Cash settlement offer for water-damaged kitchen floor disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2017-02-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$130,000
SourceAFCA PDF

Summary

The applicants rejected the FSP's $31,145.52 cash settlement for water-damaged kitchen flooring and sought $130,000. AFCA found the offer fair and consistent with the policy, rejected the request for non-financial loss, and ordered no payment.

The policy allows the FSP to cash settle, and the scope of works matched flooring of the same type, standard and specification, so the offer was fair.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 427020 Determination Page 1 of 5 Case number: 427020 8 February 2017 1 Overview 1.1 Dispute The applicants held a Home and Contents Insurance Policy with the fi nancial services provider (FSP) and lodged a claim on 19 September 2015 for damage resulting from a leaking water pipe. A dispute arose as to the proposed scope of works and cost of repairs after the FSP accepted liability for the claim. The FSP has offered to cash settle the claim for $31,145.52 based on quotes obtained including an allowance for temporary accommodation. The applicants rejected the offer and seek $130,000 for the cost of replacing all flooring, temporary accommodation and storage costs. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim? The policy provides the option to the FSP to repair or rebuild the damaged property or pay the applicants what it would cost the FSP to repair or rebuild the home. The FSP offered to repair the property however the applicants have requested a cash settlement. The Panel accepts the FSP can cash settle the applicants’ claim. Does the Scope of Works cover the loss or damage? The FSP is entitled to rely upon the scope of works in determining the extent of its liability. Is the FSP’s off er fair in all the circumstances? The Panel is satisfied that the FSP’s offer of $31,145.52 is fair in all the circumstances as the offer is based on the quotes provided and includes a necessary allowance to the applicants for temporary accommodation. 1.3 Determination This determination is in favour of the FSP. The Panel is satisfied that the FSP’s offer of $31,145.52 to settle the applicants’ claim for loss or damage sustained is consistent with the terms and conditions of the policy and fair in all the circumstances. Case No: 427020 Determination Page 2 of 5 Case No: 427020 Determination Page 3 of 5 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. In view of the complexities involved, this dispute has been referred to a Panel for determination. The Panel in reaching this determination has taken into account all information provided and has based its determination on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP entitled to cash settle the applicants’ claim ? The FSP is entitled to cash settle the applicants’ claim The applicants ’ policy is a Home Building & Contents Policy. Under the policy, the FSP has the option to repair, rebuild or cash settle a claim for loss or damage sustained to the property. This discretion should be exercised reasonably and consistent with the principles of utmost good faith. There is no dispute that the applicants’ property sustained water damage to the floor boards in the kitchen after a water leak from a faulty leaking pipe underneath the kitchen sink. The FSP obtained a scope of works from PBS together with quotations to remove and store furnishings. The FSP initially decided, consistent with the terms of the policy, to repair the damage and determined PBS to be the repairer. After receiving copies of the reports from PBS and RX, the applicants advised they were dissatisfied with the scope of works. In the dispute notice sent to FOS, the applicants confirm that as they believe the property had been inadequately assessed, they were not keen for the FSP to carry out the works and had requested that the claim be cash settled after an adequate scope of works was obtained. As a result, the FSP has decided to exercise its discretion under the policy to cash settle the applicants’ claim. The Panel accepts in the circumstances that the FSP’s decision to cash se ttle the applicants’ claim is consistent with the terms of the policy and fair in all the circumstances. 2.2 Is the FSP’s scope of works adequate? The FSP’s scope of works is adequate The scope of works obtained by the FSP from PBS provides the following:  furniture removal – remove all furniture within the floor area (including fixed wall unit) and store furniture offsite, reinstate all furniture upon completion of floor repairs Case No: 427020 Determination Page 4 of 5  dust prevention – mask up all light fittings, vents and kitchen cupboards to prevent dust, contain work area to prevent dust extrusion to entire home, remove all dust prevention methods upon completion of floor repairs  floor repair/kitchen hallway – remove and repair/ supply and install water damaged timber floorboards as required (approximately 3m²) to match existing as close as possible  sand and polish – sand and polish entire timber floorboards with (3) coats to match existing as close as possible (approximately (227m²)  skirting/quad trim – remove all quad trim from around kitchen benc htop and cabinetry and supply and install new quad to match existing upon completion of flooring repairs  skirting – prepare and paint skirting as required to match existing due to floor sanding. The applicants maintain that as the home is an open plan livi ng (with limited architectural breaks) the entire area of the timber floorboards, that is approximately 220m², should be replaced. The applicants maintain it is highly unlikely that the FSP would be able to match the floor to the existing floor. The applicants also maintain no allowance has been made by the FSP to replace any water affected plywood substrate directly beneath the damaged floor area. The applicants seek:  removal and supply and install timber floorboards to the entire area (227m²)  remove and supply and install all skirting boards and quads throughout the area and paint to match existing  remove and supply/install plywood substrate to match existing to the immediate vicinity of the leak area. Policy terms The policy provides that where the FSP seeks to repair or rebuild, it will do its best to obtain new materials that are of the same type, standard and specification. The FSP provided information via an email on 2 August 2016 that PBS had sourced the relev ant flooring “New South Wales Blue Gum (85mm x 19mm select grade) from a supplier and would be available within two to three weeks. The Panel is satisfied based on this information that the FSP was able to source material of the same type, standard and specification to the applicants’ kitchen flooring. The policy provides in the event of the repair or rebuild that the FSP is only liable to repair the parts that are damaged and are not liable to repair or replace any undamaged parts to create a uniform appearance. The policy does not require the FSP to repair or replace the undamaged parts given the FSP is able to match the material. The Panel is satisfied that the scope of works providing for the replacement of 3m ² of the flooring and the sanding and polishing of the entire flooring is fair in these circumstances. There is no evidence the plywood substrate needs to be replaced. Case No: 427020 Determination Page 5 of 5 The Panel is satisfied that the offer to settle the a pplicants’ claim for $31,142.50 is based on the scope of works meets the FSP ’s liability under the policy. The offer includes not only the costs for the work necessary to repair the applicants’ flooring but also appropriate allowance for storage costs and temporary accommodation. Whilst the applicants have claimed additional storage costs and temporary accommodation, this claim is based on the applicants’ view that it would take longer (50 days) to repair the property. There is no evidence this would occur, in particular given the Panel’s fin ding that the offer to replace the 3m² flooring is fair in the circumstances. Other matters The applicants have also requested compensation for non-financial loss due to the stress associated with the claim process. The Panel notes from the information exchanged that the FSP responded swiftly to the applicants’ claim and made all attempts to resolve the claim in accordance with the applicants’ wishes. A dispute arose not because of the FSP’s claims handling but due to the applicants’ view that the scope of works obtained was not adequate. The Panel is not satisfied in these circumstances that the inconvenience suffered by the applicants can be placed on the conduct of the FSP. In the circumstances, the Panel does not believe compensation for non-financial loss is payable.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.