After a burst pipe the FSP cash settled a home building claim for less than the applicant's quote. AFCA ordered an increased settlement excluding the benchtop, splashback tiles and contents, with interest.

The policy commits to repair the insured building as new, so undamaged sections needed to complete the repairs are covered, but upgrades and contents are not.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 426087 Determination Page 1 of 6 Case number: 426087 2 June 2016 1 Overview 1.1 Dispute The Applicant held a Home Building Insurance Policy (the policy) with the Financial Services Provider (FSP). A claim was lodged on 14 August 2015 for water damage to several areas and items of the home due to a burst pipe earlier that day. The FSP has accepted the claim however a dispute has arisen between the parties regarding the scope of works to be approved under the claim and associated offer to cash settle the claim. The Applicant is seeking a review by the Service of the FSP’s final settlement offer . He believes the claim should be settled on the basis of a quote he has obtained from consultants ‘Z’ in the amount $9,680. 1.2 Issues and key findings What is the scope of the policy? The policy provides cover or loss or damage to the insured building due to the listed insured events within the period of insurance and subject to the exclusions provided within the Product Disclosure Statement (PDS). The policy does not extend to cover loss or damage to the Applicant’ s contents e.g. damaged fridge. Is the FSP’s final settlement reasonable in the circumstances? The FSP has not been successful in establishing the final claim settlement offer for building repairs fulfils its obligations under the policy nor do I find it fair in all the circumstances. The FSP is to arrange additional payment in line with the Applicant’s quote less the cost associated with the benchtop and splashback tiles. 1.3 Determination This determination is in favour of the Applicant. The FSP is to increase its final settlement offer in line with th e Applicant’s quote less the costs associated with the benchtop and splashback tiles. The policy does not cover loss or damage to contents and therefore the FSP is not obliged to cover the cost to replace the fridge. Case No: 426087 Determination Page 2 of 6 The FSP is to pay interest upon the additional settlement amount from 17 December 2015 (three weeks from receipt of “Z’s quote) till payment is arranged to the Applicant in line with Section 57 of the Insurance Contracts Act 1984 . Case No: 426087 Determination Page 3 of 6 2 Reasons for determination 2.1 What is the scope of the policy? The policy is an insured events contract of insurance The policy provides cover or loss or damage to the insured building due to the listed insured events within the period of insurance and subject to the exclusions provided within the PDS. The policy, once a claim is accepted, commits to rebuild or repair the damage insured building as new or at the FSP’s discretion payment of the cost to re build or repair the damage accepted under the claim. The policy limits cover to only that part of the insured building that was damaged and does not extend to cover additional expenses to create a uniform appearance. I note it is not in dispute that the FSP provided and the Applicant received the relevant policy documentation including the Certificate of Insurance and PDS prior to the loss. Therefore, the FSP is entitled to rely upon the terms and conditions of the policy to determine its liability to the Applicant under the claim. I note the policy provides cover for the insured building only, therefore, I am satisfied the Applicant is not entitled to cover for damage to contents such as but limited to damage to the fridge and pool table referred to in the claim. Having considered the available information it is not in dispute the insured building did suffer water damage due to an event insured under the policy and for which the FSP has accepted the claim. It is extent of the FSP’s liability with respect to covering the Applicant’s loss that remains in dispute between the parties. Both parties have commissioned and rely upon information made available by various consultants appointed to the claim. 2.2 Is the FSP’s final settlement reasonable in the circumstances? The FSP is to increase its final settlement offer to the Applicant under the claim I have considered all of the available evidence and am satisfied on balance it establishes the following:  the Applicant lodged a claim after which the FSP arranged to have its consultants ‘TSZ’ arrange for an assessment of the insured building to determine the extent of water damage  TSZ upon completing its assessment on 17 August 2015 confirmed the water damage was consistent with the claimed event and made available a scope of works  the FSP then arranged for its consultants ‘C’ to source a repairer to undertake the recommended scope of works Case No: 426087 Determination Page 4 of 6  C informed the FSP it has located a repairer who was prepared to undertake the proposed scope of works at the recommended cost i.e. $4,657.05 (less the excess of $500)  the FSP approved the repairs however on 19 October 2015 when the repairer attended it noted further water damage as well as had concerns regarding the scope of the job arising from the age and fact the kitchen was custom built i.e. works could not completed for the costs recommended by the FSP  the repairer informed the FSP in order to effect the repairs it would need to submit variations for approval as well as may need to repair/replace some undamaged areas to complete/facilitate repairs to the damage areas  the Applicant contacted the FSP and informed it of the additional damage discovered as well as the fact the repairer was not prepared to undertake the works at the costs approved under the claim  the FSP arranged for TSZ to re-attend and a further assessment was completed which confirmed there was additional damage in the area of the bathroom that also needed to be covered under the claim  further costs and scope of works for the additional damage were submitted on 4 November 2015  the FSP requested the Applicant to pay the policy excess of $500 as well as sign an acceptance of the proposed scope of works which the Applicant did and the FSP approved the repairs  the Applicant maintains the appointed repairer again refused to do the works due to concerns with the scope of works and costing at which point he raised these concerns with the FSP  the Applicant was