Water damage claim re-declined after leak source found

FirmFinancial Firm (Unknown - Insurer)
Decided2016-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$11,600
Non-financial loss—
Amount claimed$11,600
SourceAFCA PDF

Summary

The applicants sought about $11,600 spent on 2009 water damage repairs after the FSP declined that claim. AFCA found a leaking drain caused both episodes and ordered reimbursement with interest.

Liquid escaping from a fixed pipe was established as the cause, so the FSP had no basis to deny the policy claim for the 2009 repairs.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 426553 Determination Page 1 of 7 Case number: 426553 9 December 2016 1 Overview 1.1 Dispute The applicants hold a building and contents policy with the financial services provider (FSP) covering their home address. On 17 November 2015, a claim was lodged under the policy for water damage to the rumpus room, caused by a leaking pipe. The FSP accepted the claim and agreed to cover the resultant damage once the leak was remedied. The applicants say the damage is identical to an incident in 2009. A claim was lodged in that instance, however it was declined by the FSP as the damage was not considered to have arisen as a result of an insured event. This was because no leaking pipe was discovered at the time. The applicants say the two events are related and they seek reimbursement of approximately $11,600 which was spent in an attempt to fix the issue in 2009. 1.2 Issue and key findings Is the FSP liable for the 2009 repairs? The applicants have established, on the balance of probabilities, that the 2009 damage was caused by the same leak as the 2015 damage and the FSP has not established a basis for denying the claim. The FSP is therefore not entitled to deny the claim. 1.3 Determination This determination is in favour of the applicants. The FSP is required to pay the applicants $11,600 plus interest in accordance with the Insurance Contracts Act from 7 April 2016 to the date payment is made. Case No: 426553 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP liable for the 2009 repairs? There are three claims relevant to this dispute There are three claims that arise from the facts of this dispute. All three relate to the same area of water damage. Claim 1 was the subject of a previous FOS determination (determination 201158). That determination, issued on 9 August 2010, found:  The claim was for $10,197 for rectification works to water damaged walls and for further assistance in determining the cause of the water damage, which had reappeared.  The FSP was entitled to deny the applicants ’ further requests for assistance in investigating the claim. This was because the FSP had paid the $1,000 required under the policy to investigate the source of the wa ter damage.  The applicants had not established an insured event in respect of the water damage, and therefore were not entitled to cover under the policy. This is because tests undertaken at that time had not established the cause of the water damage.  The applicants could conduct further excavation of the property, but such cost was to be incurred at their own expense. The applicants say that the failure of the plumbers to correctly identify the cause of the water damage as part of its investigations has led to claim 2 and claim 3. Claim 2 involves similar damage and arose in 2015. The FSP’s plumbers , PP, have determined that the cause of the damage was a broken leach pipe. The FSP has accepted this claim. Claim 3 is a claim by the applicants for the 2009 rectification works based on the evidence obtained as part of claim 2. Claim 3 is the subject of this determination. New evidence established that the leak has existed over time In its Notice of Response (dated 4 April 2016), the FSP said the applicants had not established that the source of the damage for claim 1 was the same as the source of the damage for claim 2. However, the FSP was prepared to postpone a final decision until a further report had been obtained from PP, which required excavation works. From the claim notes it is apparent that the FSP provided PP with the claim information for claim 1, requesting that PP review and make comment given the damage area from claim 1 is the same as claim 3. The FSP notes the applicants completed repairs as per the original advice that the damage was caused by water seepage, but the same damage has recurred. PP’s further report was received on 6 April 2016. It stated: We would consider that stormwater backing up from the system prior to our first investigation [25 November 2015] and subsequent hyrdo jet cleaning of the system has Case No: 426553 Determination Page 3 of 7 been flowing out from this broken / void in the drain and then soaking into the adjacent brick wall of the storage room. We would suggest that this termination and subsequent break in the leach pipe system has been present since construction of the