Determination 427202

Temporary accommodation costs during repairs to water-damaged unit

FirmFinancial Firm (Unknown - Insurer)
Decided2016-11-07
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A unit owner whose property was extensively damaged by a burst pipe claimed temporary accommodation costs during repairs, and the FSP disputed entitlement because the unit was not his principal residence. AFCA found cover applies, limited to accommodation for up to two weeks in every four week period, with costs only payable when incurred.

Temporary accommodation cover for an owner-occupied unit applies to costs necessarily incurred during repairs, interpreted by reference to the owner's regular use of the property.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 427202 Determination Page 1 of 6 Case number: 427202 29 September 2016 1 Overview 1.1 Dispute The applicant lodged a claim for damage caused to his unit as a result of a burst water pipe on 20 December 2015. A significant part of the unit was inundated with water damage, which occurred over an estimated period of about six weeks and caused damage estimated at $500,000. The financial services provider (FSP) accepted the claim and attended to repairs at the unit. A dispute emerged over cover for temporary accommodation costs under the policy and for the replacement of the floor tiles sought by the applicant. This second aspect was later resolved. A case analyst for FOS provided the parties with a preliminary view of the dispute over the phone regarding the issues in dispute. The verbal recommendation was in favour of the FSP. The applicant did not accept this preliminary view. In the circumstances, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the applicant entitled to temporary accommodation costs? The applicant is entitled to temporary accommodation costs under the policy. If the applicant is required to reside in Queensland for the duration of the repairs, the FSP should indemnify him for this (subject to proof of his stay). Otherwise, it is fair that the FSP allow for temporary accommodation costs for up to two weeks of every four week period during the repair period based on the applicant ‟ s prior use of the property and need to attend to supervise the repairs. 1.3 Determination This determination is partially in favour of the applicant. Should he accept the determination, the FSP should indemnify him for suitable temporary accommodation if he stays in Queensland for the duration of the repair process. If the applicant chooses to commute, then I accept the FSP should indemnify him for accommodation of up to two weeks in every four week cycle from the date the determination is accepted. The FSP will only be liable for costs incurred . Case No: 427202 Determination Page 2 of 6 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the verbal preliminary view provided to the parties. I am satisfied the documentation I have relied on has been provided to both parties. New material provided after the preliminary view The applicant provided information to indicate the property had been occupied for 145 days in the previous year by his family. The FSP has queried this as no information has been provided to confirm the applicant ‟ s travel itinerary for the dates provided. The FSP maintains it is only liable for the temporary accommodation costs necessarily incurred. The FSP disputes that the costs where necessarily incurred. 2.1 Is the applicant entitled to temporary accommodation costs ? Significant damage cause to the insured property It is not in dispute the applicant was covered for the failure of a flexible water connection in the toilet at the property. The FSP agreed to cover him for the resultant damage, pursuant to the terms of the policy. This resultant damage was significant, requiring an estimated $500,000 worth of repairs. The applicant contends the FSP has not discharged its onus under the policy as it has failed to adequately cover him for temporary accommodation costs. The policy provides cover for temporary accommodation costs The applicant seeks temporary accommodation costs under the terms of the policy, relevant to the period of repair. The policy notes under section 18 (Loss of Rent, Temporary Accommodation and Removal Costs), it will: „… pay the following costs where Your Unit or Common Area suffers Damage and is unable to be occupied for its intended purposes or when reasonable access to or occupancy of Your Unit or Common Area is prevent ed by Damage happening to other property within the immedi ate vicini ty of Your Unit or Common Area…‟ I accept the applicant‟s property suffered extensive damage and this rendered it „ unable to be occ upied for its intended purposes‟ . Temporary accommodation is covered under this section is defined as: „ Where a Unit is owner-occupied, We will pay the reasonable Temporary Accommodation Cost You necessarily incur. We will pay for the period that is reasonably necessary for repairs and rebuilding to be completed and access to Your Unit is re- established.‟ Case No: 427202 Determination Page 3 of 6 “O wner- occupied” is not defined in the policy, though I am satisfied it reasonably may be interpreted as when the owner of the home also lives in the property. No evidence has been submitted to suggest an owner-occupier has to be a permanent resident of the property and it is clear the applicant did occupy it, though not on a permanent basis – his usual home is interstate. There is no evidence the unit was leased. Entitlement to cover The applicant seeks costs for alternate accommodation expenses for the duration of the repairs being undertaken by the FSP. The applicant argues that he is entitled to have the cost of a property rented in the area for the period of the reconstruction. His argument is that he previously had access to the residence on a full time basis and believes he should be reinstated to his previous position. In conversations with a case analyst at FOS, he noted that short term occupancies in the local area were not viable and the only way to obtain a suitable property for his needs was to commit to a longer term occupancy. The FSP considers that as the applicant was not a permanent resident of the property he should not be entitled to have a property for his exclusive and reserved use, given he has appropriate alternate accommodation at his main residence. Conversely, the applicant says he needs to be close to the construction to oversee the progress of