cracking and roof damage after an earthquake, storm and lightning event. AFCA found the proximate cause was differential footing movement and structural defects, so the FSP was entitled to deny the claim and had not unreasonably delayed it.
The applicant must first prove a loss caused by a listed event, and the dominant cause here was excluded footing movement and structural inadequacy.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 427291 Determination Page 1 of 6
Case number: 427291 4 October 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under his home building and contents insurance policy,
held with the financial services provider (FSP), for damage sustained to the property
because of an earthquake, storm or lightning, which struck a neighbouring tree.
The FSP denied liability for the claim on the basis the damage had occurred because
of differential footing movement and structural issues.
1.2 Issues and key findings
Was the FSP entitled to deny the claim?
The applicant has failed to establish the damage sustained to the property was
caused by an event listed under the policy i.e. earthquake, storm or lightning.
The damage sustained to the property was a result of events excluded under the
policy or not covered.
Did the FSP cause unreasonable delays in assessing the claim?
The FSP has handled the claim within reasonable timeframes. It also accepted
emergency make safe works and rectification works required, bearing in mind the
policy most likely will not respond to the claim. The applicant is not entitled to an
award of compensation.
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to deny the applicant ‟s claim.
The FSP is not required to pay any compensation.
Case No: 427291 Determination Page 2 of 6
2 Reasons for determination
2.1 Was the FSP entitled to deny the claim?
The applicant is required to establish a claim under the policy
The onus of proof rests on the applicant to establish, on the balance of probabilities,
he has suffered a loss caused by an insured risk. Once the applicant has established
the loss was caused by a risk insured against under the policy, the onus then shifts to
the FSP to show, the loss falls within an exclusion clause of the policy or else is
otherwise not covered.
Damage to the building was not caused by the earthquake
When the applicant initially lodged a claim with the FSP he was unsure whether the
damage sustained to the property was caused by an earthquake in the previous year
or a lightning strike which burnt a neighbouring tree.
The applicant informed the FSP‟s builder , T:
lightning strike across the road hit a tree and the vibrations caused the ceiling in
the lounge room to start to collapse
roof was sagging above the lounge room
rear brick wall of the house was damaged
cracking to the brickwork had worsened over the summer months
ground in the back yard had cracked badly
As a result, the FSP engaged a consulting engineer (F), to inspect the property and
report.
F noted the ground near the cracked rear brick wall and the entire rear ground was
dry and cracked.
F was satisfied the cracking to various sections of the building was not caused by an
earthquake or storm and was a result of differential footing movement over a period
of time due to varying moisture levels in the soils, drying effects of the nearby trees,
long drought in Victoria, etc.
Based on the available evidence, the extent of the cracking in the property and also
the condition of the rear yard, I am satisfied the FSP is not liable for the cracking
damage sustained to the various sections of the brickwork and ceiling of the property
as this damage was due to differential footing movement.
Damage to roof was not caused by strong winds
The applicant believes the damage to the roof, splitting of the hip rafter and
subsequent resultant damage was caused by severe weather events in January
2014. He is of the view the loss may be related to high winds experienced in the
area.
Case No: 427291 Determination Page 3 of 6
The applicant presented a letter from the Bureau of Meteorology (BOM) confirming
thunderstorms and strong winds were experienced in the subject area on 16 January
2014. F obtained further details about the weather events in January 2014 and notes:
The closest BOM recording station which records wind speeds is approximately
five kilometres away from the subject site.
The highest recorded gust wind speed in January 2014 at the nearest BOM site
was 81 km/hr, measured on 5th January 2014. The wind-speed on the 28th
January 2014 of 59km/hr was the second highest wind-speed for the month.
the highest wind-speed in January 2014 was not reported as having caused any
damage.
59km/hr equates to 16.3m/s which is significantly less than the minimum
ultimate design wind speed as specified in the Australian Standards.
I am satisfied that there is a lack of evidence that the strong winds caused damage to
the roof.
Damage to the roof was not caused by lightning
The applicant says the FSP should have sought evidence from a lightning expert to
assess whether the lightning strike to the neighbouring tree could have caused
damage to the roof.