property and that initial overflows probably dispersed into the surrounding ground. We would consider that over time this surrounding soil probably became silted and blocked up hence leading to the current situation whereby the overflow now penetrates the wall adjacent. The FSP made no submission about this report, despite being specifically requested to do so by FOS. The findings are consistent with one of the reports obtained as part of claim 1 from JH. JH’s report concluded that, during testing, water was noted to flow from the base of the stairs and the adjacent wall. This suggested that an original open ended stormwater pipe or down pipe may be positioned in the area of damage, previously serving a box gutter positioned above the family room sliding door. JH’s report stated that if this was correct, the overflow may only occur during test conditions, blockage or during heavy rainfall. There was no evidence as to where the stormwater pipework was positioned, so JH recommended the next step was to excavate the paving adjacent to the damaged area in an attempt to find it. The applicants did not do this, but instead relied on the other reports and the FSP’s decision to decline the claim on the basis of moisture creep. On the balance of probabilities and without any evidence from the FSP to the contrary, the April 2016 report establishes that the leach pipe issues have caused the current damage and are likely to have been the cause of the damage remediated in 2009. In reaching this conclusion, I have also considered the number of years that have passed since the 2009 remediation works and the current damage that forms claim 2. The applicants say the damage took a number of years to become e vident given the five courses of bricks they had replaced with a salt damp course applied in 2009. The policy covers liquid escaping from a drain or fixed pipe The FSP has provided a copy of the product disclosure statement (PDS) it says was in place at the time of the 2009 claim. The PDS states that the applicants are covered for damage or loss occurring during the period of cover caused by liquid escaping suddenly and unexpectedly from a water main, drain or fixed pipe. The PDS excludes damage or loss resulting from liquid escaping slowly over a period of time where the applicants could reasonably be expected to be aware of this condition. The PDS also excludes the cost of repairing or replacing the item from which the water escaped. The FSP has not submitted that the water did not escape suddenly or unexpectedly. Nor has it sought to rely on the exclusion based on the liquid escaping slowly over a period of time. Case No: 426553 Determination Page 4 of 7 I am therefore satisfied that the applicants have established that liquid escaping from the leach pipe was the cause of the water damage claimed in 2009. The applicants incurred costs to repair damage in 2009 In an attempt to repair the damage and prevent further water damage, the applicants paid for salt damp eradication works. They have provided receipts for $11,600 for these works. It is fair in all the circumstances for the FSP to reimburse the applicants the cost of the repairs undertaken by them in 2009. However, given this cause of the leak was not detected until 6 April 2016, it is fair that interest is payable at the rates prescribed by the Insurance Contracts Act from 7 April 2016 until the date payment is made. Case No: 426553 Determination Page 5 of 7 3 Supporting information 3.1 The FOS approach I have determined this dispute considering what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation was issued. I am satisfied the documentation I have relied on has been provided to both parties and each party has had an opportunity to address any issues raised. 3.2 FOS has jurisdiction to consider this dispute The current dispute effectively seeks to re -open dispute 201158, which was the subject of a determination. That determination, issued on 9 August 2010, found:  The FSP was entitled to deny the applicants ’ further requests for assistance in investigating the claim. This was because the FSP had paid the $1,000 required under the policy to investigate the source of the water.  The applicants had not established an insured event in respect of the water damage, and therefore were not entitled to cover under the policy.  