Text of the determination
Determination
Case No: 427224 Determination Page 1 of 8
Case number: 427224 3 January 2017
1 Overview
1.1 Dispute
In July 2015, the applicant made a claim under his household insurance policy with
the financial services provider (FSP) for water damage from his bathroom. He
wanted the FSP to deal with that, and an outstanding one from May 2015, as a single
claim.
The FSP accepted the July claim, but said the earlier damage was the result of a
different event, and so would be treated as a separate claim. It later decided the May
damage was excluded under the policy in any case.
The applicant does not accept the FSP ’s position. He believes the damage caused in
May 2015 should be covered. He also believes that additional damage which was
identified at the time is related to a claim made in 2010, when the FSP carried out
repairs but did not properly dry out the affected area.
The applicant is unhappy with the service provided by the FSP, but accepted the
case manager’s rec ommendation that the FSP pay $250 compensation for failing to
re-install the bathroom door.
The applicant did not agree with the recommendation that the FSP could deny
liability for the May 2015 event.
1.2 Issues and key findings
What is the extent of the FSP ’s liability for the water damage?
The FSP is not required to indemnify the applicant in respect of damage to the
downstairs office caused by the May 2015 event (specifically the replacement of part
of the ceiling and repainting of the walls and ceiling). This is because t he policy
excludes cover for damage caused by leaks from shower recesses or cubicles .
The FSP must deal with the separate July 2015 claim by paying for the remaining
damage to the main bedroom, ensuite and walk - in - robe . That includes repa irs to the
flooring in the ensuite , as it has not established that it should be excluded.
Has the FSP’s claim handling been unreasonable?
Although a dispute arose between the parties as to what was covered under which
claim, and there have been some delays, the FSP has been generally reasonable in
its handling of the claims.
Case No: 427224 Determination Page 2 of 8
Is the FSP required to pay compensation to the applicant?
The FSP is required to pay the applicant compensation for non-financial loss. This is
because it did not address the applicant’s complaint about the bathroom door having
been removed and not returned by its contractor for a number of months.
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is required to indemnify the applicant in respect of water damage to the
ensuite bathroom, walk-in wardrobe and bedroom, which is not attributable to the
May 2015 event.
Interest is payable on any cash settlement made, calculated at the statutory rate from
24 February 2016 until the date of payment.
The FSP is required to pay compensation for non-financial loss in the amount of
$250.
Case No: 427224 Determination Page 3 of 8
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 The FSP is liable for water damage from the July 2015 event and to
the flooring
Damage caused by leaks from shower in May 2015 is excluded
The policy provides cover for loss or damage for leaks from (among other things)
fixed domestic items including water tanks, lavatory cisterns and pans, baths, basins
and sinks; but it specifically excludes loss or damage caused by leaks from shower
recesses or cubicles.
The damage from the May 2015 event is summarised as being to ‘plasterboard
ceiling to office’ after water came through the ceiling and light fitting to the study on
the storey below. The evidence indicates that water had leaked or overflowed from
the applicant’s shower when a drain was blocked.
However, the FSP did start dealing with the claim and obtained a quote for the
repairs. The applicant said he preferred to use his own builder , ‘ GM ’, and on 2 July
2015, he provided the FSP with an alternative quote. The bulk of the damage GM
identified was also to the downstairs office (with repairs involving sealing and painting
the entire ceiling, painting 2 affected walls, reconstructing swollen MDF ducting,
replacing ceiling downlight).
It was while the FSP was considering this quote, and before it had arranged for a re-
assessment of the damage, that the July 2015 event occurred.
Under the circumstances, it is not unreasonable that the FSP then re-assessed the
May 2015 damage and its liability under the policy for what had happened at that
time. It then declined the claim, and no excess was payable for that.
I am satisfied that the FSP was entitled to deny liability for the damage which
resulted from the May 2015 event, because the exclusion for leaks from shower
recesses applies.
I acknowledge the applicant’s argument that what happened in July effectively
replicated the damage that had occurred previous ly. However, even though water did
escape to the lower floor in July, there was already identifiable pre-existing damage
from the separate incident in May, and it has not been established that the later event
would, on its own, have had the same effect. So, under the circumstances, I do not
consider it is reasonable or necessary to deal with the May 2015 damage as part of
the July 2015 claim.
Case No: 427224 Determination Page 4 of 8
FSP is liable for July 2015 damage to bedroom, ensuite and walk-in robe
The FSP’s loss adjuster, ‘SL’, inspected on 17 July 201 5 and reported that the July
event involved water escaping from a burst flexible water pipe under the bathroom
vanity, onto the tiled floor, where it spread across and into the walk -in robe, then the
bedroom. The water then leaked through the floor boards into the office ceiling
below, and onto the office furniture.
