Determination 426492

Cash settlement for water damage to home stumps insufficient

FirmFinancial Firm (Unknown - Insurer)
Decided2016-11-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$1,888
Non-financial loss—
Amount claimed$15,000
SourceAFCA PDF

Summary

After a burst council water main damaged the applicant's home, the FSP cash settled $10,855.13 in total. AFCA found the stump damage under-settled, ordered an extra $1,887.50 plus interest, and found the contents settlement fair.

The FSP accepted that water caused localised subsidence and the cash settlement for stump damage was not shown to be sufficient, while contents damage was fair and reasonable.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 426492 Determination Page 1 of 7 Case number: 426492 28 October 2016 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy with the financial services provider (FSP) after his home and contents were affected by water run-off from a burst council water main in August 2015. The FSP accepted the claim and cash settled the applicant for a total of $10,855.13 (after deducting the policy excess), based on the assessments of the damage provided by its contractors. The applicant says that the amount of the cash settlement is insufficient to repair all of the damage to his home and contents caused by the water. In particular, he says the FSP should be required to pay for the cost of restumping the entire property, at a cost of over $15,000. 1.2 Issues and key findings Is the FSP required to increase the settlement for building damage? The FSP is required to increase the settlement amount paid for the repair of the timber stumps (and associated damage), having regard to the extent of the damage caused by the water leak (as opposed to excluded factors) and the nature of the repairs required. Is the FSP required to increase the settlement for contents damage? The cash settlement paid by the FSP for contents damage was fair and reasonable, accordingly, the FSP is not required to increase this amount. 1.3 Determination This determination is partly in favour of the applicant. The FSP is to increase the cash settlement amount by an additional amount of $1,887.50, plus interest on this amount as set out in section 2.1 below. Case No: 426492 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP required to increase the settlement for building damage? Policy provides cover for escape of liquid subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant’s policy provides cover for damage caused by the events listed in the policy (including the insured event of ‘escape of liquid’ , subject to the conditions and exclusions contained in the policy. The policy contains general exclusions for loss or damage caused by:  wear and tear or gradual deterioration;  earth movement or soil movement (other than earthquake), including landslide, subsidence or erosion;  settling, expansion, shrinkage or vibration; or  defects in design, structure, materials, workmanship or construction. FSP has accepted liability for cost of repairing some damage to sub-floor The FSP accepts that the sub- floor of the applicant’s property was inundated by substantial volumes of water when a council water main uphill from the property burst suddenly on 31 August 2015. The water accumulated around the rear of the applicant’s patio before dissipating under the house (being the lowest point). The flow of water continued for several hours before the water main was repaired by the council. The FSP accepts that the inundation of the sub-floor caused subsidence of the stumps in a localised area at the rear of the applicant’s property, due to the flowing water having washed away the surrounding soil. Based on the findings of its engineer (NJ), the FSP cash settled the applicant for $3,775, being the estimated cost of replacing four timber stumps in the affected area and repacking some of the existing stumps. The FSP also cash settled the applicant for an additional amount of $3,300 for the replacement of an external air conditioner unit which suffered water damage. The applicant says the cash settlement paid by the FSP is insufficient to repair the damage to the timber stumps caused by water from the burst water main. He says the FSP should be required to pay for the cost of restumping the entire property. Case No: 426492 Determination Page 3 of 7 FSP says remainder of damage was caused by excluded factors As outlined above, the FSP has accepted liability for part of the damage to the sub- floor. On this basis, I am satisfied that the applicant has established a prima facie claim under the policy. In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion to deny liability for the remainder of the applicant’ s claim. The FSP says that, it is not liable for any additional damage to the sub-floor because such damage was not caused by the burst water main in August 2015, but by:  wear and tear and gradual deterioration of the timber stumps over their lifetime;  naturally occurring earth movement over an extended period of time; and  inadequate drainage at the property which allows water to pond in the sub-floor area on an ongoing basis. Burst water main caused localised movement damage only The engineer (NJ) appointed by the FSP to inspect the applicant’s property carried out floor level surveys which identified an area of relative subsidence in a bedroom at the rear of the property and an area of relative heave in the kitchen. In his report, NJ noted that, while there was some differential movement evident throughout the remainder of the house, such movement was within generally accepted tolerances. NJ considered that generalised movement of the timber stumps at the property had occurred over time, as a result of factors including:  the founding of the stumps on concrete pad footings or, in some cases, directly on the ground; and  the topography of the site and the design of the downpipes, which would result in rainwater run-off draining directly under the house or onto the surrounding soils. However, NJ acknowledged that the water leaking from the council water main may have contributed to the localised subsidence in the rear bedroom, and may also have caused slight heaving in other areas of the house. NJ concluded that the differential movement observed in the kitchen had not been caused by the effects of the water flows in August 2015, as this issue had been noted in the pre- purchase inspection report prepared by the applicant’s carpenter ( JA) in October 2013. The pre-purchase inspection report confirms that, other than in this area, there was no movement or undulation in the floors at the property (although it is unclear whether JA carried out level surveys). The statements in the pre-purchase report are consistent with NJ’s findings that, other