requested to make available quotes of his own which he did from ‘SM’ and ‘Z’. He advised his preferred quote was the lo wer of the two from Z dated 26 November 2015 in the amount $9,680  the decision to authorize repairs at this point seems to have been altered to a preferred claim settlement by way of a cash settlement. However, the FSP rejected the Applicant ’ s quotes and maintains its liability is limited to $4,157.05 in line with what it would cost the FSP to undertake the repairs  further, the FSP noted the quotes from the Applicant include repairs and items which were not water damage/unrelated to the insured event and therefore are not covered under the claim i.e. replacement of benchtop and splash back tiles  the policy provides cover for loss or damage due to the insured events and commits to rebuild or repair the insured property as new or cash settle for these costs  the policy excludes from cover repair or replacement of undamaged sections/components in order to achieve a uniform appearance  the FSP maintains the intention of the policy is not to allow betterment under a claim  the Applicant, arising from the delay FSP’ s finalizing of his claim as well as the damaged areas (kitchen/bathroom) and having to live at the home, authorized repairs in line with the quote from Z. Case No: 426087 Determination Page 5 of 6 The policy commits to rebuild/repair the insured property as new The available evidence establishes on balance that the damaged areas of the insured building and material were old. I am also satisfied the repairers were of the view that in order to repair the water damaged areas it may be necessary to replace some undamaged sections to complete the repairs which has led to a decision to cash settle the claim. There is an absence of any evidence that the need to replace undamaged sections was to achieve a uniform appearance. Rather, I am of the view on balance the information points to the need to do so arose from the fact the kitchen was custom built and the age of materials. As such, I am not satisfied the available evidence establishes this falls within the policy exclusion relating to uniform appearance. Rather, the need to replace/repair undamaged sections was necessary to effect the repairs authorised under the claim. Therefore, such additional works reasonably form part of the scope of works necessary to repair the damage covered under the claim. Further, the policy commits to repair the insured property as new, I am satisfied this reflects an acknowledgment by the policy that there may arise instances where the insured property is old and provides a commitment to repair and restore this damage new for old. Accordingly, I am not satisfied the FSP has been able to establish the need to include some undamaged sections of the insured building within the repair process falls within an exclusion under the policy. Rather, I am satisfied the available evidence establishes this inclusion of undamaged sections reasonably falls within the scope of repairs needed to repair the damage authorised under the claim and within the policy commitment to repair as new. The Applicant’s quotes include works/items not covered under the claim I accept under the circumstances, considering the areas of damage and the FSP’s delay in finalising the claim, it was reasonable for the Applicant to authorise repairs to Z, this being the lower of two quotes he had obtained. Accordingly, the matter to consider at this point is no longer whether the FSP should be required to authorise and undertake repairs rather it is how much of the costs incurred is the Applicant entitled to be reimbursed for. I have considered all of the information, scope of works and quotes made available by the consultants appointed to the claim including TSZ, C, SM and Z. I am not satisfied the FSP has been able to establish on balance the quotes from SM and Z were based on upgraded materials or that there were works quoted to achieve uniformity in appearance. Further, the FSP has not made available any direct evidence from the repairer it had authorised under the claim through C, rather, reference to this repairers views is limited to claim file notes and email exchanges (24 September 2015 – April 2016) between the FSP and C. It is clear from these communications it was not the Applicant who requested a cash settlement as he was happy for the FSP to undertake repairs. Case No: 426087 Determination Page 6 of 6 Rather, the FSP elected to cash settle the claim arising from its concerns with the scope of repairs and the appointed repairer’s refusal to undertake the works for the fund approved under the claim. In saying that, having considered the quotes from SM and Z obtained by the Applicant I do accept there are items quoted fo r which do not reasonably fall within the scope of repairs. I am satisfied the costs to replace the bench top and remove and replace splash back tiles have not been established to fall within the scope of works limited to repair the water damaged area. These additions I believe would constitute an upgrade and are not works necessary to complete the repairs to the water damaged area. Therefore, these works are excluded from cover under the claim. I have not been provide with the an itemised quote and/or invoice for the works authorised by the Applicant other than the quote submitted by Z listing the scope of works intended. However, I note in providing a quote amount of $9,680 it has included within its scope of works replacement of splash back tiles and the laminated benchtop. In the absence of compelling evidence to the contrary and matters discussed above, I accept the quote from Z represents a fair representation of the works required to repair the water damaged areas of the insured property less the replacement of the 33mm Laminate Bench top and splash back tiles. In the absence of an itemised quote and/or invoice it is not clear what the cost of these two items would be and how much of the total quote may be attributed to these two items. Accordingly, I determine the FSP is to reimburse the Applicant for his loss by arranging payment to him in an amount equal to the difference between the costs incurred by the Applicant and its payment of $4,157.05 authorised under the claim excluding the cost of the laminate benchtop and splash back tiles. Unless, it can be established these items were damaged in the course of undertaking the repairs and therefore would reasonably fall within the scope of repairs necessary to repair the damage accepted under the claim.