The FSP also arranged for building consultant ‘S’ to inspect the property. S ’s report
identifies the specific damage to the building from the July event as being to:
the ensuite vanity
the gable ends to the walk-in robe
skirting boards and architraves to the master bedroom
vinyl floor coverings to bedroom 1 and walk-in robe.
The policy cover for ‘leaks’ includes damage caused by water discharging from
pipes. So, there is no dispute that the damage in July 2015 was from an insured
event, and the FSP has not suggested that exclusions apply in respect of the
damage identified above.
Exclusions do not apply to the additional damage identified
However, S also observed ‘what appears to be long -term water damage to the
particle board flooring in the walk- in wardrobe’ which they attributed to ‘general
ensuite usage’. In their estimate for the May 2015 damage to the downstairs office,
GM too had identified water damage to the flooring both in the wardrobe and under
the shower, and included that work in their quote.
The applicant believed that damage to the floor was from the way the FSP had
handled repairs following the 2010 claim, by failing to properly dry it out at the time.
That claim was initially reported by the applicant as having arisen from a running tap
and a plug being left in, resulting in water flooding the bathroom, and through into the
walk-in wardrobe onto the vinyl.
While the FSP did end up accepting the July claim for the damaged flooring in the
walk-in robe, it maintained it need not cover the shower area. It also does not accept
that the damage is related to the 2010 claim. Instead – referring to ‘damaged tiles
and waterproofing’ – the FSP submits the damage arose from a leak from the shower
recess occurring over a period of time. It also believes the general exclusions for
‘wear and tear’ and ‘rust and mould, or gradual deterioration’ apply.
The FSP arranged for plumber ‘ P ’ to attend. P ’s report of 18 January 2016 explained
that after testing, they had eliminated the possibility of a leak in the concealed
pipework , and there had been no other leaks detected through cracks or water
dripping from pipework.
Although P also provided an opinion as to a possible cause of water damage to the
chipboard flooring (through porous grouting and tiles), that opinion was couched in
inconclusive terms, and was not substantiated by specific evidence. There is no
evidence that P (or any other FSP contractor) performed other testing to establish the
condition of the grout, whether or not there was any waterproofing in place and
Case No: 427224 Determination Page 5 of 8
whether any waterproofing had failed; nor have I seen anything to show damaged
tiles.
The FSP says its quality and technical loss adjuster, ‘ D ’, then reviewed P’s report
and indicated that due to the extent of damage to the flooring beneath the shower
recess, it had been leaking for a period of time, creating a sponge effect and drawing
just enough moisture without causing it to drip. However, D’s actual statement has
not been provided to us.
On the available evidence, I am not persuaded that there was a leak from the shower
recess which caused this damage to the flooring, or additional damage to the
wardrobe.
I am also not satisfied that the FSP has established the damage – given what and
where it is – can reasonably be attributed to general wear and tear; nor to ‘gradual
deterioration’ (which, in any case, is limited in the policy to ‘gradual deterioration
caused by light, air, the climate…or the passage of time’). There is also no mention
of mould in the area, which I understand was found to be dry when inspected. GM
says, in his experience, a slow leak would cause mould.
The FSP also seeks to rely on the exclusion for loss which cannot be linked to any
identifiable event. The evidence does indicate there was water damage to the
wardrobe and ensuite flooring which was not recent, and not reasonably attributable
to what happened in July 2015. That damage was first identified after the 2010 event
and at the time the May 2015 claim was being investigated. While this has not been
fully explored, I consider it is not unreasonable to allow for the possibility that the
flooring damage could be linked to what happened in 2010, if affected areas did not
dry out immediately.
In any case, the FSP did agree to accept the claim in respect of the wardrobe
flooring, and it is not clear, on the evidence provided, why that was being treated
differently to the damaged flooring under the shower – particularly since the FSP has
not established that there was in fact a leak from the shower.
So, under the circumstances, I am not satisfied that it is fair to apply the exclusion for
loss not linked to an event.
2.2 T he FSP’s claims handling has not been unreasonable
The first claim was in 2010, repairs were carried out and the applicant indicated at
the time that he was happy with the quality of the repairs.
The second claim was in May 2015. It was only then that the applicant expressed
dissatisfaction with the work done by the FSP’s contractors for the previous claim,
some four years before. This was after GM discovered water damage to the flooring
under the wardrobe and shower.
The third claim was made about two weeks after the applicant obtained the
alternative quote for the May 2015 claim, and had submitted it for consideration to
the FSP.