than in the two specific areas identified, the floors were within generally accepted tolerances. Case No: 426492 Determination Page 4 of 7 The applicant disputes the findings in NJ’s report. He has provided a brief report from his carpenter (JA) which states that the water which flowed under the house in August 2015 caused uneven settling and differential movement resulting in new cracking to the interior. However, JA’s report does not include any floor level surveys or other information identifying the specific areas of the property in which he had observed differential movement. Accordingly, it is unclear whether JA identified any movement i n addition to that noted by NJ. Based on the available information, I am satisfied that the movement damage to the property caused by the burst water main in August 2015 was limited to the area of subsidence at the rear of the property identified in NJ’s report. The localised subsidence in this area is consistent with the photographs and other information provided by the parties, which show the channels in the soil around the property created by the volumes of water flowing from the burst water main. Extent of additional water damage to stumps is unclear In his report, the FSP’s engineer (NJ) identified staining to some of the stumps at the right side of the property, consistent with the effects of water from the burst water main. However, NJ concluded that a significant proportion of the stumps already required replacement prior to the mains water leak, due to ongoing deterioration as a result of the factors outlined above. There is limited information available about the extent of the water damage to the timber stumps and the cause of that damage. NJ’s report includes one indistinct photograph of the sub-floor area only (apparently due to the limited access available). The pre- purchase inspection report prepared by the applicant’s carpenter (JA) in October 2013 includes a general comment that the sub-floor structures (including the timber stumps) are in satisfactory condition. However, JA’s report does not include any photographs of the sub -floor or confirm that he gained access to this area. In the circumstances, I accept that, given the age and characteristics of the property. the timber stumps are highly likely to have deteriorated over time prior to the water leak in August 2015. However, it is also apparent that the water leak caused further damage to the timber stumps (although the extent of such damage is not entirely clear). FSP is required to increase cash settlement As outlined above, NJ found that the movement damage caused by the leaking water main was restricted to localised subsidence in the rear bedroom and slight heave in the remainder of the house. He also identified water staining to some of the timber stumps. Case No: 426492 Determination Page 5 of 7 In his report, NJ noted that his conclusion that four stumps needed to be replaced was an estimate only. He advised that, in order to accurately determine the extent of the repairs required, it would be necessary to prepare a floor framing layout plan with the stump locations clearly defined and undertake soil testing. Neither of the additional measures identified by NJ were undertaken. Instead, the FSP obtained a quotation for $3,775 from a local builder (NK) to replace the four stumps and re-level the entire house. NK’s quotation did not include any allowance for the repair of internal damage (whether caused by differential movement due to the water leak or as a result of the proposed restumping and relevelling repairs). In his submissions, the applicant has referred to cracking damage in various areas at the property which he considers was caused by the effects of the leaking water main in August 2015. Based on his inspection of the property in September 2015, NJ concluded that all of the cracking damage observed at the property was consistent with minor differenti al movement over time. However, NJ’s report did not outline the intern al damage identified or specifically consider whether any of this damage had been caused by the localised subsidence at the rear of the property. In January 2016, the applicant advised the FSP that he considered further damage to the property (including the roof) had occurred due to the ongoing effects of the water leak. However, the applicant declined the FSP’s offer to appoint a building consultant to carry out a further assessment. Based on the available information, I am satisfied that the damage to th e applicant’s property caused by the escape of water in August 2015 was broadly consistent with that identified by NJ. However, I am not satisfied that the cash settlement of $3,775 paid by the FSP (based on NK’s quotation) is necessarily sufficient to rep air all of the damage identified (noting the qualifications and limitations of NJ’s report). Having regard to the factors outlined above , I consider the FSP should be required to increase the cash settlement for the damage to the stumps (and associated damage) by 50% (to $5,662.50). The FSP is to pay interest on this additional amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 12 February 2016 until the payment date. 2.2 Is the FSP required to increase the settlement for contents damage? Cash settlement amount is fair and reasonable The FSP cash settled the applicant for $4,680.13 for water damage to contents stored in the garden shed, carport and patio area. Case No: 426492 Determination Page 6 of 7 The settlement amount was based on an invent ory list provided by the FSP’s restorer (OP) who attended the property and removed the damaged contents items. The settlement amount was calculated based on quotations for the damaged items provided by the applicant, subject to deductions for:  a glass door and screen which OP confirmed was undamaged;  50% of the quotation for replacement carpet in two rooms (as OP confirmed damaged carpet had been removed from the carport only); and  the replacement value of a lounge suite was located outside at the time of the water leak, and OP advised had suffered pre-existing damage. The applicant initially sought cover for damaged power tools valued at approximately $6,000. However, he appears to have withdrawn this aspect of the claim after the FSP sought a technician’s report to confirm the extent of the damage. Having carefully reviewed the available information (including photographs showing the general nature of the damaged items), I am satisfied that the cash settlement paid by the FSP for contents damage was fair a nd reasonable. Case No: 426492 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to an Ombudsman for determination, in line with the Operational Guidelines to the FOS Terms of Reference. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only.