the work to his unit. He estimated at the time of the preliminary view (3 June 2016) that the repairs would take another four to six months to complete, whereas the FSP estimated it would take two to three months. Property unfit for intended purposes The clause in the policy for temporary accommodation notes that it applies when the property is unfit for its “intended purposes”. The property‟s i ntended purpose was that of a secondary residence and/or a holiday home. It was unfit for this purpose due to the damage sustained. The policy also stipulates that coverage relates to the costs an insured person will “necessarily incur”. I accept that this means costs necessarily incurred because the applicant cannot occupy the property during the repair process. Costs necessarily incurred In the event that the property was the applicant‟s principal residence then the temporary costs necessarily incurred would be the costs of a suitable rental property. It would not be unusual in such circumstances that a rental agreement for a set period of six to twelve months be agreed to depending on the repair timetable. I accept however that this is not applicable in the current dispute as the property was not the applicants‟ principal residence. In my view, the costs necessarily incurred in these circumstances would be the costs of temporary accommodation that would be incurred when the applicant would otherwise have travelled interstate to use his property. Further it is not unreasonable (particularly with a scope of work estimated at around $500,000) that the applicant Case No: 427202 Determination Page 4 of 6 would want to repair periodically. This might lead to additional temporary accommodation costs. FSP not liable to indemnify for inconvenience The wording in the policy does not require the FSP to indemnify the applicant for the convenience of having a property on standby for when the applicant chooses to attend the area. The FSP has confirmed it would cover accommodation costs if the applicant were present for the duration of the repairs but not simply for the convenience of the applicant having somewhere to stay if he is to travel to the area. I accept this is reasonable. Should the applicant wish to stay in Queensland for the duration of the repairs, I am satisfied the FSP should indemnify him for this. If the applicant does not wish to stay in Queensland for the duration, a different arrangement is necessary. Applicant used the property regularly The applicant has provided details of his use of the property for the previous year. Although the FSP queries this, I have no reason to question the applicant‟s credibility on this issue. The applicant estimated he (or his family) had used the property on 145 of the 365 days. That is roughly 40% of the previous year. The property was regularly occupied. FSP should cover the temporary accommodation costs based on what is fair in the circumstances. Allowing for the wish to attend the property to inspect repairs and considering what is fair in the circumstances given the applicant ‟ s regular use of the property, I believe the temporary accommodation allowed should be sufficient to cover up to 50% of the period for the duration of the repairs. This would allow for the applicant to cover the temporary accommodation costs necessarily incurred in seeking suitable alternative accommodation and additional attendances during the repair process to inspect the repairs. I am satisfied in the circumstances it is fair that the FSP indemnify the applicant for the cost of reasonable accommodation for up to two weeks in every four week period for the duration of repairs. This cover should include:  the costs for a reasonable two-bedroom unit/apartment with kitchen facilities for the duration of any stay (within the parameters specified)  any reasonable expenses already incurred for accommodation in Queensland since this incident occurred. The FSP is not obliged to cover the applicant for not incurred or will not incur. That is, if he is not present for the duration of any period over the course of the rebuild, the FSP is not obliged to provide cover for the period. Finally, I note that as the project gets closer to completion the applicant may need more access to the property and/or be required to inspect the quality of the work. Case No: 427202 Determination Page 5 of 6 This is not unusual for any home owner. To this end, I consider the FSP should (at its discretion) arrange with the builders to work around the applicant‟s permitted travelling schedule. I accept this determination may not be to the applicant‟s preference and that he will not be indemnified to travel when he likes and/or the specified accommodation may not be to the standard he wants. It is not unusual in the handling of any claim for an applicant to experience some inconvenience. In this instance, the applicant is receiving the benefit of the policy‟s cover for the extensive work required to repair his unit. It is a n unusual scenario that the owner will come from interstate to inspect the progress but I accept it is not unreasonable here. The temporary accommodation is not designed to place the applicant in the position he would have been in but more to alleviate the inconvenience during that time. I am aware the applicant‟s un it is a three-bedroom home, although my considerations in limiting the type of accommodation the FSP should provide are in relation to what I consider is fair. There is also the practical consideration as to obtaining a relevant and acceptable premises for the applicant. The stated parameters for accommodation may not be the applicant‟s preference but FOS typically expects an applicant to take a robust approach to this and the stated conditions are in consideration with what I consider is a far outcome for both parties. Should the FSP and the applicant be unable to obtain a property that fits the specified criteria, I am satisfied the FSP may choose any such appropriate alternative that may suit the applicant‟s purposes. The parties may agree to settle the cost of temporary accommodation by way of a lump sum but this is not a matter that is relevant for this determination. Case No: 427202 Determination Page 6 of 6 3 Supporting information 3.1 FOS approach to this dispute General information As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions to FOS. For the purpose of this determination, commentary is restricted to only those issues considered relevant to the outcome.