The applicants could conduct further evacuation of the property, but such cost was to be incurred at their own expense. Under its Terms of Reference (TOR), FOS may not consider a dispute where the same events and facts is brought by the same applicant as a dispute previously dealt with by FOS. This is unless there is sufficient additional events and facts raised in the new dispute to warrant FOS’s consideration of the new dispute. I consider the current dispute does involve the same events and facts as dispute 201158. However, I am satisfied that the FSP’s acceptance of claim 2 and subsequent reports by PP are sufficient to warrant FOS’s consideration of this current dispute. I have also considered whether the current dispute was lodged out of time. Under the TOR FOS is not permitted to consider a dispute unless it is lodged within six years of the date when the applicant first became aware they suffered the loss. While the applicants are out of time to dispute the denial of the claim in 2009, the applicants are not out of time to dispute the denial of claim 3. Accordingly, I am satisfied the applicants have brought their dispute within the TOR. Case No: 426553 Determination Page 6 of 7 3.3 Chronology Date Event 19 February 2003  Applicants incept policy 24 March 2009  FSP claim notes states: “Since we moved in there has been a salt mark in the games room on the floor and the walls. I have had several repairers look at the problem. They are not sure what is happening but have said there may be a leak under the floor.” 15 April 2009  Quote for salt damp eradication 3 September 2009  According to the applicants, testing by SA notes that that areas of and levels of dampness appear consistent with slab edge dampness and / or rising damp.  Recommendation is for furt her testing with specialised equipment for storm water and sewer mains.  This document was not produced to FOS 22 October 2009  JH’s report 5 November 2009  Assessor is of the opinion that moisture is long term permeation due to p oor wat erproofing of subwalls and moisture creep.  Assessor report states applicants aware of salt damp issues when they purchased the home in 2003, but was not concerned until they decided to use the lower areas for living purpos es. 27 November 2009  FSP denies claim 1.  States that assessor has confirmed the damage to the garage floor is consistent with moisture creep.  This is not covered by the policy.  Applicants say they relied on this in arranging repairs.  Receipts for salt damp eradication amo unt to $11,600 21 January 2010  FOS acknowledges receipt of dispute for claim 1. 9 August 2010  Determination 201158 was issued in respect of claim 1. 17 November 2015  Applicants advise FSP of a water leak.  FSP notes state: “There is water coming up from the bottom. The bottom part of the flooring is damaged. It is coming back from what we have replaced.” 20 November 2015  Assessor report. 25 November 2015 PP’s report states:  The cause of damage to the sunken lounge is due to a leaking stormwat er / leach drain.  The bottom 6 - 8 br ick courses were co mpletely replaced in recent ye a r s.  Stairs adjacent externally to the affected area identified signs of previous leakage at the bas e of the stairs and conc rete pathway.  A leach drain runs along the back of bot h internal walls of the affected area. Case No: 426553 Determination Page 7 of 7 Date Event  Testing of the drain was a comprehensive failure with water visibly leaking out from under the external stairs and retaining wall.  There may also be a break in the leach drain to stormwater near the stair well.  D a mage is the result of a leaking pipe and furt her work was required to determine the source. 23 December 2015  FSP advised the decision to decline claim 1 would be maintained. 15 January 2016  IDR letter advising that current damage was caused by a separate event. This is based on there being no leaks located at the time, it was six years ago and there is no evidence that the damage is from the same source of water. 18 - 19 January 2016  PP found the leach drain was silted up and inhibiting effective conveyance of ground water away from the internal wall.  There was a major break in the drain 3 metres in from the access point outside.  A smaller PVC pipe runs inside the leach drain  Further investi gation and repair works are required. 25 January 2016  Dispute lodged with FOS 9 March 2016  FSP advises applicants that PP and engineer will be attending on 10 March 2016 to assess the condition of the pipe begins . 10 March 2016  PP and engineer meet on site. 11 March 2016  PP obtains advice from structural engineer as to how to best access the leach pipe. 4 April 2016  Notice of Response  FSP’s position on indemnity to be made after source of leak was located. 6 April 2016 PP’s final report  The leac h pipe terminates before the external foundation. It then begins again at a point 600mm past this internal side of the foundation to then travel out under the outside stairs and re - join to the stormwater system.  There is also a brok en join under the stairs.  Stormwater has been backing up and flowing out from this broken / void in the drain and then soaking int o the adjacent brick wall of the storage room.  The termination and break in the leach pipe system has been present since construction. Ini tial overflows probably dispersed into the surrounding ground.  Over time this surrounding soil probably became silted and blocked up hence leading to the current situation whereby the overflow now penetrates the wall adjacent.