Case No: 427224 Determination Page 6 of 8
I appreciate there was uncertainty and disagreement between the parties as to what
damage was covered under which claim; and there was the change of position by the
FSP about accepting the May 2015 claim. This will inevitably have led to some delay
and inconvenience in sorting things out. However, I have not seen evidence of
mismanagement of the claim by the FSP, and it appears that the FSP has generally
handled the matter in a reasonable fashion.
2.3 The FSP is required to pay the applicant compensation
Under 9.3 of our Terms of Reference (TOR), FOS may award compensation for non-
financial loss, but only where:
there has been an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the applicant’s expectation
of enjoyment or peace of mind
in the case of a dispute pertaining to an individual’s privacy rights – injury
has occurred to the applicant’s feelings or humiliation has been suffered by
the applicant.
The maximum for any such award would be $3,000 per claim made in the dispute.
Applicant’s complaint about removal of bathroom door not addressed
The applicant complained that the FSP’s contractor removed the bathroom door, but
did not return it. It is not apparent that the FSP followed this complaint up or did
anything about it.
The FSP has accepted that the missing bathroom door limited the use of the
bathroom and inconvenienced the applicant and his family, particularly over the
Christmas holiday period when they had visitors.
Under the circumstances, I consider it fair and reaso nable that the FSP pays the
applicant $250 in compensation for that avoidable trouble and inconvenience.
Case No: 427224 Determination Page 7 of 8
3 Supporting information
3.1 Policy provisions
Leaks
Leaks are liquids that are leaking, bursting, discharging or overflowing from certain items or devic es.
For example, the hose in your dishwasher bursts and wat er damages your kitchen cupboards and
floors.
Ye s
The following items or devices malfunction at or near your home and leaks from them cause
loss or damage to your home or contents:
…
o pipes, gutters and drains which are fixed or connected to your home
o fixed domestic items which include wat er tanks, lavat ory cisterns and pans, baths, basins
and sinks
o water mains.
No
Loss or damage caused by:
o leaks from shower recesses or cubicles
...
Loss or damage caused by gradual and ongoing leaks.
General exclusions
These general exclusions apply to all of the cover we provide under your policy.
We don’t cover you under your policy for loss or damage to your home or contents or legal liability
which is caused by or arises in connection wit h any of the following items or events:
…
Rust and mould - Rust, corrosion, rot, mould or gradual deterioration caus ed by
light, air, the climate (which includes wind, rain or sand) or the
passage of time
…
Wear and tear - Wear and tear through normal use.
…
Loss not linked to event - Loss to your home or contents which can’t be linked to any
identifiable event (but we do cover you if you have an optional
benefit under ‘Portable items’ – see page 51).
Case No: 427224 Determination Page 8 of 8
3.2 Experts’ reports
Re port Key points
FSP’s consultant (S)
Report (2010 claim)
25 January 2011
Vinyl has lifted at bottom of gables only
Inspected but no damage downstairs
FSP’s consultant (S)
Report (May 2015 claim)
25 May 2015
Damage to plasterboard ceiling in office
Causation
A blocked waste pipe to the upstairs shower has resulted in
water overflowing into the bathroom and subsequently,
through into the downstairs ceiling
FSP’s consultant (S)
1 st report (July 2015 claim)
21 July 2015
Also i dentified what appears to be long - term water damage to
the particle board flooring in the walk in wardrobe from
general ensuite usage
FSP’s consultant (S)
3 rd report
25 August 2015
C laim is now accepting water damage to particle board
flooring in walk - in robe
FSP’s consultant (S)
4 th report
11 December 2015
Referred to p reviously identified ‘other damage unrelat ed to
the event’
Recommended cash settlement for event - related damage
FSP’s pl umber (P)
Report (July 2015 claim)
18 January 2016
After testing, n o leaks detected in conc ealed or ot her
pipework
Due to the age of the house and it being constructed before
wet sealing in wet areas was mandatory the probable cause
of water damage maybe simply water penetrating the grout
and tiles as it is porous material and caused d amage to the
chipboard flooring.
Applicant’ s builder (GM)
Quot e (May 2015 claim)
29 June 2015
Water damage to robe and downstairs office
Rotted floor at robe - ens uite entry
Swollen shelving in robe
Work to ceiling, affected walls and downlight in office
Applicant’ s builder ( G M)
Email (July 2015 claim)
19 April 2016
Water damage to ceiling, pipe duct work and down light
damage to lower level office – dry at the time, but evidence of
swelling and water - marking
Adjoining robe flooring also dry, but showed swelling and
deterioration
No evidence of slow leak – which would have caused mould
to an isolated area
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.