I am, however, satisfied the onus remains with the applicant to first establish the
damage was caused by an event insured under the policy i.e. lightning.
The F SP‟s appointed b uilder noted that there was no visible water staining on the
plaster or the insulation. However, above the ceiling there was damage evident to the
roof structure. The hip rafter over the lounge has split and dropped causing the
corner of the roof to partially collapse.
The report from the fire department confirmed the debris from the subject tree had
caused damage to the neighbouring property. However, there is no information the
applicant‟s property sustained damage from the debris of the burnt tree.
F provided further information that the issues with the roof were related to inadequate
roof framing and also the following:
Cracked, broken and structurally failed hip beams
Dislodged roof rafters indicating inadequate frame fixing.
Presence of Barrup Trusses, which are often retrofitted where structural
elements are found to be undersized, under-strengthened or deflecting
excessively.
Evidence that the footings are not adequate given the magnitude of the
differential in the levels measured across the floor and the nature of the damage
to the structure.
Differential footing movement as a result of differential soil moisture content
variations of the underlying clay foundation soils.
Abnormal moisture conditions at the site, caused by several factors including
the presence of trees close to the building.
Inadequate roof framing.
Case No: 427291 Determination Page 4 of 6
Even though the home building was constructed according to the relevant building
codes at the time of construction, F says the installed footings are not expected to
restrict differential movement to the same extent as those installed to current
standards.
The applicant appointed his own expert K. Whilst indicating the lightning may have
contributed to the damage sustained to the roof, K identified various issues with the
structure of the property, including poor construction detailing, together with footing
and wall movements.
As stated, the applicant carries the onus to establish that the loss and damage at the
home was caused by a listed event, covered under the terms of the policy.
This means that the applicant must establish that the proximate cause of the loss and
damage is a listed event covered by the policy.
The listed events covered by the policy include earthquake, storm and lightning.
It is well established that the proximate cause is the effective or dominant or
operative cause of the loss.
If there are several causes operating, then each must be viewed for its impact.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Whilst the applicant‟s expert K indicated the lightning may have contributed to the
damage sustained to the roof, he was clearly of the view that the significant design
and construction issues meant that the roof structure failed and was inadequate for
roof loading.
Upon carefully reviewing the expert findings, I am satisfied on the balance of
probabilities, the proximate cause of the damage to the roof was the resultant effects
of the differential footing movement due to ground movement and structural iss ues
with the building and the roof.
The FSP is therefore entitled to deny liability for the claim.
Did the FSP cause unreasonable delays in assessing the claim?
The applicant has raised concerns regarding delays and the FSP has apologised for
the delay and states it awaited the engineer‟s report to make a final decision on its
liability for the subject claim.
I am satisfied the FSP was entitled to review its expert F‟s findings before it made an
informed decision about the claim. Once it received the report, the claim was
declined soon after.
Even though the claim was declined, the FSP agreed to reimburse the applicant‟s
engineer K‟s charges. Some delays were experienced reimbursing the amount.
FSP took immediate action as soon as the applicant notified it or the experts the
make safe repairs required rectification or additional works.
Case No: 427291 Determination Page 5 of 6
Considering all of the above, I am satisfied the FSP has handled the claim in a
reasonable manner and the applicant is not entitled to any compensation.
Case No: 427291 Determination Page 6 of 6
3 Supporting information
3.1 FOS Approach
As advised to the parties, Financial Ombudsman Service (FOS) has considered it
appropriate to expedite this dispute in accordance with the Operational Guidelines to
the FOS Terms of reference, due to the nature of the dispute. Accordingly, this
dispute has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Applicant
For ease of reference, the applicant and his representative have been referred to as
the „ applicant ‟.
3.3 Claim lodgement
“ Loss Date 11/02/ 2014 01: 31 PM
Notice Date 13/02/2014 01:39 PM
…
Description
There was an earthquake and we basically got the
end of it, "the tremor" which has caused the ground
to move. The stomps under the house are sinking,
there are cracks on the ceilings and crack on the
outside brick wall. The house is shifting because of
the sinking stomps.”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.